Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
126 W AVIATION DR
Apply Date:
07/07/2021
Applicant:
Norma Salazar
Description:
Bedroom Addition and Remodel

Outstanding Activity Conditions

Permit Number - T21CM05556
Permit Status: Inspections
Permit Description: Bedroom Addition and Remodel
Total Outstanding Activity Conditions - 1
Date Name
08/03/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Inspections
Permit Number: T21CM05556
Permite Description: Bedroom Addition and Remodel
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/26/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/26/2022 COT - RSEL - Service Upgrade N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
10/26/2022 COT - RSBU - Masonry Pregrout N/A Not Ready
02/09/2024 RSEL - Electrical Progress N/A Partial Pass 200 amp all in one

Completed Inspections

Permit Status: Inspections
Permit Number: T21CM05556
Permit Description: Bedroom Addition and Remodel
Total Completed Inspections - 5
Date Description Inspector Results Comments
12/07/2021 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 12/07/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, okay to pour

}
12/27/2021 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 12/27/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to grout}
05/04/2022 COT - RSBU - Preslab Passed {Activity date: 05/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay for concrete placement} ; {Activity date: 12/27/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VVERA1 - NR}
02/09/2024 BULD - Electrical Clearance Passed
08/07/2025 COT - LCBU - Framing Passed 8-7-25: framing inspection approved. Okay to dry-in roof & lath exterior sheathing. Schedule intermediate inspections when ready.

Documents

File Name Document Type  
ACCULOAD REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CUT SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STEEL I-BEAM LINTELS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ACCULOAD REPORT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CUT SHEETS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW
STEEL I-BEAM LINTELS.PDF DOCUMENTS VIEW