Permit: T21CM02423
Permit Details
Apply Date:
03/17/2021
Applicant:
Michael Becherer
Description:
Construction of a 524 car, 5 level parking garage & loading dock for the TCC Music Hall. Foundation
Permit Reviews
Permit Number - T21CM02423
Permit Status: Issued
Permit Description: Construction of a 524 car, 5 level parking garage & loading dock for the TCC Music Hall. Foundation
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/17/2021 | COMMERCIAL - NEW | 04/16/2021 | COMPLETED |
04/11/2022 | REVISION - - 1ST | 08/01/2022 | COMPLETED |
05/26/2021 | RESUBMITTAL | 07/22/2021 | COMPLETED |
07/28/2021 | RESUBMITTAL | 08/24/2021 | COMPLETED |
10/12/2021 | REVISION - - 1ST | 12/14/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM02423
Permit Status: Issued
Permit Description: Construction of a 524 car, 5 level parking garage & loading dock for the TCC Music Hall. Foundation
Total Outstanding Activity Conditions - 11
Date | Name |
---|---|
04/01/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. |
04/01/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
04/01/2021 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
04/01/2021 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
04/01/2021 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
04/01/2021 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/01/2021 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
04/01/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/01/2021 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
08/01/2022 | Do not issue this revision until the revision to DP20-0205 has been issued. |
08/05/2021 | SPECIAL INSPECTION REQUIRED FOR OUTDOOR LIGHTING |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM02423
Permite Description: Construction of a 524 car, 5 level parking garage & loading dock for the TCC Music Hall. Foundation
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/12/2022 | COT - FCON - Alarm - Final | N/A | Canceled | {Activity date: 05/12/2022; Status: Not Applicable; Inspector: wmotto1; Comment: Entered by WMOTTO1 - only need the elevator inspector to do his inspection.} |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | COT - HCBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM02423
Permit Description: Construction of a 524 car, 5 level parking garage & loading dock for the TCC Music Hall. Foundation
Total Completed Inspections - 29
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/23/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 03/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - CODE ECO} ; {Activity date: 03/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - CODE ECO} | |
03/25/2022 | COT - HCPL - Yard Water Line | Passed | {Activity date: 03/25/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Hose bibs in parking garage air tested at 100 psi.} | |
05/12/2022 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 05/12/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
05/12/2022 | COT - FCON - Fire - Final | Passed | {Activity date: 05/12/2022; Status: Partial Approval; Inspector: wmotto1; Comment: Entered by WMOTTO1 - 1. ok for TCO per tucson fire only waiting for the elevator inspectors approval paper work to give a final. Ok to occupy.} ; {Activity date: 05/12/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
05/12/2022 | FCON – OH Piping & Hydro | Passed | {Activity date: 05/12/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
07/18/2022 | COT - HCME - Mechanical Final | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/15/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} | |
07/18/2022 | COT - HCEL - Electrical Intermediate | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/23/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Partial. Panels 260D; Panel A; Panel B; Switchgear. Ok to place meters and energize systems. CLEARANCE: Code: ECO } ; {Activity date: 03/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Switch gear and panels installed. Ok to energize system. CLEARANCE: Code: ECO} |
|
07/18/2022 | COT - HCEL - Temporary Service | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCBU - Masonry Pregrout | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Southwest elevator masonry walls topped out. Ok to place grout in progress areas.} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Southwest elevator shaft at 38’ - 46’. Ok to place grout in progress areas. } ; {Activity date: 01/27/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Southwest elevator masonry walls at 24-28’. Ok to place grout in progress areas. } ; {Activity date: 01/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Southwest elevator masonry walls at 16’-20’. Ok to place grout in progress areas.} ; {Activity date: 12/28/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Elevator shaft at 8’ -16’. Level #1, Southeast corner crash wall at 12pm. Ok to place grout in progress areas.} ; {Activity date: 11/30/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. CMU walls at Levels #1 and 2: Northwest exterior stairwell; walls at 8’-12’, East wall and south wall at GL: 2/B-C; C/1-2. Ok to place grout in progress areas.} ; {Activity date: 11/12/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. CMU walls on GL: 7/A-D at 2'6"-48": 7.5-7.75/A at 0"-48"; B/7-8 at 0"-48"; D/7-8 at 0"-48"} |
|
07/18/2022 | COT - HCEL - Electrical Above Ceiling | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/21/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Exterior soffits on Levels #1 & 2, canned lighting in ceilings on South end of building. Ok to cover progress areas.} | |
07/18/2022 | COT - HCBU - Exterior Clips/Sheathing | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCPL - Sewer | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCPL - Rough Soil | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/20/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Domestic 4" water line from main water valve at Grenada entrance to water line at Northwest corner of building extension. Ok to cover progress areas.} ; {Activity date: 10/18/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Could not locate main domestic water line. Will reschedule for 19 October.} ; {Activity date: 09/14/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. 6” waste line at GL: J/4-7. Ok to cover progress areas. } ; {Activity date: 06/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Roof drain leaders (6”-12”); waste lines at 2 1/2”; West and Southwest portion of site. Ok to cover progress areas.} |
|
07/18/2022 | COT - HCBU - Stem Wall/Retaining Wall | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 01/11/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Slab #14 recalled for 11 January.} ; {Activity date: 10/01/2021; Status: Partial Approval; Inspector: jburge; Comment: Entered by NGARCIA3 - . Partial. Section III, Ramp area on GL: 5.5-8/E-J: G-J/1-5.5. Ok to place concrete in progress areas.} | |
07/18/2022 | COT - HCEL - Construction Power | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCME - Mechanical Intermediate | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/23/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Retaining wall footing at Northeast corner of parking garage. Approximately 75 feet. Concrete has been placed in appropriate areas.} ; {Activity date: 03/22/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Retaining wall footing at Northwest corner of building. Approximately 50 feet; Ok to place concrete in progress areas.} ; {Activity date: 03/15/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Partial. Planter footings at South side of garage. Approximately 100 feet X 28”. Ok to set forms and place concrete in progress areas.} ; {Activity date: 03/09/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Planter footing at GL: J.5/3 - 6. Ok to place concrete in progress areas.} ; {Activity date: 03/03/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Exterior landing for Northwest stairwell. Ok to place concrete in progress areas} ; {Activity date: 02/17/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Steps near elevator mechanical room. Ok to form and place concrete in progress area.} ; {Activity date: 02/15/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Crash walls on Levels 2; 3; 4 on GL: J/3-5. Ok to place concrete in progress areas.} ; {Activity date: 02/11/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Crash walls on Level #2 on GL: 1/F-J; Level #3 on GL: 1/F-G; J/3-4. Southwest stair landing pad (12'6" - 7'). Ok to place concrete in progress areas.} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Crash wall on Level 2-3 on GL; 8/E-F; Level #3; GL: 1/G-J; Level #4 on GL: 1/F-J. Ok to place concrete in progress areas.} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Crash wall at ramp on Level #2-#3 on GL: 8/B-E, 8/F-H. Ok to place concrete in progress areas.} ; {Activity date: 02/03/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #3, crash wall at GL: 8/B-H. Ok to place concrete in progress areas.} ; {Activity date: 02/02/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled; will reschedule for 3 February.} ; {Activity date: 01/31/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #5, crash walls on GL: H/5.6-6; J/3-4; 1/F-J. Ok to set forms and place concrete in progress areas.} ; {Activity date: 01/27/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - . Partial. Crash walls on Level 4.5 on GL: 8/E-H. Ok to place concrete in progress.} ; {Activity date: 01/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level#2, crash wall at GL: J/6-7; Level #4; crash wall on GL: 8/H.5-J. Ok to place concrete in progress areas.} ; {Activity date: 01/10/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Level #5, crash wall on GL: A/4-5.5. Ok to place concrete in progress areas.} ; {Activity date: 01/05/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Crash walls not ready to place concrete. Will reschedule for 6 January.} ; {Activity date: 01/04/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #2 crash wall on GL: A-B/2. 6” wall. Ok to place concrete in progress areas. } ; {Activity date: 12/28/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #4.5 Columns on GL: G/7. CC1, G/5, CC1, G/5.6 CC1.F/7, CC1, E/8, CC1. } ; {Activity date: 12/17/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled. Will reschedule for 20 December} ; {Activity date: 12/16/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #2; North crash wall on GL: A/2-4. Ok to place concrete in progress areas.} ; {Activity date: 12/15/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled. Rained out.} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #4; Slab #11 on GL: 1-5.5/F-J; 5.5-8/H-J. Ok to place concrete in progress areas.} ; {Activity date: 12/09/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Contractor cancelled.} ; {Activity date: 12/09/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled.} ; {Activity date: 12/07/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Level #3, slab #10: Post Tension Cable system at GL: C-F/1-5.5. Shear Wall #3 at GL: A/4-5. Ok to place concrete in progress areas.} ; {Activity date: 12/06/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #3 Columns at GL: B/5.5, CC4; B/5, CC2; B/4, CC1; B/3; CC1; B/2, CC3; A/2; CC3 B/3; CC3; C/2; CC2; C/3; CC1; C/4; CC1; C/5, CC2; C/5.4, CC3} ; {Activity date: 11/30/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #3, shear wall #1. Ok to set forms and place concrete in progress areas.} ; {Activity date: 11/29/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #3 ramp; shear wall #4 on GL: 8/D-E. Columns on GL: 5.5/B, C, D; 6/B, C, D; 7/B, C, D; 8/B, C, D. Ok to place concrete in progress areas.} ; {Activity date: 11/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #3 ramp (slab #8). Ok to place concrete in progress areas. } ; {Activity date: 11/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Part. Level #3; Columns on GL: G/1 CC3; H/1. CC3; J/3 CC2; J/4. CC2; H/6 CC2; H/7. CC1; J/7 CC2. Ok to place concrete in progress areas.} ; {Activity date: 11/16/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Level #3; Shear Wall #2 on GL: E-F/1. Ok to place concrete in progress areas. } ; {Activity date: 11/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #3 shear wall #2 on GL: E-F/1; columns on GL: D/1 CC3; E/4 CC1; F/4 CC1; F/5. CC2. Ok to place grout in progress .} ; {Activity date: 11/10/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Level #3; Shear wall #3. Ok to set forms and place concrete in progress areas.} ; {Activity date: 11/05/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Contractor cancelled. Will reschedule for 8 November} ; {Activity date: 11/04/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled, will reschedule for 8 November. } ; {Activity date: 11/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #2 ramp, columns on GL: E/8 (CC3), C/8 (CC3), D/8. (CC3), C/7 (CC1), C/6 (CC1). 0k to place concrete in progress areas.} ; {Activity date: 10/29/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #3 ramp; columns on GL: F/6 (cc1); F/7 (cc1); F/8 (cc1); G/8 (cc3 |
|
07/18/2022 | COT - HCBU - Framing | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/08/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Level #2 South exterior. } |
|
07/18/2022 | COT - HCEL - Grounding/Bonding | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCEL - Electrical Underground | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 09/20/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. 3’ conduits in electric room slab checked for possible compression during slab compaction; results: negative. } ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Information only, scheduling for future inspections.} |
|
07/18/2022 | COT - HCEL - Outdoor Lighting | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCPL - Plumbing Roof Drains | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCBU - Preslab | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 01/12/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #5, slab #15 at GL: 1-5.5/A-B. Ok to place concrete in progress areas.} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . A-B/5.5-8. Ok to place concrete in progress areas.} ; {Activity date: 12/01/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Level #3; Post Tension Slab #9. Ok to place concrete in progress areas.} ; {Activity date: 11/22/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled; will reschedule for 23 November early am. } ; {Activity date: 11/09/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #3; Post Tension Cable System on slab #6. Ok to place concrete in progress areas. } ; {Activity date: 11/03/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. A-B/5.5-8; A-C/2-5.5. Ok to place concrete in progress areas.} ; {Activity date: 10/27/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Post Tension Cable System for ramp between Levels #2 and #3. Ok to place concrete in progress.} ; {Activity date: 10/20/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Post Tension Cable System inspection was performed on 19 October.} ; {Activity date: 10/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #2, Sect 3 on GL: F-J/1-5.4; H-J/5.4-8. Ok to place concrete in progress areas} ; {Activity date: 09/24/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Section #2 at GL: 1-3/D-J, D-G/3.5-5. Ok to place concrete in progress areas.} |
|
07/18/2022 | COT - HCPL - Plumbing Final | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCPL - Plumbing Intermediate | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Partial. Waste and vent lines for Level #2 restrooms.} | |
07/18/2022 | COT - HCEL - Electrical Final | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } | |
07/18/2022 | COT - HCBU - Building Progress | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/09/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Fire caps are not installed. Will recall when caps are in place.} ; {Activity date: 05/06/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Fire inspectors denied request for Temporary Certificate of Occupancy.} ; {Activity date: 05/05/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Pre-temporary certificate of occupancy walk through.} ; {Activity date: 04/15/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Pre-Certificate of Occupancy walk through in parking garage.} ; {Activity date: 04/13/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Walk through for preparation of Certificate of Occupancy inspection. } ; {Activity date: 04/12/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Pre-Certificate of Occupancy walk through scheduling.} |
|
07/18/2022 | COT - HCBU - CofO | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - } |