Inspection Status: Complete (Recurring)
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 10/03/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
TGAUSP |
Approved |
Entered by NGARCIA3 - Approved per inspection by Dave Roberts and Jim B, okay for concrete placement |
| 10/03/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
DROBERTS |
Continued |
Entered by DROBERT5 - I HAVE LOOKED OVER THE REBAR FOR THE RAMP THAT IS LOCATED ON THE WEST SIDE OF THIS SITE. THE CONTRACTOR HAS BEEN ADVISED WHAT MINOR MODIFICATIONS WILL NEED TO BE MADE PRIOR TO THE POURING OF THE FOOTER FOR THE RETAINING WALL. I HAVE ALSO ADVISED THEM THAT THIS WALL NEEDS TO HAVE ITS OWN WALL PERMIT IF POSSIBLE, THEY WILL BE CHECKING ON THIS TO MAKE A DETERMINATION. |
| 09/08/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
JBURGE |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready. Engineering is requiring a plan/review of the proposed ramp and ramp area. |
| 09/06/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
JBURGE |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready. Ramp landings are not set in place. Do not place concrete until Engineering inspects ramp. |