Permit Details

Status:
Issued
Type:
Commercial Building
Address:
260 S CHURCH AV
Apply Date:
02/10/2021
Applicant:
Description:
FOUNDATION ONLY FOR A 519 SPACE, 5 LEVEL PARKING GARAGE FOR THE RIO NUEVO / TUCSON CONVENTION CENTER

Permit Reviews

Permit Number - T21CM01203
Permit Status: Issued
Permit Description: FOUNDATION ONLY FOR A 519 SPACE, 5 LEVEL PARKING GARAGE FOR THE RIO NUEVO / TUCSON CONVENTION CENTER
Start Date Submittal Complete Date Status  
02/10/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 03/22/2021 COMPLETED Review Details
04/21/2021 RESUBMITTAL 05/04/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM01203
Permit Status: Issued
Permit Description: FOUNDATION ONLY FOR A 519 SPACE, 5 LEVEL PARKING GARAGE FOR THE RIO NUEVO / TUCSON CONVENTION CENTER
Total Outstanding Activity Conditions - 10
Date Name
03/05/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
03/05/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
03/05/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/05/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/05/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/05/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/05/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/07/2021 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
03/07/2021 SPECIAL INSPECTION IS REQUIRED FOR RAMMED AGGREGATE PIERS AT SPREAD FOOTINGS.
03/07/2021 SHOP DRAWINGS AND CALCULATIONS REQUIRED FOR THE RAMMED AGGREGATE PIERS AT THE SPREAD FOOTINGS PER THE IBC SECTION 107.3.4.1.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM01203
Permit Description: FOUNDATION ONLY FOR A 519 SPACE, 5 LEVEL PARKING GARAGE FOR THE RIO NUEVO / TUCSON CONVENTION CENTER
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/04/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 02/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/03/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Column at GL: A/3 CC1. Ok to place concrete in progress area.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Move an epoxy column E6} ; {Activity date: 09/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. H/7 CC1; G/7 CC1; F/7 CC1; E/7 CC1; F/6 CC1; G/6 CC1; H/5.5 CC1; G/5 CC3; F/5.5 CC1; E/5 CC2; E/4 CC1; E/3 CC1; E/2 CC2; D/2 CC1; C/2. CC2; C/1 CC3; F/2 CC2; G/2 CC1; G/3 CC1; G/4 CC1} ; {Activity date: 09/01/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - 01005. Partial. Concrete columns at GL: C/4 CC1; C/5 CC2; C/5.4 CC3; C/6 CC1; B/5.5 CC1; B/6 CC1; B/2 CC3; A/1 CC3. Ok to place concrete in progress areas.} ; {Activity date: 08/31/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Column footings at GL: B5 F5 CC2; B4 F5 CC1. Pier cap #1 at GL: A/3.5 - 5.6. Ok to place concrete in progress areas.
} ; {Activity date: 08/30/2021; Status: Not ready for Inspection; Inspector: ESTEVENES; Comment: Entered by VVERA1 - Not ready.} ; {Activity date: 08/26/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Column footings at GL: F-6 footings 2/D; 2/E; 2F; F-5 footing 2/G. F-5 footings at GL: 6/E; 6F; 6G; 7/E; 7/F. Shear wall #1 on GL: 8/H-J.

Ok to place concrete in progress areas.} ; {Activity date: 08/25/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Column footings on GL: B/5 F5 CC2; E/4 F7 CC1; F/4 F7 CC1; F/5 F5 CC2/; G/5 F5 CC2; G/4 F7 CC1; H/7 F5 CC1; G/7 F5 CC1. Columns on GL: 8/D; 8/E; 8/F; 8/G; J/7; 5.6/E; 5.6/D; D/6; D/7. Ok to place concrete in progress areas.} ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Concrete column footings at GL: D/1 F2 CC3; D/5 F5 CC2; C/5. F5 CC2; C/4 F7 CC1; B/4 F8 CC1; A/3 F3 CC3; A/2. F2 CC3; B/2 F4 CC3; C/2 F4 CC3. Footings on GL: 2/A-C (F10-F11); A/2-3.5 (F11); 1/C-D.5. (F11). Ok to place concrete in progress areas.} ; {Activity date: 08/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Concrete columns at GL: E/5.5; F/5.5; G/5.5; H/5.5.} ; {Activity date: 07/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Grade beams in loading dock area. Ok to place concrete in progress areas.} ; {Activity date: 08/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Footings at GL: 1/H-J; Shear wall #2 at GL: 1/E-F; Column footing at GL: A/8 CC1, F4 and F10. Ok to place concrete in progress areas.} ; {Activity date: 08/23/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/20/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/20/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/20/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Column footings at GL: B/5.5 (F-3) at 28”; C/6 (F-6) at 38”; C/7 (F-7) at 38”. Ok to place concrete in progress areas.

} ; {Activity date: 08/17/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled, rained out.

} ; {Activity date: 08/16/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - pa
SW #5 - GL J - 5 to 6

} ; {Activity date: 08/13/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/13/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/13/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/12/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - 01005. Not ready. Site too wet to excavate footings. Will reschedule for 16 August.} ; {Activity date: 08/11/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Contractor cancelled due to wet site.} ; {Activity date: 08/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Columns G-5.4, G-5.6. F-5.4, F-5.6, E-5.4, E-5.6. G-1, H-1.} ; {Activity date: 08/09/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/09/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/09/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Sheer wall SW5. Exterior footings and foundations from gridlines F1 to E1. Columns on Gridline H, line 5, 5.5, 6.} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Columns on GL: H/2 CC2; H/3 CC1; H/4. CC1; H/5. CC2; H/6 CC1; H/7 CC1; J/4 CC2; J/5 CC2; J/6 CC2. Footing on GL: 1/G-J. Ok to place concrete in progress areas.} ; {Activity date: 08/05/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Gridlines J3 to J4.
Gridlines 3.5 G to J
Gridlines 5.5. E to H.

} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 08/04/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready; Foreman cancelled. Will reschedule for 5 August.} ; {Activity date: 08/03/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Column footings on GL: H/4 (CC1-F7); H/5 (CC2-F5); Shear wall 35 footing at GL:J/5-6. Ok to p;ace concrete in progress areas.} ; {Activity date: 08/02/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Column footings at GL: 1/G (CC2/F5); 3/G (CC1/F7); 4/G (CC1/F7); 5/G (CC2/F5); 4/H (CC1/F7). Ok to place concrete in progress areas.} ; {Activity date: 07/30/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Column footings at GL: J/.5-2.75 (CC-2 columns); footing at GL: 1/H.75. Ok to place concrete in progress areas.

} ; {Activity date: 07/30/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/30/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/30/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. F-4 footing at GL: J/1. Ok to place concrete in progress areas.} ; {Activity date: 07/28/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Southwest corner of site, columns at GL: J/1-2.5; CC1 and CC2 Columns. 3” of co
02/04/2022 COT - LCBU - Building Progress Passed {Activity date: 02/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 06/01/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Steel beams and columns placement (special inspection )

T20CM08455 NOTE FROM RICK: JB COMMUNICATED DETAILS FROM PERMITS T21CM01203.}
02/04/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 02/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/02/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Not ready. Contractor cancelled} ; {Activity date: 08/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Elevator pit at 0'-5'4" at GL: J/3; stem walls at GL: H.75/3.25: J/3.25-3.5; 3.5/G-J. OK to place concrete in progress areas.}
05/16/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 05/16/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - }
05/16/2022 COT - LCEL - Electrical Underground Passed {Activity date: 05/16/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - } ; {Activity date: 08/31/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Electric conduits for SES at North portion of structure: 12 each at 3/4”; 10 each at 1”; 2 each at 1 1/2”; 4 each at 2 1/2”. Ok to cover progress areas.} ; {Activity date: 08/30/2021; Status: Partial Approval; Inspector: ESTEVENES; Comment: Entered by VVERA1 - Partial. From Electrical/utility room 106. To elevator room. Partial on fire and telephone to column 6B} ; {Activity date: 06/11/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Electric conduits 10 at 3/4”; 4 at 1”; 2 at 1 1/2”; 1 at 3” on GL: D at approximately 50 linear feet. Ok to cover progress area.}
05/16/2022 COT - LCBU - Preslab Passed {Activity date: 05/16/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - } ; {Activity date: 02/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/20/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Rebar in place at column corners at GL: A-D/1-8. Ok to place concrete in progress areas.} ; {Activity date: 09/17/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - . Partial. Section #1 on GL: A-B/1-8; B-D/1-8; 6” continuous slab. Ok to place concrete in progress areas.}
08/05/2022 COT - LCBU - Building Final Passed {Activity date: 08/05/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 08/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 08/03/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Need all permits finals in order to close out this project.

} ; {Activity date: 08/02/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 08/01/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/16/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 05/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved as per Armando. Ok to make application for Temporary Certificate of Occupancy.

} ; {Activity date: 05/16/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - }

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEI REVIEW.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
SUPPLEMENTAL STRUC CALCS.PDF DOCUMENTS VIEW