Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3466 S KINO PW
Apply Date:
06/09/2021
Applicant:
Description:
New Ground up Drive-Thru Restaurant with Interior seating and patio. Scope of work to include Civil,

Permit Reviews

Permit Number - T21CM04812
Permit Status: Complete
Permit Description: New Ground up Drive-Thru Restaurant with Interior seating and patio. Scope of work to include Civil,
Start Date Submittal Complete Date Status  
02/24/2022 REVISION - - 1ST 03/03/2022 COMPLETED Review Details
03/10/2022 REVISION - - 1ST 03/10/2022 COMPLETED Review Details
06/09/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/14/2021 COMPLETED Review Details
06/23/2022 REVISION - - 2ND 06/23/2022 ACTIVE Review Details
07/15/2021 RESUBMITTAL 09/01/2021 COMPLETED Review Details
12/29/2021 RESUBMITTAL 01/27/2022 COMPLETED Review Details
01/17/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/18/2023 APPROVED Review Details
01/18/2023 COMMERCIAL REVIEW - FULL v.1 02/08/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM04812
Permite Description: New Ground up Drive-Thru Restaurant with Interior seating and patio. Scope of work to include Civil,
Total Outstanding Inspections - 23
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - LCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCBU - CofO N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Progress N/A Not Ready
10/26/2022 COT - LCEL - Construction Power N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCPL - Sewer N/A Not Ready
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
12/05/2022 COT - LCEL - Electrical Progress N/A Partial Pass partial approval for above ceiling in lobby area only
12/08/2022 COT - LCEL - Electrical Above Ceiling N/A Partial Pass awaiting awning’s
12/08/2022 COT - LCBU - Building Above Ceiling N/A Partial Pass partial approval for building interior
01/04/2023 COT - FCON - Hood System - Final N/A Partial Pass Class K extinguisher needed.
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
01/10/2023 COT - ENGR - Site - Assurance Release N/A Partial Pass Contractor still needs to install the bike racks and this address is for the panda express
12/27/2022 ENGR Engineering Final N/A Complete (Recurring) Reschedule inspection wrong address
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
01/13/2023 COT - LCBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM04812
Permit Description: New Ground up Drive-Thru Restaurant with Interior seating and patio. Scope of work to include Civil,
Total Completed Inspections - 27
Date Description Inspector Results Comments
05/06/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - CODE TMPP}
05/25/2022 COT - LCPL - Rough Soil Passed {Activity date: 05/25/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - approved, Grease interceptor and sanitary/grease lines installed and tested out of foundation, ok to backfill and proceed.} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - . Partial. Plumbing under slab only.}
06/01/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 06/01/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
06/01/2022 COT - LCBU - Preslab Passed {Activity date: 06/01/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/13/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Not ready.}
06/22/2022 COT - LCPL - Backwater Valve Passed {Activity date: 06/22/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved connection to adjacent meter, okay to backfill progress areas}
06/23/2022 COT - LCPL - Yard Water Line Passed {Activity date: 06/23/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, MAIN WATER LINE INSTALLED AND TESTED WITH TRACER LINE.}
08/16/2022 COT - LCBU - Roof Nailing Passed {Activity date: 08/16/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
09/16/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 09/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Second shearwalls on west side.}
09/30/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 09/30/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
10/04/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/30/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
10/04/2022 COT - LCBU - Framing Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to insulate and cover walls} ; {Activity date: 09/30/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for south east corner only, to accommodate fridge installation ok for drywall and one side interior walls} ; {Activity date: 08/16/2022; Status: Denied; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - denied. Soffit canopy existing is 24” on center plans call for 16” on center. Canopy needs to be finished on north east of building.}
10/04/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/30/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
10/04/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 10/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/30/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
11/22/2022 BULD - Electrical Clearance Passed
12/08/2022 COT - LCME - Mechanical Above Ceiling Passed
12/08/2022 COT - LCME - Kitchen Hood Passed
01/04/2023 TRSP - ROW - Final/Close-Out Passed
01/06/2023 COT - FCON - Hood System - Final Passed
01/10/2023 PDSD Site/Engineering Division - Landscaping Passed N/A
01/10/2023 COT - LCME - Mechanical Final Passed
01/10/2023 PDSD Site/Engineering Division - NPPO Passed N/A
01/13/2023 COT - ENGR - Site - Assurance Release Passed N/A
01/13/2023 COT - LCEL - Electrical Final Passed
01/13/2023 ENGR Engineering Final Passed N/A
01/17/2023 COT - FCON - Fire - Final Passed
01/18/2023 COT - LCPL - Plumbing Final Passed
01/18/2023 COT - LCBU - Building Final Passed recommend for C/O

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONS-REV2_PLAN_V1.PDF DOCUMENTS VIEW
REV2_2 REVISION LETTER_V1.PDF DOCUMENTS VIEW
REV2_AWNING CALCS_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
PANDA EXPRESS - REPORT_V1.PDF DOCUMENTS VIEW
PANDA EXPRESS @ KINO PARKWAY FLOOR PLAN_V1.PDF DOCUMENTS VIEW
WATER REPORT-2023-01-11_V1.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRC APPROVAL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
LIGHTING SPECS.PDF DOCUMENTS VIEW
LIGHTING COMCHECK.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
MECHANICAL COMCHECK.PDF DOCUMENTS VIEW
REV1_EXHIBIT A.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
REV1_REVISION LETTER.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW