Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/27/2021
Applicant:
Description:
SFR, one five units

Permit Reviews

Permit Number - T21CM03549
Permit Status: Complete
Permit Description: SFR, one five units
Start Date Submittal Complete Date Status  
02/03/2022 RESUBMITTAL 02/03/2022 COMPLETED Review Details
04/27/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/19/2021 COMPLETED Review Details
11/08/2021 RESUBMITTAL 12/01/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM03549
Permit Status: Complete
Permit Description: SFR, one five units
Date Description Comments
02/03/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
02/03/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM03549
Permite Description: SFR, one five units
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
07/09/2024 COT - RSEL - Construction Power N/A Not Applicable
07/26/2024 COT - RSEL - Temporary Service N/A Not Applicable
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM03549
Permit Description: SFR, one five units
Total Completed Inspections - 19
Date Description Inspector Results Comments
06/12/2023 COT - RSPL - Sewer Passed Sewer connection is complete to main sewer line. Okay to shade and backfill trenches.
06/12/2023 COT - RSEL - Electrical Underground Passed Underground conduit for electrical service is ran from transformer to building site. Okay to shade and backfill trenches.
08/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings.
08/02/2023 COT - RSBU - Preslab Passed Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings.
08/02/2023 COT - RSPL - Rough Soil Passed Underground plumbing is complete and under a water test without leaking.
08/02/2023 COT - RSEL - Grounding/Bonding Passed #4 Copper wire for Ufer ground is properly attached to the rebar reinforcement in footing.
08/02/2023 COT - RSPL - Yard Water Line Passed Water line is connected to water meter and under water pressure. Okay to shade piping and backfill trench.
11/09/2023 COT - LCBU - Framing Passed
11/09/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/09/2023 BULD - Electrical Clearance Passed 11/9/23: TEP ECO for units 1,2,3,4 and 5
11/16/2023 COT - RSBU - Roof Nailing Passed
01/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/11/2024 COT - LCPL - Plumbing Intermediate Passed
07/09/2024 RSME - Mechanical Progress Passed
07/26/2024 COT - RSEL - Electrical Final Passed
07/26/2024 RSBU - Building Final Passed
07/26/2024 COT - RSME - Mechanical Final Passed
07/26/2024 COT - RSPL - Plumbing Final Passed
07/26/2024 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HVAC MANUAL J CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 3549 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 3549 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
HVAC MANUAL J CALCS.PDF DOCUMENTS VIEW
JOB CARD 3549.PDF DOCUMENTS VIEW
PERMIT 3549.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
HVAC MANUAL J CALCS.PDF DOCUMENTS VIEW
JOB CARD 3549.PDF DOCUMENTS VIEW
PERMIT 3549.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW