Date Description Inspector Results Comments
09/16/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. TLUNDBERG Approved Entered by VVERA1 - AP
09/02/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. TLUNDBERG Denied Entered by VVERA1 - DE 1. Maintain min 10 feet clearance between fresh air intake and soil vent. 2. Post 3-ply girder truss at each floor and between 3. Vents are dry
08/24/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. TLUNDBERG Denied Entered by VVERA1 - DE 1. Fire block gap in blocking at soffit line in the powder room 2. Maintain a min 10 feet clearance between fresh air intake and vents 3. Post the 3-ply girder on the 2nd floor continuous thru the 1st floor
08/08/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. TLUNDBERG Denied Entered by VVERA1 - DE 1. Fire lock gaps in soffit at powder room. 2. Temper bathroom stationary & slider window. 3. Maintain min 10 feet between fresh air intake and vent. 4. Relocate romex wire in attic access opening 5. Posting of 3-ply girder truss required to be continuous from 1st floor to girder
07/29/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. DMUNIZ Correction Required Entered by NGARCIA3 - corrections required, fire stop all top plate penetrations, provide clear pathway @ attic access.
07/19/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. TLUNDBERG Denied Entered by NGARCIA3 - DE 1. Exterior wall stud over-notched twice in garage 2. Vents are dry 3. Support 3” ABS at 90’s 4. Fire-stop gaps in soffit blocking in powder room 5. Window at upstairs bathroom required to be tempered 6. Water test tubs 7. Connect wires to exhaust fan 8. Maintain a min 10 feet clearance between fresh air intake and vents 9. Fire-stop top and bottom of AC duct chase 10. Relocate wire blocking access to attic at the scuttle hole 11. Continue posting of second floor 3-ply girder truss at the 1st floor west wall