Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
25 W LALO WY
Address NEW:
25 W LALO WY
Apply Date:
06/15/2021
Applicant:
JR Durazo
Description:
New Townhome

Permit Reviews

Permit Number - T21CM05008
Permit Status: Inspections
Permit Description: New Townhome
Start Date Submittal Complete Date Status  
07/15/2021 3RD PARTY REVIEW - RESIDENTIAL 08/04/2021 COMPLETED Review Details
08/19/2021 RESUBMITTAL 10/04/2021 COMPLETED Review Details
08/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/15/2025 APPROVED Review Details
12/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/02/2026 REQUIRES RESUBMIT Review Details
02/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/12/2026 REQUIRES RESUBMIT Review Details
04/03/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.4 04/06/2026 APPROVED Review Details
01/29/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/04/2026 REQUIRES RESUBMIT Review Details
04/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/01/2023 APPROVED Review Details

Conditions

Permit Number - T21CM05008
Permit Status: Inspections
Permit Description: New Townhome
Date Description Comments
04/06/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/06/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
04/06/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/06/2026 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: T21CM05008
Permite Description: New Townhome
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
08/07/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass 8/7/23: YWL inspections need tracer wire
07/27/2023 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Ready 7/27/23: Not ready
09/20/2024 BULD - Electrical Clearance N/A Re-inspection required 9/20/24: grounds and neutrals must be separated at sub-panels. NFPA 70 . NEC 250.142.
12/02/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 12/2/25: GFCI required at laundry/water heater room, GFCI not working at second floor bathroom, open chase at mechanical room, disconnect clearance required at mechanical room, pain clean out on exterior, knock out at mechanical room, leak repair behind refrigerator, microwave receptacle must have cover plate and cannot be further than 1/4" behind combustible material, kitchen exhaust not complete, appliances must be installed, receptacle cover plate required at garage, arc-fault required at laundry room breaker, receptacle at roof keeps tripping,supports required at refrigerant lines at roof,
12/02/2025 COT - RSEL - Electrical Final N/A Re-inspection required 12/2/25: GFCI required at laundry/water heater room, GFCI not working at second floor bathroom, open chase at mechanical room, disconnect clearance required at mechanical room, pain clean out on exterior, knock out at mechanical room, leak repair behind refrigerator, microwave receptacle must have cover plate and cannot be further than 1/4" behind combustible material, kitchen exhaust not complete, appliances must be installed, receptacle cover plate required at garage, arc-fault required at laundry room breaker, receptacle at roof keeps tripping,supports required at refrigerant lines at roof,
08/07/2026 RSBU - Building Final N/A Re-inspection required Unit 25 Threshold not meeting ada requirements. provide receptacle for bathroom lav. 2nd floor Hall way at 32”. Label disconnect and junction boxes. Provide shackle lock at water heater. Ensure dryer vents do not have screens. Still need to verify rooftops.
12/02/2025 COT - RSME - Mechanical Final N/A Re-inspection required 12/2/25: GFCI required at laundry/water heater room, GFCI not working at second floor bathroom, open chase at mechanical room, disconnect clearance required at mechanical room, pain clean out on exterior, knock out at mechanical room, leak repair behind refrigerator, microwave receptacle must have cover plate and cannot be further than 1/4" behind combustible material, kitchen exhaust not complete, appliances must be installed, receptacle cover plate required at garage, arc-fault required at laundry room breaker, receptacle at roof keeps tripping,supports required at refrigerant lines at roof,
05/08/2024 RSEL - Electrical Progress N/A Partial Pass This inspection should read ELECTRIC INTERMEDIATE: Passed
08/07/2026 COT - RSEL - Construction Power N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: T21CM05008
Permit Description: New Townhome
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/10/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
08/24/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/24/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
12/27/2022 COT - RSPL - Rough Soil Passed
12/27/2022 COT - RSPL - Sewer Passed
02/07/2023 COT - RSBU - Preslab Passed Excavation/layout-rebar for step down between buildings A & B.
07/27/2023 RSBU - Building Progress Passed
08/11/2023 COT - RSPL - Yard Water Line Passed 8/11/2023 Approved. Okay to backfill shading required.
03/22/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Ok to cover exterior walls.
04/11/2024 COT - LCBU - Framing Passed
04/18/2024 COT - LCPL - Plumbing Intermediate Passed
07/08/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
09/26/2024 BULD - Electrical Clearance Passed Ok to set meter for new service.
02/24/2026 COT - RSPL - Plumbing Final Passed
08/07/2026 COT - RSEL - Outdoor Lighting Passed
08/07/2026 COT - RSEL - Electrical Underground Passed
08/07/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/07/2026 RSEL - Electrical Progress Passed
08/07/2026 COT - LCPL - Plumbing Above Ceiling Passed
08/07/2026 COT - LCBU - Sustainability Passed
08/07/2026 RSME - Mechanical Progress Passed

Documents

File Name Document Type  
25 W LALO WAY, POST-INSTALLED ANCHOR LETTER_V1.PDF DOCUMENTS VIEW
T21CM05008 SI REPORT, REV 2 (1)-2026-03-31_V4.PDF DOCUMENTS VIEW
LAYOUT BLDG 1A - ROOF.MMDL-SSE REVIEW 230421_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 1A - 2F.MMDL-SSE REVIEW 230421_V1.PDF DOCUMENTS VIEW
LAYOUT BLDG 1A - 1F.MMDL-SSE REVIEW 230421_V1.PDF DOCUMENTS VIEW
R75765779.BLDG_1A-SSE REVIEW 230421_V1.PDF DOCUMENTS VIEW
COMPLIANCE CERT.PDF DOCUMENTS VIEW
CALC PACKAGE.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW