Permit Number - T21CM01085
Permit Status: Issued
Permit Description: RESTAURANT
Start Date Submittal Complete Date Status  
02/05/2021 COMMERCIAL - NEW 03/24/2021 COMPLETED Review Details
02/08/2022 RESUBMITTAL 02/15/2022 COMPLETED Review Details
04/22/2022 REVISION - - 1ST 05/02/2022 COMPLETED Review Details
05/11/2022 REVISION - - 1ST 05/18/2022 COMPLETED Review Details
07/26/2021 RESUBMITTAL 09/08/2021 COMPLETED Review Details
12/29/2021 RESUBMITTAL 02/02/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM01085
Permit Status: Issued
Permit Description: RESTAURANT
Total Outstanding Activity Conditions - 2
Date Name
02/24/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
02/24/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - T21CM01085
Permit Status: Issued
Permit Description: RESTAURANT
Date Description Comments
02/24/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
02/24/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM01085
Permite Description: RESTAURANT
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/07/2022 ENGR Engineering Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Issued
Permit Number: T21CM01085
Permit Description: RESTAURANT
Total Completed Inspections - 31
Date Description Inspector Results Comments
04/14/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 04/14/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
04/20/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 04/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
Ok to pour footing and stem with slab.
} ; {Activity date: 04/18/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Inspection should have been 03057} ; {Activity date: 04/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Footings approved by JBurge.}
04/20/2022 COT - LCBU - Preslab Passed {Activity date: 04/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 04/14/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by NGARCIA3 - nr
Need AB and rebar
}
05/03/2022 COT - LCPL - Yard Water Line Passed {Activity date: 05/03/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
1 1/2" pvc ok to backfill meter to bldg.}
05/16/2022 COT - LCBU - Roof Nailing Passed {Activity date: 05/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
05/19/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 05/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover exterior walls.
} ; {Activity date: 05/16/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Not ready.}
05/19/2022 COT - LCPL - Backwater Valve Passed {Activity date: 05/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/03/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by NGARCIA3 - nr}
06/28/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 06/28/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
06/28/2022 COT - LCBU - Framing Passed {Activity date: 06/28/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
06/28/2022 COT - LCEL - Electrical Underground Passed {Activity date: 06/28/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Pa
All under slab conduits in place.
}
07/07/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 07/07/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
08/04/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 08/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover ceiling when dining room lights are installed.} ; {Activity date: 08/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Contractor cancelled.}
08/04/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 08/04/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Contractor cancelled.}
08/16/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/16/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - CODE ECO} ; {Activity date: 08/16/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - CODE TMPP}
08/16/2022 COT - LCEL - Construction Power Passed {Activity date: 08/16/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Clearance for TEP ECO}
08/16/2022 COT - LCEL - Temporary Service Passed {Activity date: 08/16/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved. Clearance for TEP ECO}
08/22/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/08/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - TMPP} ; {Activity date: 06/28/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - }
08/22/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 08/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/04/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. All areas except for dining area.} ; {Activity date: 08/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Contractor cancelled.}
08/22/2022 COT - LCPL - Sewer Passed {Activity date: 08/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/18/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. 4” Sewer line from main HCS line to Northwest corner of building. Approximately 65 feet; Ok to cover progress areas.

} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
Grease trap and connections ok to backfill to down stream cleanouts.

}
08/23/2022 COT - LCPL - Rough Soil Passed {Activity date: 08/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved; Inspections 03005, 03035, 03057 performed on 22 August.} ; {Activity date: 08/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/07/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
All interior pvc drains ok to backfill.
Next is grease traps to sidewalk cleanout, where it has been sleeved to the hcs.}
09/07/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/07/2022 COT - LCEL - Electrical Final Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/07/2022 COT - HCBU - Exterior Clips/Sheathing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/07/2022 COT - LCBU - Sustainability Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/07/2022 COT - LCBU - Building Progress Passed {Activity date: 09/07/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/08/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 05/12/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready

} ; {Activity date: 05/11/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval first lift for garbage enclosure

}
09/08/2022 COT - LCME - Mechanical Final Passed {Activity date: 09/08/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Air balance test results forwarded to Robert Sherry.
} ; {Activity date: 01/05/2022; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - AIR BALANCE REPORT REQUIRED}
09/08/2022 COT - LCME - Kitchen Hood Passed {Activity date: 09/08/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Annul fire suppression system tested and approved.} ; {Activity date: 09/07/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by VVERA1 - Not ready. Need Fire,Hood Final.

} ; {Activity date: 07/29/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. New access door added to duct system. Ok to insulate.

} ; {Activity date: 07/19/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for 1st and 2nd wrap, please add access plate in horizontal duct along south wall in center of duct length} ; {Activity date: 07/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval 1 leak in duct marked, ok to wrap exhaust duct, partial approval for 2 wraps through truss area to Exhaust fan} ; {Activity date: 07/15/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Jason} ; {Activity date: 07/12/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval smoke test of all hood duct sections ok to proceed}
09/08/2022 COT - ENGR - Site - Assurance Release Passed {Activity date: 09/08/2022; Status: Approved; Inspector: PURBINA; Comment: Entered by KROBLES1 - }
09/08/2022 COT - FCON - Hood System - Final Passed {Activity date: 09/08/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - }
09/08/2022 COT - LCPL - Plumbing Final Passed {Activity date: 09/08/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Bacteria test results forwarded to Robert Sherry} ; {Activity date: 01/05/2022; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - WATER DISINFECTION REPORT REQUIRED}
10/13/2022 COT - FCON - Fire - Final Passed {Activity date: 10/13/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 09/09/2022; Status: Partial Approval; Inspector: CGates; Comment: Entered by CGATES1 - Need gas detection system installed, currently using small CO2 tank (50lbs) for soda dispensing. OK to obtain TCO.} ; {Activity date: 09/08/2022; Status: Prior to Final Inspectn; Inspector: CGates; Comment: Entered by CGATES1 - Make sure a gas detection system is installed and operational permit for CO2.}

Scheduled Inspections

Scheduled Inspections - T21CM01085
Status: Issued
Description: RESTAURANT
Scheduled Date Description Entered By Entered Date
09/14/2022 ENGR Engineering Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISED LOADCASE REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO T21CM01085 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TRUSS SUBMITTAL REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REVISED LOADCASE REV1.PDF DOCUMENTS VIEW
TCO T21CM01085.PDF DOCUMENTS VIEW
TRUSS SUBMITTAL REV1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENVELOPE COMP REPORT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
IECC COMPLIANCE REPORT.PDF DOCUMENTS VIEW
MECH CHECK.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW