Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - LCBU - Framing |
|
Not Ready |
|
| 02/07/2025 |
COT - LCBU - Framing |
|
Re-inspection required |
2/7/25: roof framing inspection requires re-inspection (Gable end bracing missing per plans, 2x4 blocking per detail 4a/2 at 24" o.c missing per plans. Anchor bolt spacing at 2x8 top plate shall be 48" o.c max) |
| 05/16/2025 |
COT - LCBU - Framing |
|
Re-inspection required |
5-16-25, an anchor bolt is required within 12" at each end of 2x8 then additional anchor bolt every 48" o.c...Tighten down all anchor bolts, missing gable end bracing/A-35's-see plans for details |
| 08/01/2025 |
COT - LCBU - Framing |
|
Re-inspection required |
8-1-25: missing 2' by 2' section of sheathing at north west corner of building and tighten all anchor bolts at cmu walls. |
| 08/07/2025 |
COT - LCBU - Framing |
|
Passed |
8-7-25: framing inspection approved. Okay to dry-in roof & lath exterior sheathing. Schedule intermediate inspections when ready. |