Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
635 W ROGER RD
Apply Date:
07/16/2021
Applicant:
ALLEN YEDGARI
Description:
New Animal Welfare Center Educational and Outreach Facility

Permit Reviews

Permit Number - T21CM05814
Permit Status: Issued
Permit Description: New Animal Welfare Center Educational and Outreach Facility
Start Date Submittal Complete Date Status  
07/16/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/20/2021 COMPLETED Review Details
09/28/2021 RESUBMITTAL 10/21/2021 COMPLETED Review Details
10/22/2021 RESUBMITTAL 11/03/2021 COMPLETED Review Details
12/22/2021 RESUBMITTAL 01/05/2022 COMPLETED Review Details
12/20/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/20/2023 REQUIRES RESUBMIT Review Details
04/18/2023 COMMERCIAL REVIEW - FULL v.2 04/18/2023 APPROVED Review Details
12/30/2022 COMMERCIAL REVIEW - FULL v.1 12/30/2022 REQUIRES RESUBMIT Review Details
12/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 APPROVED Review Details
12/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2023 REQUIRES RESUBMIT Review Details
01/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/11/2024 REQUIRES RESUBMIT Review Details
12/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.3 12/21/2023 APPROVED Review Details
05/08/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/08/2023 APPROVED Review Details
01/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/12/2024 APPROVED Review Details

Conditions

Permit Number - T21CM05814
Permit Status: Issued
Permit Description: New Animal Welfare Center Educational and Outreach Facility
Date Description Comments
10/25/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/25/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/25/2021 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/25/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/25/2021 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
10/25/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/25/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
01/29/2024 Final permit completion and certificate of occupancy may not be issued prior to completion of improvements in the right of way per DTM.
12/18/2023 Masonry Inspection Report submittal review is required.
12/18/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM05814
Permite Description: New Animal Welfare Center Educational and Outreach Facility
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
05/02/2023 BULD - Electrical Clearance N/A Scheduled
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
05/11/2023 COT - LCEL - Service Upgrade N/A Not Applicable
11/07/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
12/19/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
08/29/2023 COT - LCBU - Sustainability N/A Not Applicable
10/26/2022 COT - LCPL - Sewer N/A Not Ready
05/03/2023 COT - LCPL - Backwater Valve N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: T21CM05814
Permit Description: New Animal Welfare Center Educational and Outreach Facility
Total Completed Inspections - 28
Date Description Inspector Results Comments
06/03/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 06/03/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
Interior and exterior walls ok to grout first lift.} ; {Activity date: 04/13/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa
entire west building stem ok to pour} ; {Activity date: 03/21/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - - pa

80 ‘ to south and west, from NE corner, ok to grout retaining wall to top out.}
02/14/2023 COT - LCPL - Plumbing Intermediate Passed
05/02/2023 COT - LCEL - Electrical Underground Passed
05/02/2023 COT - LCEL - Electrical Final Passed Panels and disconnects for both buildings are in place. Submitted for electrical clearance at 1230 hours.
05/02/2023 COT - LCEL - Electrical Above Ceiling Passed
05/10/2023 COT - LCEL - Grounding/Bonding Passed
05/10/2023 COT - LCPL - Rough Soil Passed
05/10/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
05/10/2023 COT - LCBU - Framing Passed
05/10/2023 COT - HCBU - Interior Shear Bracing Passed
05/10/2023 COT - LCPL - Plumbing Above Ceiling Passed
05/10/2023 COT - LCBU - Preslab Passed
05/10/2023 COT - LCEL - Electrical Intermediate Passed
05/11/2023 COT - LCPL - Plumbing Progress Passed
05/11/2023 COT - LCBU - Exterior Clips/Sheathing Passed
05/11/2023 COT - LCME - Mechanical Progress Passed
05/11/2023 COT - LCEL - Electrical Progress Passed
08/29/2023 COT - LCPL - Plumbing Final Passed
08/29/2023 COT - LCME - Mechanical Final Passed
08/29/2023 COT - LCBU - Building Progress Passed
08/29/2023 COT - LCBU - Building Above Ceiling Passed
08/29/2023 COT - LCME - Mechanical Intermediate Passed
08/29/2023 COT - LCME - Mechanical Above Ceiling Passed
08/29/2023 COT - FCON - Fire - Final Passed
08/29/2023 COT - LCEL - Outdoor Lighting Passed
08/29/2023 COT - LCPL - Sewer Passed
08/29/2023 COT - LCPL - Backwater Valve Passed
12/15/2023 COT - LCBU - Building Final Passed

Scheduled Inspections

Scheduled Inspections - T21CM05814
Status: Issued
Description: New Animal Welfare Center Educational and Outreach Facility
Scheduled Date Description Entered By Entered Date
05/02/2023 BULD - Electrical Clearance Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
20-0237 HUMANE SOC. WELDING SP. IN.-2024-01-11_V1 (4)-2024-01-12_V1.PDF DOCUMENTS VIEW
REV HSSA_V3.PDF DOCUMENTS VIEW
20-0237 HUMANE SOCIETY, SP. IN. FINAL-2023-12-14_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
GEOTECH ENGINEERING REPORT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
RE_ ONE TIME BOND EXEMPTION REQUEST VALID UNTIL 07.31.2022.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
SUPPLEMENT GEOTECH ENGINEERING REPORT.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
FINAL REPORT 2304-197 PHILLIP'S PLUMBING-2023-05-02_V1.PDF DOCUMENTS VIEW
COT REV LETTER_V2.PDF DOCUMENTS VIEW