Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel140241420
JurisdictionTucson, Pima County
City of Tucson ZoningMH-1
Tucson WardWard 5
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 6201 S PARK AV
Date - 10/20/2026 1:47 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Permits

Address: 6201 S PARK AV
Date - 10/20/2026 1:47 a.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
T01ME00508 EXPIRED 06/14/2001 12/11/2001 MECH INSTALL: A/C UNIT ON MH (APA)
T01MH00248 WITHDRWN 04/23/2001 N/A MH MOBILE HOME:SETUP
T01MH00342 FINAL 06/06/2001 12/15/2001 MH MANUFACTURED HOME:SETUP
T18CM03436 WITHDRWN 05/04/2018 10/31/2018 COMBO ELECTRICAL RECONNECT
T20RW03378 FINAL 06/15/2020 11/17/2020 ROW CONTINUATION OF WORK ON PERMIT T20RW06114 - 11/12/20 BE BORE 1259' AND TRENCH 44' TO PLACE 3-1.25" INNERDUCT AND 1-4" CONDUIT. PLACE 4 DOWN GUYS AND ANCHORS FOR TUC48_013. REQUIRED 1. PROVIDE MCP 2. FOLLOW SPECIAL NOTES BELOW SPECIAL NOTES MOBILITY CONTROL PLAN (FORMERLY KNOWN AS TCP)- MAINTAIN PEDESTRIAN AND BUS ACCESS AT ALL TIMES. MOBILITY CONTROL PLAN SHALL INCLUDE ALL ADVANCE SIGNING AND BARRICADING TO PROVIDE THIS. ON ARTERIALS AND COLLECTOR STREETS, NO DETOURING OF PEDESTRIANS IN ADVANCE OF CONSTRUCTION ZONE WILL BE PRACTICED. PROVIDE PEDESTRIAN ACCESS BY WAY OF USING A TEMPORARY PATH EITHER IN THE TRAVEL LANE OR WITHIN THE PARKWAY TO ALLOW PEDESTRIANS THE ABILITY TO GET TO A BUS STOP OR BUSINESS. WORK HOURS- NON PEAK HOURS WHERE LANE CLOSURES/RESTRICTIONS ARE PROPOSED. OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED IF NEEDED FOR MORE THAN TWO DAYS, DOWNTOWN, OR IN A HIGH PEDESTRIAN AREA. AERIAL WORK- ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. EQUIPMENT POSITIONING AND LOCATION- INDICATE EQUIPMENT LOCATION FOR MCP ASSESSMENT. RESTORATION JACK AND BORE- DESCRIPTION OF WORK DOES NOT INCLUDE PATCHING OF POTHOLES REQUIRED AT EACH UTILITY CROSSING. ADD THIS TO THE DESCRIPTION OF WORK. BACKFILL- BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE (AB). ASPHALT MIX- ASPHALT CONCRETE SHALL BE CITY OF TUCSON MIX NO3 OR COT MIX NO2 WITH TR-22 PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. PATCHES ON STREETS IDENTIFIED AS IN NO CUT MORATORIUM SHALL HAVE A GREATER PATCH DIMENSION EXTENDING TO THE NEAREST LANE LINE AND 50-FT ON EACH SIDE OF THE TRENCH EXCAVATION LIMITS. STRIPING- REPLACE/REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. LANDSCAPE- REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. CONCRETE- ALL CONCRETE DAMAGED OR REMOVED SHALL BE REPLACED AS A WHOLE TO THE NEAREST JOINT. STORMWATER - GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 10/12/2020 - CHANGE TO SCOPE OF WORK - R3 REVISION - BORE 2508' INSTEAD OF 1259' AND TRENCH 47' INSTEAD OF 44' TO PLACE 3-1.25" INNERDUCT AND 1-4" CONDUIT. PLACE 7-30x48 VAULTS. PLACE AERIAL CABLE AND STRAND 2368' AND PLACE 4 DOWN GUYS AND ANCHORS.
T20RW03671 FINAL 06/29/2020 12/30/2020 ROW BORE 414' TO PLACE 3-1.25" INNERDUCT AND TRENCH 5' OF 1-4" CONDUIT. PLACE 3-30X48 VAULTS. PLACE 4 DOWN GUYS AND ANCHORS AND PLACE AERIAL CABLE AND STRAND FOR 2796' FOR TUC48_014. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
T20RW06114 FINAL 11/10/2020 03/12/2021 ROW CONTINUATION OF WORK FROM PERMIT T20RW03378, PREVIOUSLY RENEWED/REVISED 3 TIMES SO NEW PERMIT NEEDED TO BE ISSUED TUC48_013 - BORE 2508' AND TRENCH 47' TO PLACE 3-1.25" INNERDUCT AND 1-4" CONDUIT. PLACE 7-30X48 VAULTS. PLACE AERIAL CABLE AND STRAND 2368' AND PLACE 3 DOWN GUYS AND ANCHORS. SPECIAL NOTES: MOBILITY CONTROL PLAN (FORMERLY KNOWN AS TCP)- MAINTAIN PEDESTRIAN AND BUS ACCESS AT ALL TIMES. MOBILITY CONTROL PLAN SHALL INCLUDE ALL ADVANCE SIGNING AND BARRICADING TO PROVIDE THIS. ON ARTERIALS AND COLLECTOR STREETS, NO DETOURING OF PEDESTRIANS IN ADVANCE OF CONSTRUCTION ZONE WILL BE PRACTICED. PROVIDE PEDESTRIAN ACCESS BY WAY OF USING A TEMPORARY PATH EITHER IN THE TRAVEL LANE OR WITHIN THE PARKWAY TO ALLOW PEDESTRIANS THE ABILITY TO GET TO A BUS STOP OR BUSINESS. WORK HOURS- NON PEAK HOURS WHERE LANE CLOSURES/RESTRICTIONS ARE PROPOSED. OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED IF NEEDED FOR MORE THAN TWO DAYS, DOWNTOWN, OR IN A HIGH PEDESTRIAN AREA. AERIAL WORK- ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. EQUIPMENT POSITIONING AND LOCATION- INDICATE EQUIPMENT LOCATION FOR MCP ASSESSMENT. RESTORATION JACK AND BORE- DESCRIPTION OF WORK DOES NOT INCLUDE PATCHING OF POTHOLES REQUIRED AT EACH UTILITY CROSSING. ADD THIS TO THE DESCRIPTION OF WORK. BACKFILL- BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE (AB). ASPHALT MIX- ASPHALT CONCRETE SHALL BE CITY OF TUCSON MIX NO3 OR COT MIX NO2 WITH TR-22 PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. PATCHES ON STREETS IDENTIFIED AS IN NO CUT MORATORIUM SHALL HAVE A GREATER PATCH DIMENSION EXTENDING TO THE NEAREST LANE LINE AND 50-FT ON EACH SIDE OF THE TRENCH EXCAVATION LIMITS. STRIPING- REPLACE/REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. LANDSCAPE- REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. CONCRETE- ALL CONCRETE DAMAGED OR REMOVED SHALL BE REPLACED AS A WHOLE TO THE NEAREST JOINT. STORMWATER - GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION.