Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
03/09/2021
Applicant:
Lisa Bowers
Description:
TCO to operate New Training Building

Permit Reviews

Permit Number - T21CM02090
Permit Status: Issued
Permit Description: TCO to operate New Training Building
Start Date Submittal Complete Date Status  
03/09/2021 COMMERCIAL - NEW 04/13/2021 COMPLETED Review Details
06/07/2021 RESUBMITTAL 07/07/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM02090
Permit Status: Issued
Permit Description: TCO to operate New Training Building
Date Description Comments
01/05/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
01/05/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
01/05/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM02090
Permite Description: TCO to operate New Training Building
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
12/22/2021 COT - LCPL - Backwater Valve N/A Canceled {Activity date: 12/22/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable}
12/29/2021 COT - LCPL - Plumbing Roof Drains N/A Canceled {Activity date: 12/29/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable}
11/04/2022 COT - FCON - Sprinkler - Final N/A Canceled Inspection Canceled
11/07/2022 COT - LCBU - Building Final N/A Canceled Inspection Canceled
11/07/2022 COT - FCON - Alarm - Final N/A Canceled Inspection Canceled
11/07/2022 COT - FCON - Fire - Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Issued
Permit Number: T21CM02090
Permit Description: TCO to operate New Training Building
Total Completed Inspections - 27
Date Description Inspector Results Comments
08/04/2021 COT - LCPL - Rough Soil Passed {Activity date: 08/04/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Approved.}
10/14/2021 COT - LCEL - Electrical Underground Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved from Southside of building to condenser unit} ; {Activity date: 09/02/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, conduit sweeps into 5 site light poles complete and on for concrete.} ; {Activity date: 08/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, Electrical conduits under slab for future feeders and branch circuits installed and ok to backfill progress.

} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From existing transformer to CT can on building.
From panel box in building to interior wall, to floor boxes,

} ; {Activity date: 08/03/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial, underground conduits including gate card readers, okay to backfill those areas.} ; {Activity date: 07/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, underground conduits ok to backfill progress areas.

}
11/09/2021 PDSD Building Division - TEP PM Clearance Passed {Activity date: 11/09/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - CODE ECO}
11/12/2021 COT - LCBU - Framing Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/14/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, for all rough framing of wall partitions and furring}
11/12/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
11/12/2021 COT - LCBU - Preslab Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
11/12/2021 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
11/12/2021 COT - LCBU - Roof Nailing Passed {Activity date: 11/12/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
11/22/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 11/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 11/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, potable water lines in restrooms installed and under test, ok to insulate and one side Sheetrock.
} ; {Activity date: 11/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, potable water lines in walls tested and ok to insulate.}
12/06/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 11/24/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Electrical in hard lid locations ok to Sheetrock progress areas.} ; {Activity date: 11/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, electrical in walls for following rooms complete (600,605,607,608,609,610,611)} ; {Activity date: 11/09/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Inspection for (400AMP-120/208V CT/DISCONNECT) APPROVED, CLEAR TEP ECO.

} ; {Activity date: 11/04/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial , in wall electrical for following rooms complete, (600,601,602,603,604).} ; {Activity date: 07/21/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Not ready.}
12/06/2021 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved}
12/06/2021 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved}
12/16/2021 COT - LCEL - Electrical Progress Passed {Activity date: 12/16/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, PANEL LD, LD1, & AC disconnects ok to energize.} ; {Activity date: 08/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial, Progress areas ok to backfill.}
12/22/2021 COT - LCPL - Plumbing Progress Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - LCME - Mechanical Progress Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - LCEL - Outdoor Lighting Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - LCBU - Sustainability Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - LCBU - Building Progress Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - LCPL - Sewer Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/22/2021 COT - HCBU - Interior Shear Bracing Passed {Activity date: 12/22/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/29/2021 COT - LCBU - Building Above Ceiling Passed {Activity date: 12/29/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 12/16/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, above ceiling progress ok to proceed.}
12/29/2021 COT - LCME - Mechanical Intermediate Passed {Activity date: 12/29/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/17/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Above ceiling mechanical ok to insulate duct.}
12/29/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 12/29/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, EGC under slab and interconnected to uffer under slab from electrical room to water line location and disconnect.
} ; {Activity date: 07/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 20’ EGC installed in column footing, And attached to rebar ok for concrete encasement.}
12/30/2021 COT - LCME - Mechanical Final Passed {Activity date: 12/30/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, field inspections complete.} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Air balance report submitted for approval.} ; {Activity date: 07/07/2021; Status: Prior to Final Inspectn; Inspector: LBOWERS; Comment: Entered by LBOWERS1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION}
12/30/2021 COT - LCEL - Electrical Final Passed {Activity date: 12/30/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 12/29/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/02/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not ready}
12/30/2021 COT - LCPL - Plumbing Final Passed {Activity date: 12/30/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, field inspections complete.} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, chlorination report submitted for approval.} ; {Activity date: 12/10/2021; Status: Prior to Final Inspectn; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 07/07/2021; Status: Prior to Final Inspectn; Inspector: LBOWERS; Comment: Entered by LBOWERS1 - WATER QUALITY REPORT REQUIRED PRIOR TO FINAL INSPECTION}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COMPLIANCE-CERTIFICATES 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT_ADDENDUM 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECHNICAL-ADDENDUM1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECHNICAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PEMB SHOP DRAWINGS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PEMB STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SICT21CM02090 - TEP PH II - TRAINING BLDG 7 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPECS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCT CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMPLIANCE-CERTIFICATES.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT_ADDENDUM.PDF DOCUMENTS VIEW
GEOTECHNICAL-ADDENDUM1.PDF DOCUMENTS VIEW
PEMB SHOP DRAWINGS.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW
STRUCT CALCS.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
SICT21CM02090 - TEP PH II - TRAINING BLDG 7.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GEOTECHNICAL.PDF DOCUMENTS VIEW
PEMB STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW