Permit: T21CM04232
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5705 E VUELTA DE NUESTRO PUEBLO
Address NEW:
5705 E VUELTA DE NUESTRO PUEBLO
Apply Date:
05/18/2021
Applicant:
Description:
SFR SALT165018 T18-M0002
Outstanding Activity Conditions
Permit Number - T21CM04232
Permit Status: Complete
Permit Description: SFR SALT165018 T18-M0002
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/18/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 05/18/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 05/18/2021 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM04232
Permite Description: SFR SALT165018 T18-M0002
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM04232
Permit Description: SFR SALT165018 T18-M0002
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2021 | COT - RSPL - Yard Water Line | Passed | {Activity date: 06/02/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } | |
| 06/02/2021 | COT - RSPL - Sewer | Passed | {Activity date: 06/02/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } | |
| 06/02/2021 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/02/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } | |
| 06/14/2021 | COT - RSBU - Preslab | Passed | {Activity date: 06/14/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } ; {Activity date: 06/11/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } | |
| 06/14/2021 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/14/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } ; {Activity date: 06/11/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } | |
| 01/21/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 01/21/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - CODE ECO} | |
| 01/21/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 01/21/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved Clear TEP ECO} | |
| 03/03/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 03/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/25/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR 1. Truss calcs not on site} ; {Activity date: 02/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 02/14/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} |
|
| 03/03/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 03/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/25/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - . CO 1. Missing two HD10 at back right corner, install two HD5 replacements} ; {Activity date: 02/23/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR No plans on site} ; {Activity date: 02/14/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready , install missing shear panels } |
|
| 07/19/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 08/04/2022 | COT - LCBU - Framing | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 02/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} | |
| 09/16/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/02/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE 1. Maintain min 10 feet clearance between fresh air intake and soil vent. 2. Post 3-ply girder truss at each floor and between 3. Vents are dry} ; {Activity date: 08/24/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE 1. Fire block gap in blocking at soffit line in the powder room 2. Maintain a min 10 feet clearance between fresh air intake and vents 3. Post the 3-ply girder on the 2nd floor continuous thru the 1st floor } ; {Activity date: 08/08/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE 1. Fire lock gaps in soffit at powder room. 2. Temper bathroom stationary & slider window. 3. Maintain min 10 feet between fresh air intake and vent. 4. Relocate romex wire in attic access opening 5. Posting of 3-ply girder truss required to be continuous from 1st floor to girder} ; {Activity date: 07/29/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, fire stop all top plate penetrations, provide clear pathway @ attic access. } ; {Activity date: 07/19/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE 1. Exterior wall stud over-notched twice in garage 2. Vents are dry 3. Support 3” ABS at 90’s 4. Fire-stop gaps in soffit blocking in powder room 5. Window at upstairs bathroom required to be tempered 6. Water test tubs 7. Connect wires to exhaust fan 8. Maintain a min 10 feet clearance between fresh air intake and vents 9. Fire-stop top and bottom of AC duct chase 10. Relocate wire blocking access to attic at the scuttle hole 11. Continue posting of second floor 3-ply girder truss at the 1st floor west wall} |
|
| 02/06/2023 | RSBU - Building Final | Passed | ||
| 02/06/2023 | COT - RSEL - Electrical Final | Passed | ||
| 02/06/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/06/2023 | COT - RSME - Mechanical Final | Passed | ||
| 02/06/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 02/27/2023 | RSPL - Plumbing Progress | Passed | ||
| 02/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/27/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/27/2023 | RSME - Mechanical Progress | Passed |