Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM04991
Permit Details
Apply Date:
06/15/2021
Applicant:
JR Durazo
Description:
New Townhome
Permit Reviews
Permit Number - T21CM04991
Permit Status: Stop work order
Permit Description: New Townhome
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/14/2021 | 3RD PARTY REVIEW - RESIDENTIAL | 10/04/2021 | COMPLETED |
08/19/2021 | RESUBMITTAL | 10/04/2021 | COMPLETED |
04/24/2023 | RESTAMP - RESIDENTIAL v.1 | 04/24/2023 | APPROVED |
04/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/24/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM04991
Permit Status: Stop work order
Permit Description: New Townhome
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
08/03/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/03/2021 | SPECIAL INSPECTION IS REQUIRED FOR CONCRETE COMPRESSIVE STRENGTH |
08/03/2021 | SPECIAL INSPECTION IS REQUIRED FOR REBAR PLACEMENT |
08/03/2021 | SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION |
08/03/2021 | SHOP DRAWINGS REQUIRED FOR MORTAR AND GROUT |
Conditions
Permit Number - T21CM04991
Permit Status: Stop work order
Permit Description: New Townhome
Date | Description | Comments |
---|---|---|
08/03/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Outstanding Inspections
Permit Status: Stop Work Order
Permit Number: T21CM04991
Permite Description: New Townhome
Total Outstanding Inspections - 12
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Sustainability | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
04/06/2023 | COT - RSEL - Electrical Underground | N/A | Partial Pass | UG conduit from house panel to meter pack area ok to cover |
04/12/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 4/12/24: 1st floor fire wall |
08/07/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 8/7/23: YWL inspections need tracer wire |
09/20/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 9/20/24: grounds and neutrals must be separated at sub-panels. NFPA 70 . NEC 250.142. |
Completed Inspections
Permit Status: Stop Work Order
Permit Number: T21CM04991
Permit Description: New Townhome
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} | |
08/03/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to place concrete in progress areas.} ; {Activity date: 05/20/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Footings at site for 22 W 18th St., 28 W 18th St., 32 W. 18th St., 36 W. 18th St., 40 W., 18th St. 52 W. 18th St., (Partial). Ok to place concrete in progress areas. Please add these inspection results to this permit. Call me if you have a problem. Jim. 520.349.7181. Thanks} |
|
09/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to shade and proceed} | |
11/18/2022 | COT - RSBU - Preslab | Passed | This inspection should read plumbing pre-slab | |
02/15/2023 | COT - RSPL - Sewer | Passed | ||
08/11/2023 | COT - RSPL - Yard Water Line | Passed | 8/11/2023 Approved. Okay to backfill shading required. | |
04/24/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 4/12/24: 1st floor fire wall 4/24/24: Third floor and roof parapet fire wall per plan ok to proceed, |
|
05/01/2024 | COT - LCBU - Framing | Passed | ||
05/01/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Ok to cover exterior walls. | |
06/25/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
06/26/2024 | RSME - Mechanical Progress | Passed | ||
07/18/2024 | RSEL - Electrical Progress | Passed | Inspection should read Electric Intermediate. Ok to insulate and cover walls. | |
07/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/26/2024 | BULD - Electrical Clearance | Passed | Ok to set meter for new service. |