Permit: T21CM04991
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
41 W LALO WY
Address NEW:
41 W LALO WY
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome
Permit Reviews
Permit Number - T21CM04991
Permit Status: Issued
Permit Description: New Townhome
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2021 | 3RD PARTY REVIEW - RESIDENTIAL | 10/04/2021 | COMPLETED |
| 08/19/2021 | RESUBMITTAL | 10/04/2021 | COMPLETED |
| 04/24/2023 | RESTAMP - RESIDENTIAL v.1 | 04/24/2023 | APPROVED |
| 04/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/24/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM04991
Permit Status: Issued
Permit Description: New Townhome
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 01/17/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 08/03/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/03/2021 | SPECIAL INSPECTION IS REQUIRED FOR CONCRETE COMPRESSIVE STRENGTH |
| 08/03/2021 | SPECIAL INSPECTION IS REQUIRED FOR REBAR PLACEMENT |
| 08/03/2021 | SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION |
| 08/03/2021 | SHOP DRAWINGS REQUIRED FOR MORTAR AND GROUT |
Conditions
Permit Number - T21CM04991
Permit Status: Issued
Permit Description: New Townhome
| Date | Description | Comments |
|---|---|---|
| 08/03/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM04991
Permite Description: New Townhome
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Sustainability | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 04/06/2023 | COT - RSEL - Electrical Underground | N/A | Partial Pass | UG conduit from house panel to meter pack area ok to cover |
| 04/12/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 4/12/24: 1st floor fire wall |
| 08/07/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 8/7/23: YWL inspections need tracer wire |
| 09/20/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 9/20/24: grounds and neutrals must be separated at sub-panels. NFPA 70 . NEC 250.142. |
| 12/02/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 12/2/25: GFCI required at laundry room, AFCI BREAKER REQUIRED AT LAUNDRY ROOM, cover plate behind air handler required, seal penetration at mechanical room at ceiling, vacuum breaker required at hose bib, properly seal duct at air handler, arc fault required at circuit for blinds, sprinkler head not installed first floor, no power receptacle first floor, lock out required at water heater. |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM04991
Permit Description: New Townhome
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} | |
| 08/03/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to place concrete in progress areas.} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Footings at site for 22 W 18th St., 28 W 18th St., 32 W. 18th St., 36 W. 18th St., 40 W., 18th St. 52 W. 18th St., (Partial). Ok to place concrete in progress areas. Please add these inspection results to this permit. Call me if you have a problem. Jim. 520.349.7181. Thanks} |
|
| 09/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to shade and proceed} | |
| 11/18/2022 | COT - RSBU - Preslab | Passed | This inspection should read plumbing pre-slab | |
| 02/15/2023 | COT - RSPL - Sewer | Passed | ||
| 08/11/2023 | COT - RSPL - Yard Water Line | Passed | 8/11/2023 Approved. Okay to backfill shading required. | |
| 04/24/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 4/12/24: 1st floor fire wall 4/24/24: Third floor and roof parapet fire wall per plan ok to proceed, |
|
| 05/01/2024 | COT - LCBU - Framing | Passed | ||
| 05/01/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to cover exterior walls. | |
| 06/25/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/26/2024 | RSME - Mechanical Progress | Passed | ||
| 07/18/2024 | RSEL - Electrical Progress | Passed | Inspection should read Electric Intermediate. Ok to insulate and cover walls. | |
| 07/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/26/2024 | BULD - Electrical Clearance | Passed | Ok to set meter for new service. | |
| 06/11/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/11/2025 | COT - RSEL - Electrical Final | Passed |