Permit: T21CM05532
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
2945 N BEAR CANYON RD BLDG 11
Address NEW:
2945 N BEAR CANYON RD BLDG 11
Apply Date:
07/06/2021
Applicant:
Aaron Knepper
Description:
New 256 unit apartment complex. There are 18 buildings. Each bldg assigned separate permit. REV2_Below please find our revised sheet list. 1. Sheet A3.0 1.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 2. Sheet A3.3 2.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 3. Sheet S2.2.2 3.1. Owner-requested revision to the exterior framing at the Recreation Building Social Room and Kitchen as indicated. 4. Sheet P0.1 4.1. Revised site gas plumbing per comments from Southwest Gas. 5. Sheet P0.2 5.1. Revised site gas plumbing per comments from Southwest Gas. 6. Sheet P1.5 6.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 6.2. Revised site gas plumbing per comments from Southwest Gas as indicated. 7. Sheet P1.6 7.1. Revised evaporative cooler location at Maintenance Building. 8. Sheet P2.2 8.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 8.2. Added drywell and freeze protection details for evaporative cooler at Maintenance Building. 9. Sheet P3.1 9.1. Revised site gas plumbing per comments from Southwest Gas as indicated. 10. Sheet P4.2 10.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 11. Sheet M1.5 11.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. Cooktop and exhaust vent removal as indicated. 12. Sheet M1.7 12.1. Revised evaporative cooler location at Maintenance Building. 13. Sheet E3.0 13.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 14. Sheet E3.1 14.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 15. Sheet E3.2 15.1. Revised evaporative cooler location at Maintenance Building. 16. Sheet E3.3 16.1. Owner-requested revision to the Recreation Building Social Room and Kitchen
Permit Reviews
Permit Number - T21CM05532
Permit Status: Issued
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each bldg assigned separate permit.
REV2_Below please find our revised sheet list. 1. Sheet A3.0 1.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 2. Sheet A3.3 2.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 3. Sheet S2.2.2 3.1. Owner-requested revision to the exterior framing at the Recreation Building Social Room and Kitchen as indicated. 4. Sheet P0.1 4.1. Revised site gas plumbing per comments from Southwest Gas. 5. Sheet P0.2 5.1. Revised site gas plumbing per comments from Southwest Gas. 6. Sheet P1.5 6.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 6.2. Revised site gas plumbing per comments from Southwest Gas as indicated. 7. Sheet P1.6 7.1. Revised evaporative cooler location at Maintenance Building. 8. Sheet P2.2 8.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 8.2. Added drywell and freeze protection details for evaporative cooler at Maintenance Building. 9. Sheet P3.1 9.1. Revised site gas plumbing per comments from Southwest Gas as indicated. 10. Sheet P4.2 10.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 11. Sheet M1.5 11.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. Cooktop and exhaust vent removal as indicated. 12. Sheet M1.7 12.1. Revised evaporative cooler location at Maintenance Building. 13. Sheet E3.0 13.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 14. Sheet E3.1 14.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 15. Sheet E3.2 15.1. Revised evaporative cooler location at Maintenance Building. 16. Sheet E3.3 16.1. Owner-requested revision to the Recreation Building Social Room and Kitchen
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2022 | RESUBMITTAL | 03/04/2022 | COMPLETED |
| 07/06/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 08/06/2021 | COMPLETED |
| 08/25/2021 | RESUBMITTAL | 09/28/2021 | COMPLETED |
| 11/01/2021 | RESUBMITTAL | 02/10/2022 | COMPLETED |
| 09/27/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/11/2024 | REQUIRES RESUBMIT |
| 05/08/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/01/2026 | APPROVED |
| 07/23/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/13/2025 | APPROVED |
| 07/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/21/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T21CM05532
Permit Status: Issued
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each bldg assigned separate permit.
REV2_Below please find our revised sheet list. 1. Sheet A3.0 1.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 2. Sheet A3.3 2.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 3. Sheet S2.2.2 3.1. Owner-requested revision to the exterior framing at the Recreation Building Social Room and Kitchen as indicated. 4. Sheet P0.1 4.1. Revised site gas plumbing per comments from Southwest Gas. 5. Sheet P0.2 5.1. Revised site gas plumbing per comments from Southwest Gas. 6. Sheet P1.5 6.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 6.2. Revised site gas plumbing per comments from Southwest Gas as indicated. 7. Sheet P1.6 7.1. Revised evaporative cooler location at Maintenance Building. 8. Sheet P2.2 8.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 8.2. Added drywell and freeze protection details for evaporative cooler at Maintenance Building. 9. Sheet P3.1 9.1. Revised site gas plumbing per comments from Southwest Gas as indicated. 10. Sheet P4.2 10.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 11. Sheet M1.5 11.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. Cooktop and exhaust vent removal as indicated. 12. Sheet M1.7 12.1. Revised evaporative cooler location at Maintenance Building. 13. Sheet E3.0 13.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 14. Sheet E3.1 14.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 15. Sheet E3.2 15.1. Revised evaporative cooler location at Maintenance Building. 16. Sheet E3.3 16.1. Owner-requested revision to the Recreation Building Social Room and Kitchen
Total Outstanding Activity Conditions - 12
| Date | Name |
|---|---|
| 07/23/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 07/23/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/23/2025 | ??? Designs must be submitted and approved prior to ... |
| 07/23/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/23/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 07/23/2025 | Separate TFD permits are required for: Fire Alarm System |
| 07/23/2025 | Separate TFD permits are required for: Fire Sprinkler System |
| 07/23/2025 | SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED. |
| 07/23/2025 | Stair Designs must be submitted and approved prior to... |
| 07/23/2025 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 07/23/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 07/23/2025 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Conditions
Permit Number - T21CM05532
Permit Status: Issued
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each bldg assigned separate permit.
REV2_Below please find our revised sheet list. 1. Sheet A3.0 1.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 2. Sheet A3.3 2.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 3. Sheet S2.2.2 3.1. Owner-requested revision to the exterior framing at the Recreation Building Social Room and Kitchen as indicated. 4. Sheet P0.1 4.1. Revised site gas plumbing per comments from Southwest Gas. 5. Sheet P0.2 5.1. Revised site gas plumbing per comments from Southwest Gas. 6. Sheet P1.5 6.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 6.2. Revised site gas plumbing per comments from Southwest Gas as indicated. 7. Sheet P1.6 7.1. Revised evaporative cooler location at Maintenance Building. 8. Sheet P2.2 8.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 8.2. Added drywell and freeze protection details for evaporative cooler at Maintenance Building. 9. Sheet P3.1 9.1. Revised site gas plumbing per comments from Southwest Gas as indicated. 10. Sheet P4.2 10.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 11. Sheet M1.5 11.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. Cooktop and exhaust vent removal as indicated. 12. Sheet M1.7 12.1. Revised evaporative cooler location at Maintenance Building. 13. Sheet E3.0 13.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 14. Sheet E3.1 14.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 15. Sheet E3.2 15.1. Revised evaporative cooler location at Maintenance Building. 16. Sheet E3.3 16.1. Owner-requested revision to the Recreation Building Social Room and Kitchen
| Date | Description | Comments |
|---|---|---|
| 02/18/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM05532
Permite Description: New 256 unit apartment complex. There are 18 buildings. Each bldg assigned separate permit.
REV2_Below please find our revised sheet list. 1. Sheet A3.0 1.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 2. Sheet A3.3 2.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 3. Sheet S2.2.2 3.1. Owner-requested revision to the exterior framing at the Recreation Building Social Room and Kitchen as indicated. 4. Sheet P0.1 4.1. Revised site gas plumbing per comments from Southwest Gas. 5. Sheet P0.2 5.1. Revised site gas plumbing per comments from Southwest Gas. 6. Sheet P1.5 6.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 6.2. Revised site gas plumbing per comments from Southwest Gas as indicated. 7. Sheet P1.6 7.1. Revised evaporative cooler location at Maintenance Building. 8. Sheet P2.2 8.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 8.2. Added drywell and freeze protection details for evaporative cooler at Maintenance Building. 9. Sheet P3.1 9.1. Revised site gas plumbing per comments from Southwest Gas as indicated. 10. Sheet P4.2 10.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 11. Sheet M1.5 11.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. Cooktop and exhaust vent removal as indicated. 12. Sheet M1.7 12.1. Revised evaporative cooler location at Maintenance Building. 13. Sheet E3.0 13.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 14. Sheet E3.1 14.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 15. Sheet E3.2 15.1. Revised evaporative cooler location at Maintenance Building. 16. Sheet E3.3 16.1. Owner-requested revision to the Recreation Building Social Room and Kitchen
Total Outstanding Inspections - 43
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCBU - Building Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Underground | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Roof Drains | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Outdoor Lighting | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Preslab | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | PDSD Site/Engineering Division - NPPO | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | TRSP - ROW - Final/Close-Out | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - FCON - Alarm - Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | ENGR Engineering Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - FCON - Sprinkler - Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Exterior Clips/Sheathing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Sustainability | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Rough Soil | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - FCON - Fire - Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | PDSD Building Division - Sign Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCME - Mechanical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Roof Nailing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCBU - Building Progress | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Sewer | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - HCBU - Interior Shear Bracing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Backwater Valve | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCME - Mechanical Final | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCPL - Plumbing Final | N/A | Canceled | Inspection Canceled |
| 12/18/2025 | COT - HCME - Kitchen Hood | N/A | Not Applicable | |
| 05/28/2026 | COT - HCME - Venting | N/A | Not Ready | |
| 11/06/2025 | FCON – Fire – Intermediate | N/A | Partial Pass | stub out approved. |
| 06/10/2026 | COT - HCBU - Framing | N/A | Canceled | |
| 06/10/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Canceled | |
| 06/10/2026 | COT - HCEL - Electrical Intermediate | N/A | Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM05532
Permit Description: New 256 unit apartment complex. There are 18 buildings. Each bldg assigned separate permit.
REV2_Below please find our revised sheet list. 1. Sheet A3.0 1.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 2. Sheet A3.3 2.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 3. Sheet S2.2.2 3.1. Owner-requested revision to the exterior framing at the Recreation Building Social Room and Kitchen as indicated. 4. Sheet P0.1 4.1. Revised site gas plumbing per comments from Southwest Gas. 5. Sheet P0.2 5.1. Revised site gas plumbing per comments from Southwest Gas. 6. Sheet P1.5 6.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 6.2. Revised site gas plumbing per comments from Southwest Gas as indicated. 7. Sheet P1.6 7.1. Revised evaporative cooler location at Maintenance Building. 8. Sheet P2.2 8.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 8.2. Added drywell and freeze protection details for evaporative cooler at Maintenance Building. 9. Sheet P3.1 9.1. Revised site gas plumbing per comments from Southwest Gas as indicated. 10. Sheet P4.2 10.1. Owner-requested revision to the Recreation Building Social Room and Kitchen as indicated. 11. Sheet M1.5 11.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. Cooktop and exhaust vent removal as indicated. 12. Sheet M1.7 12.1. Revised evaporative cooler location at Maintenance Building. 13. Sheet E3.0 13.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 14. Sheet E3.1 14.1. Owner-requested revision to the Recreation Building Social Room and Kitchen. 15. Sheet E3.2 15.1. Revised evaporative cooler location at Maintenance Building. 16. Sheet E3.3 16.1. Owner-requested revision to the Recreation Building Social Room and Kitchen
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2025 | COT - HCPL - Rough Soil | Passed | ||
| 12/17/2025 | COT - HCPL - Yard Water Line | Passed | Passed 12/17/25 | |
| 12/17/2025 | COT - HCEL - Grounding/Bonding | Passed | Passed 12/17/25 | |
| 12/17/2025 | COT - HCEL - Electrical Underground | Passed | Passed 12/17/25 | |
| 12/17/2025 | COT - HCBU - Preslab | Passed | Passed 12/17/25 | |
| 12/17/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Passed 12/17/25 | |
| 04/29/2026 | COT - HCPL - Sewer | Passed | Passed 4/28/26 | |
| 05/20/2026 | COT - HCBU - Roof Nailing | Passed | by SI. | |
| 05/20/2026 | COT - HCPL - Plumbing Roof Drains | Passed | ||
| 05/28/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 06/08/2026 | FCON – Fire – Intermediate | Passed |