Permit: T21CM08093
Permit Details
Apply Date:
10/12/2021
Applicant:
Description:
New restaurant
Permit Reviews
Permit Number - T21CM08093
Permit Status: Issued
Permit Description: New restaurant
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/04/2022 | RESUBMITTAL | 08/12/2022 | COMPLETED |
| 10/12/2021 | 3RD PARTY REVIEW - COMMERCIAL | 11/26/2021 | COMPLETED |
| 03/27/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/29/2023 | APPROVED |
Conditions
Permit Number - T21CM08093
Permit Status: Issued
Permit Description: New restaurant
| Date | Description | Comments |
|---|---|---|
| 11/23/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 11/23/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/12/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 11/23/2021 | SHOP DRAWINGS REQUIRED FOR KITCHEN HOOD | |
| 11/23/2021 | SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLERS | |
| 08/12/2022 | Prior to permit issuance a General Contractor Letter (GCL) is required | |
| 08/12/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM08093
Permite Description: New restaurant
Total Outstanding Inspections - 21
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
| 10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Sustainability | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
| 10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Hood System - Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Not Ready | |
| 11/09/2022 | COT - LCEL - Electrical Underground | N/A | Partial Pass | partial approval for under slab only |
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Roof Nailing | N/A | Not Ready | |
| 04/03/2023 | COT - LCBU - Framing | N/A | Partial Pass | CMU walls topped out and capped. Ok to place grout in progress areas. All CMU walls are complete except for patio area. |
| 06/07/2023 | COT - LCPL - Backwater Valve | N/A | Not Applicable | |
| 10/26/2022 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 06/04/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | |
| 06/04/2024 | COT - LCBU - Building Above Ceiling | N/A | Partial Pass | for scrim ok to proceed |
| 10/17/2025 | COT - LCME - Kitchen Hood | N/A | Partial Pass | Duct system for cooking hoods. OK to double wrap ducts and install. |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM08093
Permit Description: New restaurant
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/28/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 09/28/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 09/28/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 11/04/2022 | COT - LCPL - Rough Soil | Passed | ||
| 11/15/2022 | COT - LCBU - Preslab | Passed | ||
| 04/12/2023 | COT - LCBU - Roof Nailing | Passed | ||
| 05/11/2023 | COT - LCBU - Framing | Passed | ||
| 06/07/2023 | COT - HCPL - Yard Water Line | Passed | ||
| 06/09/2023 | COT - LCPL - Sewer | Passed | ok to cover building to HCS | |
| 02/07/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/07/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 02/07/2024 | COT - LCPL - Gas Pressure Test | Passed | Ok to set a commercial gas meter for restaurant 2/7/24 Clearance sent to SWG |
|
| 02/07/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
| 02/07/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 07/03/2025 | BULD - Electrical Clearance | Passed | 7/3/25: ECO |