Permit: T21CM03397
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10505 S WILMOT RD
Address NEW:
10505 S WILMOT RD
Apply Date:
04/22/2021
Applicant:
Paul Mickelberg
Description:
New: Vehicle inspection building (TPD evidence)
Permit Reviews
Permit Number - T21CM03397
Permit Status: Complete
Permit Description: New: Vehicle inspection building (TPD evidence)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2021 | COMMERCIAL - NEW | 06/23/2021 | COMPLETED |
| 06/23/2021 | RESUBMITTAL | 08/03/2021 | COMPLETED |
| 10/18/2022 | REVISION - - 1ST | 10/18/2022 | ACTIVE |
| 10/22/2021 | RESUBMITTAL | 07/19/2022 | COMPLETED |
| 12/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/04/2024 | APPROVED |
| 01/10/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/10/2023 | APPROVED |
| 10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/15/2022 | APPROVED |
Conditions
Permit Number - T21CM03397
Permit Status: Complete
Permit Description: New: Vehicle inspection building (TPD evidence)
| Date | Description | Comments |
|---|---|---|
| 07/19/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 09/23/2024 | Per Pima County a Septic Discharge authorization is required prior to building final inspection or certificate of occupancy. | |
| 07/19/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03397
Permite Description: New: Vehicle inspection building (TPD evidence)
Total Outstanding Inspections - 16
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCEL - Electrical Progress | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Progress | N/A | Not Ready | |
| 10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 08/17/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 10/13/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Not Applicable | |
| 08/22/2023 | BULD - Electrical Clearance | N/A | Canceled | Clearance issued on 8/17/23. |
| 10/26/2022 | COT - LCPL - Rough Soil | N/A | Not Ready | |
| 10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 03/27/2024 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| 10/26/2022 | COT - FCON - Underground Flush | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Underground Pressure | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 10/13/2023 | COT - LCEL - Electrical Final | N/A | Re-inspection required | |
| 10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
| 01/09/2023 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | City approved plans are not on site. Pour at risk pending city plans on site for inspection |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03397
Permit Description: New: Vehicle inspection building (TPD evidence)
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2023 | COT - LCBU - Roof Nailing | Passed | Roof sheathing attachment per plan. Several high-rib repair caps. A field fabricated boot was made for the inside corner area of roof where different eve flashing met. | |
| 04/20/2023 | COT - LCEL - Electrical Intermediate | Passed | Electric and plumbing in wall not ready for inspectionElectric and plumbing in wall not ready for inspection 4/18/23: All walls insulated without intermediate inspection. REMOVE all insulation from all walls for inspection and recall. 4/20/23: entire building approved |
|
| 04/20/2023 | COT - LCBU - Framing | Passed | Electric and plumbing in wall not ready for inspectionElectric and plumbing in wall not ready for inspection 4/18/23: All walls insulated without intermediate inspection. REMOVE all insulation from all walls for inspection and recall. 4/20/23: entire building approved |
|
| 04/20/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 04/20/2023 | COT - LCPL - Plumbing Intermediate | Passed | Electric and plumbing in wall not ready for inspectionElectric and plumbing in wall not ready for inspection 4/18/23: All walls insulated without intermediate inspection. REMOVE all insulation from all walls for inspection and recall. 4/20/23: entire building approved |
|
| 05/02/2023 | COT - HCBU - Interior Shear Bracing | Passed | 5/2/23: All walls OK to tape. | |
| 10/13/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 10/13/2023 | COT - LCME - Mechanical Final | Passed | ||
| 10/13/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 03/27/2024 | BULD - Electrical Clearance | Passed | ||
| 03/27/2024 | COT - LCPL - Rough Soil | Passed | ||
| 03/27/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 03/27/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
| 03/27/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
| 03/27/2024 | COT - LCBU - Preslab | Passed | ||
| 03/27/2024 | COT - LCBU - Building Progress | Passed | ||
| 03/27/2024 | COT - LCEL - Electrical Final | Passed | ||
| 03/27/2024 | COT - LCBU - Building Final | Passed | ||
| 03/27/2024 | COT - FCON - Fire - Final | Passed | ||
| 03/27/2024 | COT - FCON - Alarm - Final | Passed | ||
| 03/27/2024 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 03/27/2024 | COT - LCBU - Masonry Pregrout | Passed | ||
| 03/27/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed |