Permit Details

Status:
Expired
Type:
Commercial Building
Address:
8755 S RITA RD
Apply Date:
06/11/2021
Applicant:
Carlos De Alva
Description:
any exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th

Permit Reviews

Permit Number - T21CM04898
Permit Status: Expired
Permit Description: any exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th
Start Date Submittal Complete Date Status  
05/17/2022 REVISION - - 2ND 05/17/2022 COMPLETED Review Details
06/11/2021 3RD PARTY REVIEW - COMMERCIAL TI 07/27/2021 COMPLETED Review Details
09/07/2021 REVISION - - 1ST 11/15/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM04898
Permit Status: Expired
Permit Description: any exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th
Date Description Comments
09/16/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
07/27/2021 Deferred Submittals for Hydrostat Unit
07/27/2021 SPECIAL INSPECTION IS REQUIRED FOR CONCRETE
07/27/2021 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL
07/27/2021 SPECIAL INSPECTION IS REQUIRED FOR HIGH STRENGTH BOLTS
07/27/2021 SPECIAL INSPECTION IS REQUIRED FOR FIELD WELDING

Completed Inspections

Permit Status: Expired
Permit Number: T21CM04898
Permit Description: any exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th
Total Completed Inspections - 17
Date Description Inspector Results Comments
08/02/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/02/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved ok for concrete placement

}
08/05/2021 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 08/05/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved

}
08/24/2021 COT - LCBU - Framing Passed {Activity date: 08/24/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved}
08/24/2021 COT - LCBU - Preslab Passed {Activity date: 08/24/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, foundation only}
08/24/2021 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 08/24/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved}
09/10/2021 COT - LCBU - Roof Nailing Passed {Activity date: 09/10/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, pending special inspection for welded deck}
11/24/2021 COT - LCBU - Building Above Ceiling Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - LCEL - Electrical Final Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - LCPL - Plumbing Final Passed {Activity date: 11/24/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
04/01/2022 COT - LCBU - Building Final Passed {Activity date: 04/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
04/01/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 04/01/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - }
04/01/2022 COT - FCON - Fire - Final Passed {Activity date: 04/01/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - }
04/01/2022 COT - LCBU - Building Progress Passed {Activity date: 04/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for 5- 1” electrical and data conduits from roof to top of unit}

Documents

File Name Document Type  
_STANTEC AGREEMENT FRM_TUC_PSA.PDF DOCUMENTS VIEW
APPEAL_FORM.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
REV1 PERMIT.PDF DOCUMENTS VIEW
REV2_PERMIT.PDF DOCUMENTS VIEW
REV1 JOB CARD.PDF DOCUMENTS VIEW
REV1 APPEAL_FORM.PDF DOCUMENTS VIEW
REV1 APPLICATION.PDF DOCUMENTS VIEW
REV1 HYDROSTAT SUBMITTAL-RESPONSE LETTER.PDF DOCUMENTS VIEW
REV2_JOB CARD.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV2_PLAN SET.PDF DOCUMENTS VIEW
SPEC_INSPEC_CERT_REVISED.PDF DOCUMENTS VIEW
REV2_PLAN SET_HYDROSTAT INSTALLATION DEFERRED SUBMITTAL.PDF DOCUMENTS VIEW
REV1 DEFERRED SUBMITTAL HYDROSTAT UNIT MWG BGAP COMMENTS.PDF DOCUMENTS VIEW
REV1 HYDROSTAT PLAN.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
APPROVED_CALCS_STRUCT.PDF DOCUMENTS VIEW
APPROVED_PLAN_SET.PDF DOCUMENTS VIEW