Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
205 S BROWN ST
Address NEW:
205 S BROWN ST
Apply Date:
09/14/2021
Applicant:
BILL SWOGER
Description:
Bathroom, Pantry & Garage Addition & Remodel

Permit Reviews

Permit Number - T21CM07406
Permit Status: Issued
Permit Description: Bathroom, Pantry & Garage Addition & Remodel
Start Date Submittal Complete Date Status  
07/06/2022 REVISION - - 1ST 07/12/2022 COMPLETED Review Details
10/11/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 10/28/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: T21CM07406
Permit Description: Bathroom, Pantry & Garage Addition & Remodel
Total Completed Inspections - 18
Date Description Inspector Results Comments
12/10/2021 COT - RSPL - Rough Soil Passed {Activity date: 12/10/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP}
01/25/2022 COT - RSBU - Preslab Passed {Activity date: 01/25/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP}
05/17/2022 COT - RSBU - Roof Nailing Passed {Activity date: 05/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
05/17/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 05/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Ledger clips.

Field

12-2

Jojo wants Partial

Chris with Wentz/Patrick

}
06/17/2022 RSME - Mechanical Progress Passed {Activity date: 06/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
06/27/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/17/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval need MST nail strap on glue lamps and hanger on triple2x8 beam and double 2x8 beams
Fire wall holes not sealed with fire putty} ; {Activity date: 06/07/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - NR}
06/27/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/17/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval no DWV TEST

}
06/27/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/17/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval pressure low need 15 lbs}
06/27/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 12/28/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Master bedroom, rear porch and laundry room.}
07/15/2022 COT - LCBU - Framing Passed {Activity date: 07/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved
2 hr fire rated wall requires taping to complete

} ; {Activity date: 06/07/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 05/17/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready please call with intermediate inspections

}
07/26/2022 COT - FCON - Fire - Final Passed {Activity date: 07/26/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 10/28/2021; Status: Prior to Final Inspectn; Inspector: jpeeldavis; Comment: Entered by JPEELDA1 - Building requires a 2 hour seperation so that they do not need to install fire sprinklers. TFD has advised them to create a 2 hour seperation between the new garage and the house. New plans shall be submitted prior but building shall confirm that the seperation is there and that they have a copy of the new plans for review onsite along with the approved plans.}
10/20/2022 COT - RSPL - Yard Water Line Passed {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
01/23/2023 COT - RSEL - Electrical Final Passed
01/23/2023 COT - RSEL - Outdoor Lighting Passed
01/25/2023 COT - BULD - SWG Clearance Passed SWG clearance required
01/25/2023 RSBU - Building Final Passed
01/25/2023 COT - RSPL - Plumbing Final Passed
01/25/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
MANUAL J.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW