Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
4739 E GLENN ST
Address NEW:
4739 E GLENN ST
Apply Date:
10/02/2020
Applicant:
SELLERS & SONS
Description:
GLENN STREET 30" RECLAIMED WATER MAIN REHABILITAITON / REPLACEMENT PROJECT PN: 7-218-2018 REHABILITATING AND INSTALLING ROUGHLY 4,601 LF OF NEW WATER MAIN ALONG GLENN ST BETWEEN SWAN RD AND CRAYCROFT RD. 10/22/2020 - PLAN ADD - R1 INSTALLATION OF TEMPORARY WATERLINE ALONG SOUTH SIDE OF GLENN, TRAFFIC PLAN WILL BE USING 500' CHANNEL SET UP PUSHING TRAFFIC TO NORTH SIDE OF GLENN ST. SET UPS IN 500' INCREMENTS FROM SWAN RD TO CRAYCROFT RD. 11/09/2020 - PLAN ADD - R2 THE SIGNS IN PLACE DETOURING TRAFFIC FROM GLENN TO FORT LOWELL RD HAVE BEEN UPDATED TO DETOUR TRAFFIC TO GRANT RD AS REQUESTED BY TDOT AND TUCSON WATER. THE SIGNS ARE LOCATED EAST BOUND ON GLENN BEFORE SWAN INTERSECTION, WEST BOUND ON GLENN BEFORE CRAYCROFT INTERSECTION. NORTH BOUND ON CRAYCROFT AND SWAN BEFORE GRANT INTERSECTION. SOUTH BOUND ON CRAYCROFT AND SWAN BEFORE FORT LOWELL. 11/24/2020 - PLAN ADD - R3 ADD CHANNELS INTO THE CENTER FOR TCP PAGE 18 TO ALLOW ACCESS TO THE HOMES BLOCKED/CLOSED BY TCP 2 FOR THE DATES OF 11/30/2020 - 12/18/2020. ** INSTALLATION OF TEMPORARY WATERLINE ON THE SOUTH SIDE OF GLENN ST. TRAFFIC WILL BE USING A CHANNEL SET UP PUSHING TRAFFIC TO THE NORTH SIDE OF GLENN ST. CHANNEL SET UP FROM ROSEMONT TO SIDNEY BL. ** 01/21/2021 - PLAN ADD AND RENEWAL - R4 WE HAVE ADDED $250 FINE SIGNS TO HELP NOTIFY LOCAL TRAFFIC THAT THEY CAN BE FINED FOR SPEEDING IN THE WORK ZONE, HELPING ENABLE POLICE TO ISSUE TICKETS. 02/26/2021 - PLAN ADD - R5 REVISE TCP PAGE 20 FOR THE CLOSURE TO START EAST OF NEW HOSPITAL RD TO ALLOW PARENTS ACCESS TO DROP OFF THEIR CHILDREN AT SCHOOL BY USING THE SAME ROUTE THEY PREVIOUSLY TOOK. ALSO, INCLUDED A SMALL CHANNEL ON THE NORTH SIDE OF THE ROAD TO ALLOW ACCESS TO THE RESIDENTS DIRECTLY EFFECTED BY THE CLOSURE. 04/21/2021 - RENEWED FOR 60 DAYS - R6 ANTICIPATED SCHEDULE, MAY 6-14 PAVING; AND STRIPING TO TAKE PLACE IN JUNE 2021. 04/29/2021 - PLAN CHANGE - NIGHT WORK PER APPROVED TNE- R7 04/30 10PM - 6AM; 05/02 6AM - 4PM; 5/05 10PM TO 6AM; 05/09 6AM TO 4PM. 05/20/2021 - PLAN ADD/PLAN CHANGE - R8 ADDITION OF MCP FOR SLURRY SEAL COAT FROM 06/06/2021 - 06/08/2021. APPROVED TNE ATTACHED. 08/19/2021 - RENEWED FOR 90 DAYS - R9 SLURRY SEAL, STRIPING AND RAIN DELAYS.

Outstanding Inspections

Permit Status: Final
Permit Number: T20RW05395
Permite Description: GLENN STREET 30" RECLAIMED WATER MAIN REHABILITAITON / REPLACEMENT PROJECT PN: 7-218-2018 REHABILITATING AND INSTALLING ROUGHLY 4,601 LF OF NEW WATER MAIN ALONG GLENN ST BETWEEN SWAN RD AND CRAYCROFT RD. 10/22/2020 - PLAN ADD - R1 INSTALLATION OF TEMPORARY WATERLINE ALONG SOUTH SIDE OF GLENN, TRAFFIC PLAN WILL BE USING 500' CHANNEL SET UP PUSHING TRAFFIC TO NORTH SIDE OF GLENN ST. SET UPS IN 500' INCREMENTS FROM SWAN RD TO CRAYCROFT RD. 11/09/2020 - PLAN ADD - R2 THE SIGNS IN PLACE DETOURING TRAFFIC FROM GLENN TO FORT LOWELL RD HAVE BEEN UPDATED TO DETOUR TRAFFIC TO GRANT RD AS REQUESTED BY TDOT AND TUCSON WATER. THE SIGNS ARE LOCATED EAST BOUND ON GLENN BEFORE SWAN INTERSECTION, WEST BOUND ON GLENN BEFORE CRAYCROFT INTERSECTION. NORTH BOUND ON CRAYCROFT AND SWAN BEFORE GRANT INTERSECTION. SOUTH BOUND ON CRAYCROFT AND SWAN BEFORE FORT LOWELL. 11/24/2020 - PLAN ADD - R3 ADD CHANNELS INTO THE CENTER FOR TCP PAGE 18 TO ALLOW ACCESS TO THE HOMES BLOCKED/CLOSED BY TCP 2 FOR THE DATES OF 11/30/2020 - 12/18/2020. ** INSTALLATION OF TEMPORARY WATERLINE ON THE SOUTH SIDE OF GLENN ST. TRAFFIC WILL BE USING A CHANNEL SET UP PUSHING TRAFFIC TO THE NORTH SIDE OF GLENN ST. CHANNEL SET UP FROM ROSEMONT TO SIDNEY BL. ** 01/21/2021 - PLAN ADD AND RENEWAL - R4 WE HAVE ADDED $250 FINE SIGNS TO HELP NOTIFY LOCAL TRAFFIC THAT THEY CAN BE FINED FOR SPEEDING IN THE WORK ZONE, HELPING ENABLE POLICE TO ISSUE TICKETS. 02/26/2021 - PLAN ADD - R5 REVISE TCP PAGE 20 FOR THE CLOSURE TO START EAST OF NEW HOSPITAL RD TO ALLOW PARENTS ACCESS TO DROP OFF THEIR CHILDREN AT SCHOOL BY USING THE SAME ROUTE THEY PREVIOUSLY TOOK. ALSO, INCLUDED A SMALL CHANNEL ON THE NORTH SIDE OF THE ROAD TO ALLOW ACCESS TO THE RESIDENTS DIRECTLY EFFECTED BY THE CLOSURE. 04/21/2021 - RENEWED FOR 60 DAYS - R6 ANTICIPATED SCHEDULE, MAY 6-14 PAVING; AND STRIPING TO TAKE PLACE IN JUNE 2021. 04/29/2021 - PLAN CHANGE - NIGHT WORK PER APPROVED TNE- R7 04/30 10PM - 6AM; 05/02 6AM - 4PM; 5/05 10PM TO 6AM; 05/09 6AM TO 4PM. 05/20/2021 - PLAN ADD/PLAN CHANGE - R8 ADDITION OF MCP FOR SLURRY SEAL COAT FROM 06/06/2021 - 06/08/2021. APPROVED TNE ATTACHED. 08/19/2021 - RENEWED FOR 90 DAYS - R9 SLURRY SEAL, STRIPING AND RAIN DELAYS.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/14/2020 TDOT-Barricade Complaint Call N/A Continued Response to citizen concern about high volume detour through adjacent neighborhood. Contractor had begun assembly of hi-line water main. TC was not set per plan. Contractor added a single lane for emergency use only. This was demonstrated as unsafe for overnight use because cars were not obeying during work hours. Also, I was unable to negotiate the right turn off of Swan without hitting the signs and barricades. In addition, no resident notification was given about the road closure on Glenn I spoke with Brad Scott with Sellers and Son's and he agreed that the closure could come down until a better plan was come up with. Contractor told me they had other work they could do in the meantime.

Documents

File Name Document Type  
T20RW05395 R1.PDF ROW-RIGHT OF WAY VIEW
T20RW05395.PDF ROW-RIGHT OF WAY VIEW