Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM02680
Permit Details
Apply Date:
03/24/2021
Applicant:
N/A
Description:
RESTAURANT
Architects:
- John Dungan
Contractors:
- KDC CONSTRUCTION
Permit Reviews
Permit Number - T21CM02680
Permit Status: C of o
Permit Description: RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/24/2021 | 3RD PARTY REVIEW - COMMERCIAL | 07/22/2021 | COMPLETED |
07/22/2021 | POST 3RD PARTY REVIEW | 08/16/2021 | COMPLETED |
10/05/2021 | REVISION - - 1ST | 10/14/2021 | COMPLETED |
12/29/2021 | REVISION - - 2ND | 01/21/2022 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T21CM02680
Permit Description: RESTAURANT
Total Completed Inspections - 40
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/08/2021 | ELECTRIC - UNDERGROUND | DMUNIZ | Approved | Partial, Secondary Conduits from Transformer toe SES location and Communication conduits installed ok to backfill progress areas. |
10/08/2021 | ELECTRIC - UFER | DMUNIZ | Approved | Approved |
10/21/2021 | BUILDING PRE-SLAB | TGAUSP | Approved | Approved, okay to pour |
10/21/2021 | PLUMBING - ABOVE CEILING | TGAUSP | Approved | Approved Note: building foundation was approved 9/30/21 |
10/29/2021 | EXCAVATION/LAYOUT REBAR & ZON | DMUNIZ | Approved | PARTIAL, inspection called in for trash enclosure, referred contractor to Engineering for inspection. No inspection required for building permit today. |
11/05/2021 | PLUMBING - PRE SLAB | TGAUSP | Approved | - Approved |
11/05/2021 | PLUMBING - ROUGH, SOIL | TGAUSP | Approved | Approved to include grease interceptor, okay to backfill |
11/10/2021 | ROOF NAILING | TGAUSP | Approved | Approved |
11/10/2021 | FRAMING | TGAUSP | Approved | Approved |
11/10/2021 | EXT METAL CLIPS/EXT SHEATHING | TGAUSP | Approved | Approved with special inspection of epoxy hold downs |
12/15/2021 | REINFORCED MASONRY PRE-GROUT | TGAUSP | Approved | Approved |
12/15/2021 | PLUMBING - GAS PRESSURE TEST | TGAUSP | Approved | Approved |
12/15/2021 | PLUMBING - INTERMEDIATE | TGAUSP | Approved | Approved including roof drains |
12/15/2021 | ELECTRIC - INTERMEDIATE | TGAUSP | Approved | Approved |
12/21/2021 | MECHANICAL - ABOVE CEILING | TGAUSP | Approved | Partial at hard lid areas |
12/21/2021 | ELECTRIC - ABOVE CEILING | TGAUSP | Approved | Partial at hard lid areas |
12/28/2021 | SHEET ROCK NAILING | DMUNIZ | Approved | Approved |
01/20/2022 | MECHANICAL - HOODS | DMUNIZ | Approved | Approved |
01/27/2022 | TEP CLEARANCE - PM | DMUNIZ | Approved | CODE ECO |
01/27/2022 | ELECTRIC - CABLE DROP | DMUNIZ | Approved | Approved, Clear TEP ECO Note: plan set calls for 2-sets of 600KCMIL, FIELD verified that one set was installed, For 400AMP Service. Engineer approved field change provided. |
02/07/2022 | BUILDING ABOVE CEILING | DMUNIZ | Approved | Approved |
03/08/2022 | STUCCO MESH | DMUNIZ | Approved | Approved |
03/08/2022 | U VALUE FOR WINDOW | DMUNIZ | Approved | Approved |
03/08/2022 | ELECTRIC - OUTDOOR LIGHTING | DMUNIZ | Approved | Approved |
03/08/2022 | PLUMBING - GAS PRESS TEST FNL | DMUNIZ | Approved | Approved |
03/08/2022 | PLUMBING - SEWER HCS CONNECT | DMUNIZ | Approved | Approved |
03/08/2022 | MECHANICAL - INTERMEDIATE | DMUNIZ | Approved | Approved |
03/08/2022 | PLUMBING - MD GAS/PRECONST MTG | DMUNIZ | Approved | Not Applicable. |
03/08/2022 | PLUMBING - BACK WATER VALVE | DMUNIZ | Approved | Not Applicable. |
03/08/2022 | SITE - SEWER | DMUNIZ | Approved | Not Applicable. |
03/09/2022 | FIRE - FINAL | jfordney | Approved | |
03/09/2022 | FIRE - KITCHEN EXH HOOD FINAL | jfordney | Approved | |
03/10/2022 | BUILDING - FINAL | DMUNIZ | Approved | APPROVED BY INSPECTOR AWAITING CONDITIONS |
03/10/2022 | PLUMBING - FINAL | DMUNIZ | Approved | Approved |
03/10/2022 | MECHANICAL - FINAL | DMUNIZ | Approved | Approved |
03/10/2022 | ELECTRIC - FINAL | DMUNIZ | Approved | Approved |
03/10/2022 | OUTDOOR LIGHTING FINAL | DMUNIZ | Approved | Approved |
03/10/2022 | MECHANICAL - HOOD SYSTEMS | DMUNIZ | Approved | Approved |
03/10/2022 | BUILDING - FINAL | DMUNIZ | Approved | Approved, OK to apply for CofO all site inspections are complete and reports have been submitted for approval. |
03/24/2022 | ENGINEERING - FINAL | DROBERTS | Approved | IS APPROVED |