Permit Details

Status:
Fees Due
Type:
Commercial Building
Apply Date:
08/23/2021
Applicant:
Michael Jones
Description:
New 146,309 square foot, one story medical device sterilization facility

Permit Reviews

Permit Number - T21CM06867
Permit Status: Fees due
Permit Description: New 146,309 square foot, one story medical device sterilization facility
Start Date Submittal Complete Date Status  
05/12/2022 RESUBMITTAL 06/10/2022 COMPLETED Review Details
06/16/2022 RESUBMITTAL 07/21/2022 COMPLETED Review Details
08/23/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 09/27/2021 COMPLETED Review Details
09/20/2022 RESUBMITTAL 10/11/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM06867
Permit Status: Fees due
Permit Description: New 146,309 square foot, one story medical device sterilization facility
Total Outstanding Activity Conditions - 13
Date Name
10/04/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/04/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/04/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/11/2022 A Pima County Wastewater sign off required prior to issuance of permit.

Outstanding Inspections

Permit Status: Fees Due
Permit Number: T21CM06867
Permite Description: New 146,309 square foot, one story medical device sterilization facility
Total Outstanding Inspections - 35
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - HCBU - Building Above Ceiling N/A Not Ready
10/26/2022 COT - HCBU - Sustainability N/A Not Ready
10/26/2022 COT - HCME - Mechanical Final N/A Not Ready
10/26/2022 COT - HCEL - Electrical Intermediate N/A Not Ready
10/26/2022 COT - HCPL - Backwater Valve N/A Not Ready
10/26/2022 COT - FCON - Underground Flush N/A Not Ready
10/26/2022 COT - HCPL - Plumbing Progress N/A Not Ready
10/26/2022 COT - HCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - HCBU - Building Final N/A Not Ready
10/26/2022 COT - HCPL - Sewer N/A Not Ready
10/26/2022 COT - HCPL - Rough Soil N/A Not Ready
10/26/2022 COT - HCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - HCBU - Roof Nailing N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - HCPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
10/26/2022 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - HCBU - Framing N/A Not Ready
10/26/2022 COT - HCEL - Electrical Progress N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - HCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - HCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - HCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
10/26/2022 COT - HCBU - Preslab N/A Not Ready
10/26/2022 COT - HCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - HCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - HCEL - Electrical Final N/A Not Ready
10/26/2022 COT - HCME - Mechanical Above Ceiling N/A Not Ready
10/26/2022 COT - HCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - HCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/26/2022 COT - HCBU - Building Progress N/A Not Ready

Documents

File Name Document Type  
ELECTRICAL LOAD CALCULATIONS.PDF DOCUMENTS VIEW
FM 1-44.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
HAZARDOUS MATERIALS INVENTORY STATEMENT.PDF DOCUMENTS VIEW
HAZARDOUS MATERIALS MANAGEMENT PLAN.PDF DOCUMENTS VIEW
MODIFICATION REQUEST.PDF DOCUMENTS VIEW
PLAN SET PART 1.PDF DOCUMENTS VIEW
REACTIVITY DISCUSSION.PDF DOCUMENTS VIEW
SDS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
APPEAL RESPONSE.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ATEX CERTIFICATE.PDF DOCUMENTS VIEW
ATEX DECLARATION.PDF DOCUMENTS VIEW
CHAMBER PROTECTION FEATURES.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
CODE MODIFICATION APPROVAL.PDF DOCUMENTS VIEW
COMCHECK ENVELOPE.PDF DOCUMENTS VIEW
CONTRACTOR BOND.PDF DOCUMENTS VIEW