Permit: T21CM05803
Permit Details
Apply Date:
07/15/2021
Applicant:
a23 Studios
Description:
RESTAURANT WITH DRIVE-THROUGH SERVICE
Architects:
- ISMAIL BURAK BEKAT
Permit Reviews
Permit Number - T21CM05803
Permit Status: C of o
Permit Description: RESTAURANT WITH DRIVE-THROUGH SERVICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/15/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 08/13/2021 | COMPLETED |
09/27/2021 | RESUBMITTAL | 09/29/2021 | COMPLETED |
11/26/2021 | REVISION - - 1ST | 12/10/2021 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T21CM05803
Permit Description: RESTAURANT WITH DRIVE-THROUGH SERVICE
Total Completed Inspections - 46
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2021 | FIRE - FINAL | JVINCENT | Approved | -Verify gas detection alarm requirements for CO2 beverage dispensing. -Operational POA permit required |
07/30/2021 | MECHANICAL - FINAL | LBOWERS | Approved | AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION |
07/30/2021 | PLUMBING - FINAL | LBOWERS | Approved | WATER QUALITY REPORT REQUIRED PRIOR TO FINAL INSPECTION |
11/24/2021 | PLUMBING - PRE SLAB | TGAUSP | Approved | Approved |
12/03/2021 | PLUMBING - ROUGH, SOIL | DMUNIZ | Approved | Approved, Grease Interceptor install and tested ok to backfill . |
12/03/2021 | PLUMBING - YARD WTR LINE/TEST | DMUNIZ | Approved | partial, water line main install from building 10’ towards service meter. |
12/07/2021 | EXCAVATION/LAYOUT REBAR & ZON | DMUNIZ | Approved | Approved |
12/07/2021 | BUILDING PRE-SLAB | DMUNIZ | Approved | Approved |
12/09/2021 | ELECTRIC - UNDERGROUND | TGAUSP | Approved | Partial for floor box within Dining area, okay to cover |
01/04/2022 | FRAMING | TGAUSP | Approved | Approved |
01/04/2022 | ROOF NAILING | TGAUSP | Approved | Approved, okay to cover |
01/04/2022 | EXT METAL CLIPS/EXT SHEATHING | TGAUSP | Approved | Approved, okay to lath |
01/18/2022 | PLUMBING - SEWER HCS CONNECT | TGAUSP | Approved | Approved from building to private main at south side of building |
02/04/2022 | MECHANICAL - ABOVE CEILING | TGAUSP | Approved | Approved, okay to insulate and drywall |
02/04/2022 | ELECTRIC - INTERMEDIATE | TGAUSP | Approved | Approved, okay to insulate and drywall |
02/04/2022 | PLUMBING - INTERMEDIATE | TGAUSP | Approved | Approved, okay to insulate and drywall |
02/04/2022 | PLUMBING - ROOF DRAINS | TGAUSP | Approved | Approved |
02/04/2022 | PLUMBING - ABOVE CEILING | TGAUSP | Approved | Approved |
02/23/2022 | PLUMBING - GAS PRESS TEST FNL | DMUNIZ | Approved | Approved, clear southwest gas |
03/14/2022 | REINFORCED MASONRY PRE-GROUT | TGAUSP | Approved | Approved to top course of trash enclosure, okay to grout with clean out holes |
03/23/2022 | SHEET ROCK NAILING | DMUNIZ | Approved | Approved |
03/30/2022 | TEP CLEARANCE - PM | DMUNIZ | Approved | CODE ECO |
03/30/2022 | ELECTRIC - ABOVE CEILING | DMUNIZ | Approved | Approved |
03/30/2022 | ELECTRIC - PROGRESS | DMUNIZ | Approved | Approved , Clear TEP ECO |
04/18/2022 | GAS CLEARANCE | TGAUSP | Approved | CODE GAS |
04/18/2022 | PLUMBING - GAS PRESSURE TEST | TGAUSP | Approved | previously approved, please send clearance to SWG for the meter set |
05/04/2022 | BUILDING ABOVE CEILING | DMUNIZ | Approved | Approved |
05/04/2022 | U VALUE FOR WINDOW | DMUNIZ | Approved | Approved |
05/04/2022 | BUILDING - PROGRESS | DMUNIZ | Approved | Approved |
05/04/2022 | ELECTRIC - OUTDOOR LIGHTING | DMUNIZ | Approved | Approved |
05/04/2022 | ELECTRIC - FINAL | DMUNIZ | Approved | Approved |
05/04/2022 | SITE - SEWER | DMUNIZ | Approved | Approved |
05/04/2022 | PLUMBING - PROGRESS | DMUNIZ | Approved | Approved |
05/04/2022 | MECHANICAL - PROGRESS | DMUNIZ | Approved | Approved |
05/11/2022 | HEALTH DEPT - FINAL 724-7908 | JKINCAID | Approved | |
05/12/2022 | OUTDOOR LIGHTING FINAL | TGAUSP | Approved | Approved |
05/12/2022 | PLUMBING - BACK WATER VALVE | TGAUSP | Approved | Approved |
05/13/2022 | SIGN - FINAL | DROBERTS | Approved | APPROVED |
05/13/2022 | RIGHT OF WAY - FINAL | tadkins | Approved | row not affected |
05/13/2022 | MECHANICAL - INTERMEDIATE | TGAUSP | Approved | previously approved |
05/13/2022 | FIRE - KITCHEN EXH HOOD FINAL | Jfordney | Approved | Approved by c.basaldua on 5/11 |
05/19/2022 | FIRE - ALARM FINAL | CBASALDUA | Approved | |
05/27/2022 | LANDSCAPE - FINAL | DROBERTS | Approved | APPROVED |
05/27/2022 | ENGINEERING - FINAL | DROBERTS | Approved | APPROVED |
05/27/2022 | CERTIFICATE OF OCCUPANCY | DMUNIZ | Approved | Approved |
05/27/2022 | BUILDING - FINAL | DMUNIZ | Approved | Approved |