Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2022 |
ELECTRIC - UNDERGROUND |
|
Approved |
Approved |
| 02/15/2022 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial for secondary lines from the transformer to equipment at the building, okay to backfill |
| 02/09/2022 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial, 2-3” secondary conduit raceways installed from transformer location 60’ East towards SES location ok to backfill progress areas. |
| 12/09/2021 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial for floor box within Dining area, okay to cover |