Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2002 S MISSION RD
Apply Date:
04/22/2021
Applicant:
Paul Mickelberg
Description:
The project consists of a partial remodel to an existing fire station and a building addition

Permit Reviews

Permit Number - T21CM03393
Permit Status: Complete
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Start Date Submittal Complete Date Status  
03/11/2022 REVISION - - 1ST 03/31/2022 COMPLETED Review Details
04/22/2021 COMMERCIAL - TI 05/19/2021 COMPLETED Review Details
06/29/2021 RESUBMITTAL 07/22/2021 COMPLETED Review Details
08/02/2021 RESUBMITTAL 11/30/2021 COMPLETED Review Details
06/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/08/2023 APPROVED Review Details
03/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM03393
Permit Status: Complete
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Outstanding Activity Conditions - 7
Date Name
08/10/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/10/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
08/10/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
08/10/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
08/10/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
08/10/2021 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
08/10/2021 SHOP DRAWINGS REQUIRED FOR NON-STRUCTURAL COMPONENT SUPPORT AND ANCHORAGE

Conditions

Permit Number - T21CM03393
Permit Status: Complete
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Date Description Comments
08/10/2021 SHOP DRAWINGS REQUIRED FOR WOOD I-JOISTS

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM03393
Permite Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Progress N/A Not Ready
10/26/2022 COT - LCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
12/15/2022 COT - LCEL - Electrical Progress N/A Partial Pass partial approval for electrical conduits underground and ground rods south side of building ok to cover

Completed Inspections

Permit Status: Complete
Permit Number: T21CM03393
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Completed Inspections - 16
Date Description Inspector Results Comments
03/25/2022 COT - LCPL - Rough Soil Passed {Activity date: 03/25/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for interior remodel of restrooms, okay to backfill and pour floor} ; {Activity date: 02/08/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved connection to existing 3” main, okay to backfill} ; {Activity date: 02/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Waste and vent under foundation installed and tested, ok to backfill and prep slab.}
04/14/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 04/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Exterior sheathing progress ok to proceed.
}
04/14/2022 COT - LCBU - Roof Nailing Passed {Activity date: 04/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
04/19/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 04/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
04/25/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 04/25/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/19/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Missing nail plates, missing insulators at studs, finish interior shower.} ; {Activity date: 03/25/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR}
05/24/2022 COT - LCBU - Framing Passed {Activity date: 05/24/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/19/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Missing all anchor bolts at exterior wall} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial} ; {Activity date: 03/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Rough frame inspection for ledger attachment ok to proceed with exterior sheathing, install anchor bolts prior to intermediate inspections.}
07/12/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 07/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/08/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for all walls, okay to tape and texture progress areas}
08/05/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - previously Approved} ; {Activity date: 05/14/2021; Status: Prior to 1010/1015; Inspector: JG3; Comment: Entered by JGARCIA1 - }
08/10/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 08/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial. hard lid locations at utility room and bathroom}
10/12/2022 COT - BULD - SWG Clearance Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE}
03/16/2023 BULD - Electrical Clearance Passed No need for clearance. Service increase already passed. It is now complete with landing and labeling.
03/21/2023 COT - LCPL - Plumbing Final Passed
03/21/2023 COT - LCME - Mechanical Final Passed System has been balanced with evap system and mini split units.
03/21/2023 COT - LCEL - Electrical Final Passed
03/21/2023 COT - LCBU - Building Final Passed
03/21/2023 COT - FCON - Fire - Final Passed verify alarm permit

Documents

File Name Document Type  
REV1_CALCULATION SHEET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_STRUCTURAL ENGINEER LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
TUCSON FIRE STATION 15 TAB REPORT_V1.PDF DOCUMENTS VIEW
REV1_CALCULATION SHEET.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REV1_STRUCTURAL ENGINEER LETTER.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
FIRE STATION 15 CHLORINATION REPORT-2023-02-22_V1.PDF DOCUMENTS VIEW
FIRE STATION 15 SPECIAL INSPECTIONS-2023-02-22_V1.PDF DOCUMENTS VIEW