Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
101 W 6TH ST
Apply Date:
03/17/2021
Applicant:
Description:
Add heating and cooling, reroute plumbing and add bathroom as well as provide ADA access

Permit Reviews

Permit Number - T21CM02412
Permit Status: Issued
Permit Description: Add heating and cooling, reroute plumbing and add bathroom as well as provide ADA access
Start Date Submittal Complete Date Status  
03/17/2021 COMMERCIAL - TI 04/19/2021 COMPLETED Review Details
05/19/2021 RESUBMITTAL 06/16/2021 COMPLETED Review Details
07/22/2021 RESUBMITTAL 08/13/2021 COMPLETED Review Details
11/26/2021 RESUBMITTAL 12/07/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM02412
Permite Description: Add heating and cooling, reroute plumbing and add bathroom as well as provide ADA access
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
10/03/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Complete (Recurring) {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved per inspection by Dave Roberts and Jim B, okay for concrete placement} ; {Activity date: 10/03/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE LOOKED OVER THE REBAR FOR THE RAMP THAT IS LOCATED ON THE WEST SIDE OF THIS SITE. THE CONTRACTOR HAS BEEN ADVISED WHAT MINOR MODIFICATIONS WILL NEED TO BE MADE PRIOR TO THE POURING OF THE FOOTER FOR THE RETAINING WALL. I HAVE ALSO ADVISED THEM THAT THIS WALL NEEDS TO HAVE ITS OWN WALL PERMIT IF POSSIBLE, THEY WILL BE CHECKING ON THIS TO MAKE A DETERMINATION.} ; {Activity date: 09/08/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Engineering is requiring a plan/review of the proposed ramp and ramp area.} ; {Activity date: 09/06/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Ramp landings are not set in place. Do not place concrete until Engineering inspects ramp.}
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - HCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - CofO N/A Not Ready
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
09/01/2023 COT - LCEL - Electrical Final N/A Partial Pass Ensure all wiring to outlets and lights is pulled.
09/01/2023 COT - LCBU - Building Progress N/A Partial Pass Information only.
02/16/2024 COT - LCEL - Outdoor Lighting N/A Not Ready 2/16/24: permit extension wanted.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM02412
Permit Description: Add heating and cooling, reroute plumbing and add bathroom as well as provide ADA access
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/10/2023 COT - LCPL - Plumbing Intermediate Passed
03/10/2023 COT - LCPL - Rough Soil Passed Ok to cover progress area.
03/10/2023 COT - LCEL - Electrical Intermediate Passed
03/10/2023 COT - LCBU - Framing Passed Ok to insulate and cover walls.

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
BEAM DESIGN.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
HVAC CALCS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
RETAINING WALL.PDF DOCUMENTS VIEW