Permit Reviews

Permit Number - T21CM00100
Permit Status: Issued
Permit Description: TCO TO OCCUPY ALL FLOORS
Start Date Submittal Complete Date Status  
04/19/2021 3RD PARTY REVIEW - COMMERCIAL TI 04/26/2021 COMPLETED Review Details
05/03/2021 RESUBMITTAL 05/20/2021 COMPLETED Review Details
07/20/2021 3RD PARTY REVIEW - REVISION/OTHER 10/28/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM00100
Permite Description: TCO TO OCCUPY ALL FLOORS
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
08/16/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Canceled {Activity date: 08/16/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A}
08/16/2022 COT - LCBU - Exterior Clips/Sheathing N/A Canceled {Activity date: 08/16/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A} ; {Activity date: 03/01/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.}
08/16/2022 COT - HCBU - Interior Shear Bracing N/A Canceled {Activity date: 08/16/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A}
08/29/2022 COT - LCBU - Preslab N/A Canceled {Activity date: 08/29/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - N/A.}
11/07/2022 COT - LCBU - Building Above Ceiling N/A Canceled Inspection Canceled
11/07/2022 COT - LCBU - Building Final N/A Canceled Inspection Canceled
11/07/2022 COT - LCME - Mechanical Final N/A Canceled Inspection Canceled
11/07/2022 COT - LCME - Mechanical Above Ceiling N/A Canceled Inspection Canceled
11/07/2022 COT - LCPL - Plumbing Above Ceiling N/A Canceled Inspection Canceled
11/07/2022 COT - LCEL - Electrical Above Ceiling N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Issued
Permit Number: T21CM00100
Permit Description: TCO TO OCCUPY ALL FLOORS
Total Completed Inspections - 25
Date Description Inspector Results Comments
03/02/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 03/02/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Second lift top out}
04/07/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 04/07/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - CODE ECO The meter label is 800 country club rd. CHYD.} ; {Activity date: 03/10/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE INCR}
04/07/2022 COT - LCEL - Construction Power Passed {Activity date: 04/07/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. The TEP clearance code is ECO. The meter label is 800 country club rd. CHYD.} ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - . Partial. From DP1S to transformer to disconnect (400 amp) M2, to CT Can to TEP transformer. From TEP transformer to M3. The TEP clearance code is INCR.
}
08/16/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Third floor. Ok to drywall.
} ; {Activity date: 06/07/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. LEVEL 1. room #101C and 101D. Level 2. Unit 1212.} ; {Activity date: 04/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1210, 1211, 1209, 1208, 1207.
Partial on 1206, DWV ONLY.} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 2. Units 1201, 1202, 1203, 1204. 1205.} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units. 1101, 1102, 1103, 1104, 1105.} ; {Activity date: 03/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Room 000A, 002A, 000B,} ; {Activity date: 03/21/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Unit 1108, 1109, 1110, 1111, 1112, 1113, 1114, 1115, 1116} ; {Activity date: 03/01/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Units 1221, 1220, 1219, 1218. 1217, 1216, 1215, 1214, 1213. DWV and gas piping is not under test.

} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Electrical in plaster walls throughout the building.} ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Basement gym, multi-purpose room and restrooms.}
08/16/2022 COT - LCBU - Framing Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/07/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. LEVEL 1. room #101C and 101D. Level 2. Unit 1212.} ; {Activity date: 04/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1210, 1211, 1209, 1208, 1207.
Partial on 1206, DWV ONLY.} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 2. Units 1201, 1202, 1203, 1204. 1205.} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units. 1101, 1102, 1103, 1104, 1105.} ; {Activity date: 03/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Room 000A, 002A, 000B,} ; {Activity date: 03/21/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Unit 1108, 1109, 1110, 1111, 1112, 1113, 1114, 1115, 1116} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Units 1221, 1220, 1219, 1218. 1217, 1216, 1215, 1214, 1213. DWV and gas piping is not under test.

}
08/16/2022 COT - LCEL - Electrical Underground Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/02/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. North courtyard lighting.} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Light pole at west entrance.} ; {Activity date: 03/30/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. West side, North side, south side Ballard lights.} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. From 400 amp disconnect to TEP transformer, from TEP transformer to new CT cans.} ; {Activity date: 02/03/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. From 400 amp disconnect to 225 kVA transformer to 600 amp disconnect.}
08/16/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/12/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. North court yard CMU wall footing.} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Light pole at west entrance.} ; {Activity date: 03/17/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Two sump pumps, boiler room and rise room.} ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - . Partial. Handicap ramp walls.} ; {Activity date: 01/03/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Room C102. Two pour back strips with #4 and 5 dowels.} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Footing for1
ramp.}
08/16/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/08/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Room 112 trash room, lobby 100, room, room 203 trash, 1206.} ; {Activity date: 07/05/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Corridor 102. Lobby 100, Office 100A, Corridor 103 complete, mechanical in corridor 204, entreated to room 1207.} ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Unit. 1207.} ; {Activity date: 06/27/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Rooms 101, 101A, 2nd floor corridor,} ; {Activity date: 06/17/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Partial. Corridor 101 complete, room 101D, 101E,} ; {Activity date: 06/02/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 1. Units 1106, 1112, 1211, 1209, 1208.} ; {Activity date: 05/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Lounge area 103A. Vestibule #105. Corridor #205 complete. Unit #1210,} ; {Activity date: 05/13/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - . Partial. Level 1and level 2 , center corridor ceiling.} ; {Activity date: 05/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - . Partial. Level 1. South hallway.} ; {Activity date: 05/03/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units 1112 and 1114.} ; {Activity date: 04/27/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Southwest corner corridor.

} ; {Activity date: 04/27/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Units 1105, 1205, 1204, 1203, 1202, 1201.
} ; {Activity date: 04/25/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor, Nate.} ; {Activity date: 04/19/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor, Nate} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Units 1108, 1113, 1115.

} ; {Activity date: 03/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Units 1109, 1110, 1111, 1116.} ; {Activity date: 03/16/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1215, 1214, second floor electric room, 1213, 208, 108.} ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. UNITS 1221, 1220, 1219, 1218, 1217. Basement rooms ADA} ; {Activity date: 03/09/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Cancel my contractor, Nathan} ; {Activity date: 03/08/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor, Nathen} ; {Activity date: 03/07/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Not ready.} ; {Activity date: 01/21/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 2 South and West wing units, common areas and corridors.}
08/16/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/07/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. LEVEL 1. room #101C and 101D. Level 2. Unit 1212.} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. ADA restrooms at 08A, 08B; waste and vent lines. Restrooms at C105 and C106; waste and vents. Ok to cover walls.} ; {Activity date: 05/03/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level three. Restrooms and bar.} ; {Activity date: 04/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1210, 1211, 1209, 1208, 1207.
Partial on 1206, DWV ONLY.} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 2. Units 1201, 1202, 1203, 1204. 1205.} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. DP1S PANEL.} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units. 1101, 1102, 1103, 1104, 1105.} ; {Activity date: 03/30/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Units 1101, 1102, 1105.

} ; {Activity date: 03/21/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 03/18/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Nathen.

} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Unit 1108, 1109, 1110, 1111, 1112, 1113, 1114, 1115, 1116} ; {Activity date: 03/01/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.} ; {Activity date: 01/31/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Chapel building Level #2; units: 1213; 1214; 1215; 1216; waste and vent lines under test.} ; {Activity date: 01/28/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Corrections required, Provide full DWV test for following units on second floor (13,14,15,16). Install nail plates where needed & seal floor to floor penetrations.} ; {Activity date: 01/27/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. DWV. Units 1217, 1218, 1219, 1220, 1221.} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Units 1221, 1220, 1219, 1218. 1217, 1216, 1215, 1214, 1213. DWV and gas piping is not under test.

} ; {Activity date: 11/17/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Basement Level. From main water line into building, 2 1/2 inch copper to future kitchen, to water heaters, to restrooms and mop sink.

} ; {Activity date: 11/16/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. 4 inch grease line for future kitchen. Three restrooms, mop sink, two water fountains.

}
08/16/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/15/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Unit 1205.} ; {Activity date: 06/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Unit 1106, 1107, 1211, 1212, and corridor number 101} ; {Activity date: 06/07/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. LEVEL 1. room #101C and 101D. Level 2. Unit 1212.} ; {Activity date: 04/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1210, 1211, 1209, 1208, 1207.
Partial on 1206, DWV ONLY.} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 2. Units 1201, 1202, 1203, 1204. 1205.} ; {Activity date: 03/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Room 000A, 002A, 000B,} ; {Activity date: 03/21/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready} ; {Activity date: 03/01/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.}
08/16/2022 COT - BULD - SWG Clearance Passed {Activity date: 08/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE} ; {Activity date: 04/20/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE}
08/29/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 08/29/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
08/29/2022 COT - FCON - Underground Flush Passed {Activity date: 08/29/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - Approved per mike ross}
08/29/2022 COT - FCON - Alarm - Final Passed {Activity date: 08/29/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
08/29/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 08/29/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
08/29/2022 COT - LCME - Hydronic Piping Passed {Activity date: 08/29/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/25/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor, Nathen.} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Chiller unit.} ; {Activity date: 08/16/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. All units complete.} ; {Activity date: 03/16/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1215, 1214, second floor electric room, 1213, 208, 108.}
08/29/2022 COT - LCPL - Rough Soil Passed {Activity date: 08/29/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Inspected by project engineers
}
08/29/2022 COT - FCON - Fire - Final Passed {Activity date: 08/29/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } ; {Activity date: 02/23/2022; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - -Gym only - OK to obtain TCO from the building department.}
08/29/2022 FCON – OH Piping & Hydro Passed {Activity date: 08/29/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - Approved per mike ross}
08/29/2022 COT - FCON - Underground Pressure Passed {Activity date: 08/29/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - approved per mike ross}
08/30/2022 ENGR Engineering Final Passed {Activity date: 08/30/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved} ; {Activity date: 02/22/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - PARTIAL, OK FOR TCO FOR OCCUPANCY PENDING ALL OTHER INSPECTIONS

}
09/09/2022 COT - LCEL - Electrical Final Passed {Activity date: 09/09/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. all except for third floor.} ; {Activity date: 08/25/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor, Nathen.} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Unit 1107. Basement complete except for MPR .} ; {Activity date: 08/23/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Basement level. Rooms 003A, 004A, 004C, 004B. 006, Level 2. 1203, 1205.} ; {Activity date: 08/22/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Basement. Vestibule 008, rooms 11A, 11C, 11D, 001, 003A, 004C.
} ; {Activity date: 08/19/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Room 207, 206, 208, 008A&B, 007C, 0001A,} ; {Activity date: 08/18/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 1. Electrical room, south side corridor, west side corridor, main lobby, lobby 100. 100A, room 101, 101A, 101E, 101C, 101D, corridor 3, trash room 112, lounge 103A, corridor 204, room 1204, 1202, trash room 203, level 2 west wing corridor #200, south corridor 205. Electrical room 209.} ; {Activity date: 08/16/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units 1106, 1101,1102,1103, 1104, 1105,} ; {Activity date: 08/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units 1211, 1210, rooms 206, 207, 208, units 1212,, 1209, 1208, 1206,} ; {Activity date: 08/08/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Nathan

} ; {Activity date: 07/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Unit #1210.

} ; {Activity date: 07/28/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units 1219, 1215. 1214, 1213, 1116, 1115, 1114, 1113, 1112, 1111, 1110, 1109, 1108.

} ; {Activity date: 07/25/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Units 1221, 1220, 1218, 1217, 1216,

}
09/09/2022 COT - LCPL - Plumbing Final Passed {Activity date: 09/09/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/29/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. All except for third floor, no hot water to units.} ; {Activity date: 08/25/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor, Nathen.} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Units 1218, 1212, 1211, 1209. 1105, 1103, 1111.

} ; {Activity date: 08/23/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level 1. 1104, 1102, 1101, 1106, 1107, 1108, 1109, 1110, 1112, 1113, 1114, 1115, 1116.} ; {Activity date: 08/22/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Level 2. Units 1221, 1220, 1219, 1217, 1216, 1215, 1214, 1213, 206, 1210, 1208, 1207, 1206, 1201, 1202, 1203, 1204, 1205.}
02/23/2023 COT - HCME - Mechanical Final Passed
02/23/2023 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEOTECH EVALUATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PROJECT MANUAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PROJECT MANUAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 9.25.22 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO_REQUEST_FOR MONASTERY RENOVATION PROJECT 9.9.22 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO_REQUEST_FORM_1-17-14FILLABLE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
GEOTECH EVALUATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
TCO_REQUEST_FORM_1-17-14FILLABLE.PDF DOCUMENTS VIEW
TCO_REQUEST_FOR MONASTERY RENOVATION PROJECT 9.9.22.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW
TCO 9.25.22.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
TCO 2.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REV1_PROJECT MANUAL.PDF DOCUMENTS VIEW
PROJECT MANUAL.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW