Permit: T21CM04477
Permit Details
Apply Date:
05/26/2021
Applicant:
Martin Mendoza
Description:
Bedroom closet and bath
Permit Reviews
Permit Number - T21CM04477
Permit Status: Issued
Permit Description: Bedroom closet and bath
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/26/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/23/2021 | COMPLETED |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM04477
Permit Description: Bedroom closet and bath
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/01/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill progress areas } ; {Activity date: 02/22/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CO 1. Support entire length of pipe with earth 2. Attach trace wire to sewer pipe every 10 foot 3. Bleed off shower stack, it is vapor locked 4. Place enough approved shade material on site to cover all pipe 12” after it passes inspection. NOTE: 2 bearing wall studs were notched well over 25% of its width. Stud shoes may not fit over this large notch.} ; {Activity date: 02/14/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for under slab area, pending site sewer connection} |
|
03/15/2022 | COT - RSBU - Preslab | Passed | {Activity date: 03/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved} | |
03/15/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 03/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved} | |
03/30/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 03/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
03/30/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 03/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
04/27/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 04/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
04/27/2022 | COT - LCBU - Framing | Passed | {Activity date: 04/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/30/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial, pending intermediates} | |
06/01/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 06/01/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
04/26/2023 | COT - RSPL - Plumbing Final | Passed | Construction is complete on room addition. Okay to issue C of O. | |
04/26/2023 | COT - RSEL - Electrical Final | Passed | Construction is complete on room addition. Okay to issue C of O. | |
04/26/2023 | RSBU - Building Final | Passed | Construction is complete on room addition. Okay to issue C of O. | |
04/26/2023 | COT - RSME - Mechanical Final | Passed | Construction is complete on room addition. Okay to issue C of O. |