Permit: T21CM08365
Permit Details
Apply Date:
10/25/2021
Applicant:
AZ Design Support
Description:
SFR Addition
Contractors:
- AZ Design Support
Permit Reviews
Permit Number - T21CM08365
Permit Status: Final
Permit Description: SFR Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/25/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 11/18/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM08365
Permit Description: SFR Addition
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2021 | BUILDING - FINAL | RCHANDLER | Approved | -NR. Spoke with draftsman via Duo. Work is now complete, thus I requested the following: 1-Provide letter from licensed plumber on letterhead including license number stating: camera has been run through entire DWV system to verify it is per approved plans and Code. 2-Provide Owner-builder letter to City for records per pre-Final condition. 3-Expose a minimum of 12” horizontally on side of foundation at each exterior wall. 4-Schedule Field inspections for Roof Nailling, Ext. sheathing, and Framing to have inspector identify areas to remove for inspection. |
| 01/21/2022 | MECHANICAL - FINAL | DQUINN | Approved | Ap Close permit |
| 01/21/2022 | MECHANICAL - INTERMEDIATE | DQUINN | Approved | Ap |
| 01/21/2022 | PLUMBING - FINAL | DQUINN | Approved | Ap |
| 01/21/2022 | PLUMBING - YARD WTR LINE/TEST | DQUINN | Approved | Ap |
| 01/21/2022 | PLUMBING - INTERMEDIATE | DQUINN | Approved | Ap |
| 01/21/2022 | PLUMBING - ROUGH, SOIL | DQUINN | Approved | Ap |
| 01/21/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap |
| 01/21/2022 | ELECTRIC - UNDERGROUND | DQUINN | Approved | Ap |
| 01/21/2022 | RESIDENTIAL INTERMEDIATE | DQUINN | Approved | Ap |
| 01/21/2022 | FRAMING | DQUINN | Approved | Ap |
| 01/21/2022 | ROOF NAILING | DQUINN | Approved | Ap |
| 01/21/2022 | EXT METAL CLIPS/EXT SHEATHING | DQUINN | Approved | Ap |
| 01/21/2022 | BUILDING PRE-SLAB | DQUINN | Approved | Ap |
| 01/21/2022 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | Ap |