Permit: T21CM03786
Permit Details
Apply Date:
05/05/2021
Applicant:
Chris Leighton
Description:
Second Dwelling
Permit Reviews
Permit Number - T21CM03786
Permit Status: Issued
Permit Description: Second Dwelling
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/24/2022 | RESUBMITTAL | 04/28/2022 | COMPLETED |
04/28/2022 | RESUBMITTAL | 05/02/2022 | COMPLETED |
05/06/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/07/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM03786
Permit Status: Issued
Permit Description: Second Dwelling
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
05/02/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
05/02/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM03786
Permite Description: Second Dwelling
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/02/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 05/02/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
03/17/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Five feet of footing, Ok to place concrete in progress areas. |
04/17/2023 | COT - RSBU - Preslab | N/A | Partial Pass | Inspection is for top,out for Mikey block system. Ok to grout progress areas. |
05/23/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | |
07/12/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Duplicate request. |
07/12/2023 | RSME - Mechanical Progress | N/A | Partial Pass | Mechanical rough-in is complete |
07/12/2023 | RSEL - Electrical Progress | N/A | Partial Pass | Electrical rough-in is complete |
07/12/2023 | RSPL - Plumbing Progress | N/A | Partial Pass | Plumbing rough-in is complete |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM03786
Permit Description: Second Dwelling
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/16/2023 | COT - RSPL - Rough Soil | Passed | Ok to cover progress areas. | |
03/17/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
05/23/2023 | BULD - Electrical Clearance | Passed | Approved 400A 2-pack meter panel, ECO clearance to TEP is required for the construction power | |
05/23/2023 | COT - RSEL - Construction Power | Passed | ||
05/23/2023 | COT - RSEL - Electrical Underground | Passed | ||
07/12/2023 | COT - BULD - SWG Clearance | Passed | Gas line is holding 15# of air pressure. Okay to install meter. | |
07/12/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected from meter to house. | |
07/12/2023 | COT - RSBU - Roof Nailing | Passed | Roof is properly nailed off | |
07/12/2023 | COT - LCBU - Framing | Passed | Rough framing is complete, penetration are foamed | |
01/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/27/2024 | COT - RSEL - Electrical Final | Passed | ||
08/27/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/27/2024 | COT - RSME - Mechanical Final | Passed | ||
08/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |