Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
20 S STONE AV
Address NEW:
20 S STONE AV
Apply Date:
04/20/2020
Applicant:
U E B BUILDERS INC *** APA ***
Description:
RENDEZVOUS - DP16-0200 INSTALLATION OF SIDEWALK AND GUTTER PER APPROVED DEVELOPMENT PLAN DP16-0200. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. ** DUE TO THE PROXIMITY OF THE SUN LINK TRACKS, THE PROPOSED PLANITING OF DATE PALMS ALONG CONGRESS STREET WILL NOT BE PERMITTED. AN ALTERNATIVE SPECIES WILL HAVE TO BE CONSIDERED FOR THIS LOCATION. ** A TNE WILL BE REQUIRED FOR ANY NIGHT TIME WORK.
Contractors:
  • KATERRA CONSTRUCTION LLC

Completed Inspections

Permit Status: Final
Permit Number: T20RW02269
Permit Description: RENDEZVOUS - DP16-0200 INSTALLATION OF SIDEWALK AND GUTTER PER APPROVED DEVELOPMENT PLAN DP16-0200. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. ** DUE TO THE PROXIMITY OF THE SUN LINK TRACKS, THE PROPOSED PLANITING OF DATE PALMS ALONG CONGRESS STREET WILL NOT BE PERMITTED. AN ALTERNATIVE SPECIES WILL HAVE TO BE CONSIDERED FOR THIS LOCATION. ** A TNE WILL BE REQUIRED FOR ANY NIGHT TIME WORK.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/11/2020 TDOT-EXCAV GENERAL INSPECTION DR Approved Work complete. Final. No issues.

Documents

File Name Document Type  
T20RW02269.PDF ROW-RIGHT OF WAY VIEW