Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
6201 S PARK AV
Address NEW:
6201 S PARK AV
Apply Date:
06/15/2020
Applicant:
CROWN CASTLE
Description:
CONTINUATION OF WORK ON PERMIT T20RW06114 - 11/12/20 BE BORE 1259' AND TRENCH 44' TO PLACE 3-1.25" INNERDUCT AND 1-4" CONDUIT. PLACE 4 DOWN GUYS AND ANCHORS FOR TUC48_013. REQUIRED 1. PROVIDE MCP 2. FOLLOW SPECIAL NOTES BELOW SPECIAL NOTES MOBILITY CONTROL PLAN (FORMERLY KNOWN AS TCP)- MAINTAIN PEDESTRIAN AND BUS ACCESS AT ALL TIMES. MOBILITY CONTROL PLAN SHALL INCLUDE ALL ADVANCE SIGNING AND BARRICADING TO PROVIDE THIS. ON ARTERIALS AND COLLECTOR STREETS, NO DETOURING OF PEDESTRIANS IN ADVANCE OF CONSTRUCTION ZONE WILL BE PRACTICED. PROVIDE PEDESTRIAN ACCESS BY WAY OF USING A TEMPORARY PATH EITHER IN THE TRAVEL LANE OR WITHIN THE PARKWAY TO ALLOW PEDESTRIANS THE ABILITY TO GET TO A BUS STOP OR BUSINESS. WORK HOURS- NON PEAK HOURS WHERE LANE CLOSURES/RESTRICTIONS ARE PROPOSED. OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED IF NEEDED FOR MORE THAN TWO DAYS, DOWNTOWN, OR IN A HIGH PEDESTRIAN AREA. AERIAL WORK- ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. EQUIPMENT POSITIONING AND LOCATION- INDICATE EQUIPMENT LOCATION FOR MCP ASSESSMENT. RESTORATION JACK AND BORE- DESCRIPTION OF WORK DOES NOT INCLUDE PATCHING OF POTHOLES REQUIRED AT EACH UTILITY CROSSING. ADD THIS TO THE DESCRIPTION OF WORK. BACKFILL- BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE (AB). ASPHALT MIX- ASPHALT CONCRETE SHALL BE CITY OF TUCSON MIX NO3 OR COT MIX NO2 WITH TR-22 PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. PATCHES ON STREETS IDENTIFIED AS IN NO CUT MORATORIUM SHALL HAVE A GREATER PATCH DIMENSION EXTENDING TO THE NEAREST LANE LINE AND 50-FT ON EACH SIDE OF THE TRENCH EXCAVATION LIMITS. STRIPING- REPLACE/REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. LANDSCAPE- REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. CONCRETE- ALL CONCRETE DAMAGED OR REMOVED SHALL BE REPLACED AS A WHOLE TO THE NEAREST JOINT. STORMWATER - GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 10/12/2020 - CHANGE TO SCOPE OF WORK - R3 REVISION - BORE 2508' INSTEAD OF 1259' AND TRENCH 47' INSTEAD OF 44' TO PLACE 3-1.25" INNERDUCT AND 1-4" CONDUIT. PLACE 7-30x48 VAULTS. PLACE AERIAL CABLE AND STRAND 2368' AND PLACE 4 DOWN GUYS AND ANCHORS.
Contractors:
  • QUANTA TELECOMMUNICATION SERVICES. LLC
  • R DIRECTIONAL DRILLING AND UNDERGROUND TECHNOLOG