Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - RSPL - Plumbing Final |
|
Not Ready |
|
| 02/24/2026 |
COT - RSPL - Plumbing Final |
|
Passed |
|
| 12/02/2025 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
12/2/25: GFCI required at laundry room, AFCI BREAKER REQUIRED AT LAUNDRY ROOM, cover plate behind air handler required, seal penetration at mechanical room at ceiling, vacuum breaker required at hose bib, properly seal duct at air handler, arc fault required at circuit for blinds, sprinkler head not installed first floor, no power receptacle first floor, lock out required at water heater. |