Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2022 | BUILDING - FINAL | Approved | Ap | |
| 12/10/2021 | BUILDING - FINAL | Not ready for Inspection | -NR. Spoke with draftsman via Duo. Work is now complete, thus I requested the following: 1-Provide letter from licensed plumber on letterhead including license number stating: camera has been run through entire DWV system to verify it is per approved plans and Code. 2-Provide Owner-builder letter to City for records per pre-Final condition. 3-Expose a minimum of 12” horizontally on side of foundation at each exterior wall. 4-Schedule Field inspections for Roof Nailling, Ext. sheathing, and Framing to have inspector identify areas to remove for inspection. |