Permit: T21CM05255
Permit Details
Apply Date:
06/24/2021
Applicant:
Erin Price/GLHN Architects & Engineers
Description:
Replace existing boilers, hot water heaters, steam piping, and gas piping. Modify electrical system as necessary for replacement equipment.
Architects:
- Carl Kilgore
Contractors:
- DPR Construction
Permit Reviews
Permit Number - T21CM05255
Permit Status: Final
Permit Description: Replace existing boilers, hot water heaters, steam piping, and gas piping. Modify electrical system as necessary for replacement equipment.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/23/2021 | COMPLETED |
| 08/06/2021 | RESUBMITTAL | 08/10/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM05255
Permit Description: Replace existing boilers, hot water heaters, steam piping, and gas piping. Modify electrical system as necessary for replacement equipment.
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2021 | PLUMBING - PROGRESS | JBURGE | Approved | Partial. Natural gas lines to be inspected by SW Gas as per agreement with Ernie Stevens. |
| 11/03/2021 | BUILDING PRE-SLAB | JBURGE | Approved | Approved. Ok to place concrete in progress areas. |
| 12/07/2021 | ELECTRIC - PROGRESS | JBURGE | Approved | Approved |
| 12/07/2021 | ELECTRIC - FINAL | JBURGE | Approved | Approved |
| 12/07/2021 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | Approved |
| 12/07/2021 | PLUMBING - INTERMEDIATE | JBURGE | Approved | Partial. Natural gas system upgraded and is operational. System is currently under pressure testing. |
| 12/07/2021 | BUILDING - PROGRESS | JBURGE | Approved | Partial. Entry/exit corridor above ceiling; ensure penetrations are properly Fire stopped. Ok to set ceiling tiles. |
| 01/05/2022 | BOILER UNFIRED PRESSURE VESSEL | JBURGE | Approved | Approved |
| 03/23/2022 | MECHANICAL - PROGRESS | RCHANDLER | Approved | AP. Pressure test on piping for chiller. |
| 06/29/2022 | MECHANICAL - INTERMEDIATE | RCHANDLER | Approved | AP |
| 06/29/2022 | MECHANICAL - FINAL | RCHANDLER | Approved | AP |
| 06/29/2022 | PLUMBING - FINAL | RCHANDLER | Approved | AP |
| 07/25/2022 | BUILDING - FINAL | JBURGE | Approved | Approved |
| 07/25/2022 | FIRE - FINAL | wmotto | Approved | |
| 07/25/2022 | FIRE SPKLR - FINAL | wmotto | Approved |