Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/11/2021
Applicant:
Michael Scarbrough
Description:
3 existing building remodels and 1 new building addition to a former abandoned commercial office add

Permit Reviews

Permit Number - T21CM01251
Permit Status: Complete
Permit Description: 3 existing building remodels and 1 new building addition to a former abandoned commercial office add
Start Date Submittal Complete Date Status  
02/11/2021 COMMERCIAL - NEW 04/26/2021 COMPLETED Review Details
04/26/2021 RESUBMITTAL 05/24/2021 COMPLETED Review Details
05/25/2021 RESUBMITTAL 09/14/2021 COMPLETED Review Details
09/14/2021 REVISION - - 1ST 09/20/2021 COMPLETED Review Details
09/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2023 APPROVED Review Details
12/08/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/15/2022 APPROVED Review Details
12/16/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/29/2022 APPROVED Review Details

Conditions

Permit Number - T21CM01251
Permit Status: Complete
Permit Description: 3 existing building remodels and 1 new building addition to a former abandoned commercial office add
Date Description Comments
02/11/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/15/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/15/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
06/15/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
06/15/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/15/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/15/2021 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
09/26/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/15/2021 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM01251
Permite Description: 3 existing building remodels and 1 new building addition to a former abandoned commercial office add
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
12/08/2022 COT - LCME - Kitchen Hood N/A Not Applicable
12/08/2022 COT - LCPL - Medical Gas/Test N/A Not Applicable
12/08/2022 COT - FCON - Sprinkler - Final N/A Partial Pass No alarm yet, sprinklers not being monitored.
12/08/2022 COT - LCPL - Plumbing Final N/A Partial Pass Pending chlorination report.
12/08/2022 COT - LCME - Mechanical Final N/A Partial Pass Pending balance report.
COT - FCON - Fire - Final N/A Not Ready
01/10/2023 COT - LCBU - Building Final N/A Partial Pass Need pool complete, service permanent parts, and elevator complete. Recommend issuing TCO.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM01251
Permit Description: 3 existing building remodels and 1 new building addition to a former abandoned commercial office add
Total Completed Inspections - 32
Date Description Inspector Results Comments
10/11/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 10/11/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - APPROVED}
10/11/2021 COT - LCBU - Preslab Passed {Activity date: 10/11/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - APPROVED}
10/11/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 10/11/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - APPROVED}
12/06/2021 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 12/06/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP}
12/06/2021 COT - LCBU - Roof Nailing Passed {Activity date: 12/06/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP}
01/19/2022 COT - LCPL - Yard Water Line Passed {Activity date: 01/19/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
02/25/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 02/25/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
02/25/2022 COT - LCEL - Electrical Underground Passed {Activity date: 02/25/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
02/25/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 02/25/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
03/07/2022 COT - LCPL - Plumbing Progress Passed {Activity date: 03/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - AP Balcony drain North End.} ; {Activity date: 12/15/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/14/2021; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CA}
03/07/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 03/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/01/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready}
03/07/2022 COT - LCPL - Rough Soil Passed {Activity date: 03/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP. HCS.} ; {Activity date: 09/27/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 -
Inspection Results: 3005 (PLUMBING - ROUGH, SOIL)-PA. Inside Building; connection to existing sewer remains.}
03/10/2022 COT - LCBU - Sustainability Passed {Activity date: 03/10/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -AP

Field

12-2

Mike call with time}
03/21/2022 COT - LCBU - Building Progress Passed {Activity date: 03/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP. Pre-grout for courtyard walls.} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. Deck nailing.} ; {Activity date: 01/25/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. 1st lift of site wall between buildings 2 and 3.

EAP

Duo 520-891-1158}
05/02/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/29/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor

} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. First hard lid}
05/02/2022 COT - LCEL - Electrical Progress Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 02/25/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -PA.

Field

10-12

Texted ETA at 8:16} ; {Activity date: 01/19/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - DE. Walls only. 1-Land all wire assemblies. 2-Bond water piping.

Field

12-2

Texted ETA at 10:00
} ; {Activity date: 10/11/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Not ready}
05/02/2022 COT - LCBU - Framing Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 03/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 12/06/2021; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by VVERA1 - NR. Will schedule with intermediates.

} ; {Activity date: 11/09/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Floor deck screws} ; {Activity date: 10/26/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. Hold down bolts.}
05/02/2022 COT - LCME - Mechanical Progress Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/29/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor

}
05/02/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/29/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor

} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. First hard lid}
05/02/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/29/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor

}
05/10/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 05/10/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 04/07/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for building 2 2nd floor is complete excluding soffits and hard lid

} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Level Two ceiling and separation walls.} ; {Activity date: 03/23/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Walls.} ; {Activity date: 03/16/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -PA. Level one ceiling.
}
08/30/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/30/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - CODE ECO}
12/08/2022 COT - LCEL - Electrical Final Passed
12/08/2022 COT - LCME - Mechanical Above Ceiling Passed
12/08/2022 COT - LCPL - Plumbing Intermediate Passed
01/05/2023 COT - FCON - Alarm - Final Passed
01/06/2023 COT - LCPL - Plumbing Final Passed
01/06/2023 COT - LCME - Mechanical Final Passed
01/06/2023 COT - LCPL - Gas Pressure Test Passed
01/10/2023 COT - LCEL - Outdoor Lighting Passed
01/11/2023 COT - FCON - Fire - Final Passed OK to obtain TCO.
09/18/2023 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ROOF TRUSS REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
ARC SOBER LIVING CAMPUS (BLDG B)-2023-09-22_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
ROOF TRUSS REV1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
T21CM01251 TCO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
21-019 TEST - BALANCE REPORT A,B,C - D_V1.PDF DOCUMENTS VIEW
21-019 WATER CHLORINATION REPORT ABC-D_V1.PDF DOCUMENTS VIEW
ROOF TRUSS REV1.PDF DOCUMENTS VIEW
COM CHECK BUILDINGS B & D.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
HEATING & COOLING LOAD CALCULATIONS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW