Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TLUNDBERG |
Approved |
Entered by VVERA1 - AP |
| 09/02/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TLUNDBERG |
Denied |
Entered by VVERA1 - DE
1. Maintain min 10 feet clearance between fresh air intake and soil vent.
2. Post 3-ply girder truss at each floor and between
3. Vents are dry |
| 08/24/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TLUNDBERG |
Denied |
Entered by VVERA1 - DE
1. Fire block gap in blocking at soffit line in the powder room
2. Maintain a min 10 feet clearance between fresh air intake and vents
3. Post the 3-ply girder on the 2nd floor continuous thru the 1st floor
|
| 08/08/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TLUNDBERG |
Denied |
Entered by VVERA1 - DE
1. Fire lock gaps in soffit at powder room.
2. Temper bathroom stationary & slider window.
3. Maintain min 10 feet between fresh air intake and vent.
4. Relocate romex wire in attic access opening
5. Posting of 3-ply girder truss required to be continuous from 1st floor to girder |
| 07/29/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
DMUNIZ |
Correction Required |
Entered by NGARCIA3 - corrections required, fire stop all top plate penetrations, provide clear pathway @ attic access.
|
| 07/19/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TLUNDBERG |
Denied |
Entered by NGARCIA3 - DE
1. Exterior wall stud over-notched twice in garage
2. Vents are dry
3. Support 3” ABS at 90’s
4. Fire-stop gaps in soffit blocking in powder room
5. Window at upstairs bathroom required to be tempered
6. Water test tubs
7. Connect wires to exhaust fan
8. Maintain a min 10 feet clearance between fresh air intake and vents
9. Fire-stop top and bottom of AC duct chase
10. Relocate wire blocking access to attic at the scuttle hole
11. Continue posting of second floor 3-ply girder truss at the 1st floor west wall |