Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21BU00179
Permit Details
Apply Date:
03/26/2021
Applicant:
Robinette Architects
Description:
FENCE (NOTE:T20DV07616 METAL FENCE IN WASH)
Architects:
- Robinette Architects
Contractors:
- KCR Development LLC
Permit Reviews
Permit Number - T21BU00179
Permit Status: Final
Permit Description: FENCE (NOTE:T20DV07616 METAL FENCE IN WASH)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/30/2021 | WALLS | 05/10/2021 | COMPLETED |
| 07/30/2021 | RESUBMITTAL | 08/13/2021 | COMPLETED |
| 08/20/2021 | RESUBMITTAL | 09/08/2021 | COMPLETED |
| 09/09/2021 | RESUBMITTAL | 09/29/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21BU00179
Permit Status: Final
Permit Description: FENCE (NOTE:T20DV07616 METAL FENCE IN WASH)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/28/2022 | 1. The owner shall be responsible for the operation, maintenance, and liability of the fence and its ability to convey stormwater drainage through it consistent with local, state and federal stormwater management regulations, law, and requirements. 2. The owner shall have an Arizona Licensed and Registered Civil Engineer prepare a certified inspection report annually which is available for review by City staff upon written request. 3. The City may periodically inspect the site to ensure that the scheduled and unscheduled maintenance activities are being performed adequately. 4. The owners shall indemnify and reimburse the City for any and all costs associated with the opening of the gate and maintenance of the fence openings should the City find the owners deficient in their obligation to complete the requirements stated herein. 5. Failure to abide by these conditions and to maintain the fence line free from vegetation, sediment, and debris as described herein may result in removal of the fence and gates in their entirety. 6. The owner shall be responsible for maintaining an unobstructed positively draining wash flow line through their property. OPERATIONAL REQUIREMENT The gates must remain open during any forecasted rain event. MAINTENANCE REQUIREMENT The fence line and the wash (within the gate section) shall be maintained by removing all sediment and debris. The fence line must be free of vegetation, debris, and no more than 4-inches of sediment buildup. As an alternative to keeping the gates open, the owners may remove the entire lower flap assembly to free flow of water and debris. |
Completed Inspections
Permit Status: Final
Permit Number: T21BU00179
Permit Description: FENCE (NOTE:T20DV07616 METAL FENCE IN WASH)
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2021 | BUILDING - FINAL | ESTEVENS | Approved | Partial. Pending engineering drainage report. |
| 12/14/2021 | FRAMING | ESTEVENS | Approved | Approved. |
| 12/14/2021 | EXCAVATION/LAYOUT REBAR & ZON | ESTEVENS | Approved | Approved. |
| 12/30/2021 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | MET WITH RICK WHO IS WITH KCR DEVELOPMENT LLC, THE CONTRACTOR FOR THIS SITE. WE LOOKED AT THE SITE, THE PLANS, AND I TOOK SOME PICTURES OF THE WORK THAT HAS BEEN COMPLETED AT THIS TIME. IT APPEARS THAT THE WIDTH(18") OF ROCK RIP RAP HAS BEEN INSTALLED PER THE APPROVED PLANS THAT HAVE BEEN PROVIDED, BUT THE DEPTH OF THE MATERIAL CANNOT BE VERIFIED BY ME AT THIS TIME. THE CONTRACTOR HAS ADVISED ME THAT THE WORK WAS INSPECTED DURING THE INSTALLATION BY THE STORMWATER SECTION IN TRANSPORTATION, THIS HAS NOT BEEN VERIFIED. WHEN I CONTACTED THE STORMWATER SECTION IN THE TRANSPORTATION DEPARTMENT THEY ADVISED ME THAT THEY DID NOT SEE THE SITE DURING CONSTRUCTION, THEY WERE THERE BEFORE AND AFTER THE WORK WAS COMPLETED. I HAVE ASKED RICK TO PROVIDE THE INFORMATION TO ME THAT WE LOOKED AT ON 12/30/2021. RICK HAS PROVIDED DOCUMENTATION FROM A REGISTERED PROFESSIONAL ENGINEER (CHRISTOPHER B. ROD) FOR THE CONSTRUCTION CERTIFICATION DATED AND STAMPED ON 12/14/2021, BUT THERE DOES NOT APPEAR TO BE ANY CONSTRUCTION DRAWINGS FOR THE GATE AND THE WASH. THE WORK FOR THIS PERMIT AND OTHER PERMITS HAS NEVER BEEN CALLED IN FOR ENGINEERING OR STORMWATER INSPECTIONS DURING THE TIME OF CONSTRUCTION. I HAVE ASKED MR. CAMPBELL TO PROVIDE ME AND THE ENGINEERING REVIEWERS COPIES OF THE DOCUMENTATION THAT IS REQUIRED FOR THE APPROVAL OF THE PERMITS. |