Permit: T21CM07988
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4670 N CIRCUIT RD BLDG 3
Address NEW:
4670 N CIRCUIT RD BLDG 3
Apply Date:
10/08/2021
Applicant:
Description:
New Detailing Building at Royal Automotive.
Permit Reviews
Permit Number - T21CM07988
Permit Status: Complete
Permit Description: New Detailing Building at Royal Automotive.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/23/2022 | OTHER | 06/15/2022 | COMPLETED |
| 06/16/2022 | RESUBMITTAL | 06/16/2022 | COMPLETED |
| 10/08/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 11/16/2021 | COMPLETED |
| 12/08/2021 | RESUBMITTAL | 03/02/2022 | COMPLETED |
| 10/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/11/2023 | REQUIRES RESUBMIT |
| 11/08/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/08/2022 | REQUIRES RESUBMIT |
| 10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/16/2023 | APPROVED |
| 12/16/2022 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/20/2022 | APPROVED |
Conditions
Permit Number - T21CM07988
Permit Status: Complete
Permit Description: New Detailing Building at Royal Automotive.
| Date | Description | Comments |
|---|---|---|
| 12/09/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 12/09/2021 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 12/09/2021 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 12/09/2021 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
| 12/09/2021 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 12/09/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 06/16/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 12/09/2021 | SHOP DRAWINGS REQUIRED FOR TRUSSES | |
| 06/16/2022 | PIMA COUNTY WASTEWATER RECEIPT/SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM07988
Permite Description: New Detailing Building at Royal Automotive.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| 11/15/2022 | COT - FCON - Fire - Final | N/A | Re-inspection required | waiting for pictures of mounted extinghuishers, buttoned up junction boxes and building number |
| 11/29/2022 | COT - LCPL - Backwater Valve | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM07988
Permit Description: New Detailing Building at Royal Automotive.
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 06/20/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 08/10/2022 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap All walls ok for top out. } ; {Activity date: 08/03/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa Ok to grout all walls to 14’ } ; {Activity date: 08/04/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 07/27/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa All walls ok to 10’ 8” } ; {Activity date: 07/19/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa 1st lift for center wall, NW and SW mechanical rooms ok to grout. 1st lift/top out for 4’ east wall ok to grout. } |
|
| 08/31/2022 | COT - LCBU - Preslab | Passed | {Activity date: 08/31/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Slab ok to finish pour. Grease interceptor ok to backfill.} | |
| 09/07/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim Pate } |
|
| 09/07/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim Pate } |
|
| 09/07/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim Pate } |
|
| 09/14/2022 | COT - LCPL - Plumbing Progress | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 09/14/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 09/14/2022 | COT - LCPL - Yard Water Line | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok to cover } |
|
| 09/16/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/01/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa All interior pvc drains, to building exit, ok to backfill, except for the floor slit drains. Slit drains on back order and slab will be formed out for addition of slits upon arrival.} |
|
| 09/16/2022 | COT - LCPL - Sewer | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} | |
| 09/21/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 11/15/2022 | COT - LCBU - Building Above Ceiling | Passed | ||
| 11/15/2022 | COT - LCEL - Electrical Progress | Passed | ||
| 11/15/2022 | COT - LCEL - Electrical Underground | Passed | ||
| 11/15/2022 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 11/15/2022 | COT - LCME - Mechanical Progress | Passed | ||
| 11/15/2022 | COT - LCME - Mechanical Intermediate | Passed | ||
| 11/15/2022 | COT - LCBU - Building Progress | Passed | ||
| 11/21/2022 | COT - LCPL - Plumbing Final | Passed | ||
| 11/21/2022 | COT - LCEL - Outdoor Lighting | Passed | ||
| 11/21/2022 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 11/21/2022 | COT - FCON - Fire - Final | Passed | ||
| 11/21/2022 | COT - LCME - Mechanical Final | Passed | ||
| 11/22/2022 | COT - LCBU - Building Final | Passed | ||
| 11/22/2022 | BULD - Electrical Clearance | Passed | ||
| 11/25/2022 | COT - BULD - SWG Clearance | Passed | no gas in the building. | |
| 11/29/2022 | COT - LCEL - Electrical Final | Passed |