Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough Soil
Permit Number - T21CM04477
Inspection Description - COT - RSPL - Rough Soil
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2022 | COT - RSPL - Rough Soil | TGAUSP | Approved | Entered by NGARCIA3 - Approved, okay to backfill progress areas |
02/22/2022 | COT - RSPL - Rough Soil | TLUNDBERG | Correction Required | Entered by RSALDAT1 - CO 1. Support entire length of pipe with earth 2. Attach trace wire to sewer pipe every 10 foot 3. Bleed off shower stack, it is vapor locked 4. Place enough approved shade material on site to cover all pipe 12” after it passes inspection. NOTE: 2 bearing wall studs were notched well over 25% of its width. Stud shoes may not fit over this large notch. |
02/14/2022 | COT - RSPL - Rough Soil | TGAUSP | Partial Approval | Entered by NGARCIA3 - Partial for under slab area, pending site sewer connection |