Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
10/08/2021
Applicant:
Description:
New Detailing Building at Royal Automotive.

Permit Reviews

Permit Number - T21CM07988
Permit Status: Complete
Permit Description: New Detailing Building at Royal Automotive.
Start Date Submittal Complete Date Status  
05/23/2022 OTHER 06/15/2022 COMPLETED Review Details
06/16/2022 RESUBMITTAL 06/16/2022 COMPLETED Review Details
10/08/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 11/16/2021 COMPLETED Review Details
12/08/2021 RESUBMITTAL 03/02/2022 COMPLETED Review Details
10/06/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/11/2023 REQUIRES RESUBMIT Review Details
11/08/2022 COMMERCIAL REVIEW - FULL v.1 11/08/2022 REQUIRES RESUBMIT Review Details
10/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/16/2023 APPROVED Review Details
12/16/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/20/2022 APPROVED Review Details

Conditions

Permit Number - T21CM07988
Permit Status: Complete
Permit Description: New Detailing Building at Royal Automotive.
Date Description Comments
12/09/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
12/09/2021 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
12/09/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
12/09/2021 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
12/09/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
12/09/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/16/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
12/09/2021 SHOP DRAWINGS REQUIRED FOR TRUSSES
06/16/2022 PIMA COUNTY WASTEWATER RECEIPT/SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM07988
Permite Description: New Detailing Building at Royal Automotive.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
11/15/2022 COT - FCON - Fire - Final N/A Re-inspection required waiting for pictures of mounted extinghuishers, buttoned up junction boxes and building number
11/29/2022 COT - LCPL - Backwater Valve N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: T21CM07988
Permit Description: New Detailing Building at Royal Automotive.
Total Completed Inspections - 29
Date Description Inspector Results Comments
06/20/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
06/20/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 06/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
08/10/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 08/10/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
All walls ok for top out.

} ; {Activity date: 08/03/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa
Ok to grout all walls to 14’

} ; {Activity date: 08/04/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 07/27/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa
All walls ok to 10’ 8”

} ; {Activity date: 07/19/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
1st lift for center wall, NW and SW mechanical rooms ok to grout.
1st lift/top out for 4’ east wall ok to grout.

}
08/31/2022 COT - LCBU - Preslab Passed {Activity date: 08/31/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Slab ok to finish pour. Grease interceptor ok to backfill.}
09/07/2022 COT - LCBU - Framing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim Pate

}
09/07/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim Pate

}
09/07/2022 COT - LCBU - Roof Nailing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim Pate

}
09/14/2022 COT - LCPL - Plumbing Progress Passed {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
09/14/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
09/14/2022 COT - LCPL - Yard Water Line Passed {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok to cover

}
09/16/2022 COT - LCPL - Rough Soil Passed {Activity date: 09/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/01/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
All interior pvc drains, to building exit, ok to backfill, except for the floor slit drains. Slit drains on back order and slab will be formed out for addition of slits upon arrival.}
09/16/2022 COT - LCPL - Sewer Passed {Activity date: 09/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
09/21/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 09/21/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
11/15/2022 COT - LCBU - Building Above Ceiling Passed
11/15/2022 COT - LCEL - Electrical Progress Passed
11/15/2022 COT - LCEL - Electrical Underground Passed
11/15/2022 COT - LCME - Mechanical Above Ceiling Passed
11/15/2022 COT - LCME - Mechanical Progress Passed
11/15/2022 COT - LCME - Mechanical Intermediate Passed
11/15/2022 COT - LCBU - Building Progress Passed
11/21/2022 COT - LCPL - Plumbing Final Passed
11/21/2022 COT - LCEL - Outdoor Lighting Passed
11/21/2022 COT - LCEL - Electrical Above Ceiling Passed
11/21/2022 COT - FCON - Fire - Final Passed
11/21/2022 COT - LCME - Mechanical Final Passed
11/22/2022 COT - LCBU - Building Final Passed
11/22/2022 BULD - Electrical Clearance Passed
11/25/2022 COT - BULD - SWG Clearance Passed no gas in the building.
11/29/2022 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONS-SEWER CONNECTION PERMIT P23WX01474 - BUILDING 3_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
LEXUS WATER WATER TESTING - T21CM07988 -2022-11-07_V1.PDF DOCUMENTS VIEW
REMOVE TRUSS DEFERRED SEALED LETTER_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS CERTIFICATE UPDATED - T21CM07988-2022-11-28_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW