Permit: T21CM03393
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2002 S MISSION RD
Address NEW:
2002 S MISSION RD
Apply Date:
04/22/2021
Applicant:
Paul Mickelberg
Description:
The project consists of a partial remodel to an existing fire station and a building addition
Permit Reviews
Permit Number - T21CM03393
Permit Status: Complete
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2022 | REVISION - - 1ST | 03/31/2022 | COMPLETED |
| 04/22/2021 | COMMERCIAL - TI | 05/19/2021 | COMPLETED |
| 06/29/2021 | RESUBMITTAL | 07/22/2021 | COMPLETED |
| 08/02/2021 | RESUBMITTAL | 11/30/2021 | COMPLETED |
| 06/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/08/2023 | APPROVED |
| 03/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM03393
Permit Status: Complete
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 08/10/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 08/10/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. |
| 08/10/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
| 08/10/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 08/10/2021 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 08/10/2021 | SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED. |
| 08/10/2021 | SHOP DRAWINGS REQUIRED FOR NON-STRUCTURAL COMPONENT SUPPORT AND ANCHORAGE |
Conditions
Permit Number - T21CM03393
Permit Status: Complete
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
| Date | Description | Comments |
|---|---|---|
| 08/10/2021 | SHOP DRAWINGS REQUIRED FOR WOOD I-JOISTS |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03393
Permite Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCPL - Gas Pressure Test | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Roof Drains | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Sustainability | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Progress | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Progress | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
| 12/15/2022 | COT - LCEL - Electrical Progress | N/A | Partial Pass | partial approval for electrical conduits underground and ground rods south side of building ok to cover |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03393
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 03/25/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for interior remodel of restrooms, okay to backfill and pour floor} ; {Activity date: 02/08/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved connection to existing 3” main, okay to backfill} ; {Activity date: 02/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Waste and vent under foundation installed and tested, ok to backfill and prep slab.} | |
| 04/14/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 04/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Exterior sheathing progress ok to proceed. } |
|
| 04/14/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 04/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
| 04/19/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 04/25/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 04/25/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/19/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Missing nail plates, missing insulators at studs, finish interior shower.} ; {Activity date: 03/25/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR} | |
| 05/24/2022 | COT - LCBU - Framing | Passed | {Activity date: 05/24/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/19/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Missing all anchor bolts at exterior wall} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial} ; {Activity date: 03/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Rough frame inspection for ledger attachment ok to proceed with exterior sheathing, install anchor bolts prior to intermediate inspections.} | |
| 07/12/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/08/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for all walls, okay to tape and texture progress areas} | |
| 08/05/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - previously Approved} ; {Activity date: 05/14/2021; Status: Prior to 1010/1015; Inspector: JG3; Comment: Entered by JGARCIA1 - } | |
| 08/10/2022 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial. hard lid locations at utility room and bathroom} | |
| 10/12/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE} | |
| 03/16/2023 | BULD - Electrical Clearance | Passed | No need for clearance. Service increase already passed. It is now complete with landing and labeling. | |
| 03/21/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 03/21/2023 | COT - LCME - Mechanical Final | Passed | System has been balanced with evap system and mini split units. | |
| 03/21/2023 | COT - LCEL - Electrical Final | Passed | ||
| 03/21/2023 | COT - LCBU - Building Final | Passed | ||
| 03/21/2023 | COT - FCON - Fire - Final | Passed | verify alarm permit |