Permit: T21CM03789
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
430 N FORGEUS AV
Address NEW:
430 N FORGEUS AV
Apply Date:
05/05/2021
Applicant:
Description:
Remodel SFR with Master Suite, Guest Suite, Porch and Carport addition.
Permit Reviews
Permit Number - T21CM03789
Permit Status: Complete
Permit Description: Remodel SFR with Master Suite, Guest Suite, Porch and Carport addition.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2022 | REVISION - - 1ST | 04/05/2022 | COMPLETED |
| 05/06/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/03/2021 | COMPLETED |
| 09/15/2021 | RESUBMITTAL | 09/22/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03789
Permite Description: Remodel SFR with Master Suite, Guest Suite, Porch and Carport addition.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03789
Permit Description: Remodel SFR with Master Suite, Guest Suite, Porch and Carport addition.
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 04/28/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 05/03/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/03/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. From HCS connection to double clean out.} ; {Activity date: 04/28/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for under slab guest house to location of existing electrical panel on existing house, ok to cover} | |
| 05/06/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 05/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap Ok to backfill pex from meter to front house riser.} ; {Activity date: 04/28/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for Guest house to location of existing electrical panel on existing house OK to cover } |
|
| 05/26/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} | |
| 05/26/2022 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} | |
| 05/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} | |
| 08/03/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} | |
| 08/23/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 08/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Inspection performed on 22 August} ; {Activity date: 08/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/17/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Need straps at every entry door and titan bolts 6” from the seams. Shiners on the wall. Need to be nailed correctly. } |
|
| 10/07/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP} | |
| 10/07/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP} ; {Activity date: 08/17/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Prior to intermediates.} | |
| 10/07/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP} | |
| 10/07/2022 | RSME - Mechanical Progress | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP} | |
| 10/07/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP} | |
| 02/07/2023 | BULD - Electrical Clearance | Passed | ||
| 04/12/2023 | COT - RSME - Mechanical Final | Passed | ||
| 04/12/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 09/28/2023 | RSBU - Building Final | Passed | Corrections were made. 9/28/2023 | |
| 09/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/28/2023 | COT - FCON - Fire - Final | Passed | ||
| 09/28/2023 | COT - RSEL - Electrical Final | Passed | Corrections were made. 9/28/2023 |