Permit: T20RW01550
Permit Details
Apply Date:
03/10/2020
Applicant:
SOUTHWEST GAS
Description:
CONDITIONAL ISSUANCE: ISSUING PERMIT WITH CONDITION THAT TNE WILL BE OBTAINED BY CITY MANAGER'S OFFICE PRIOR TO THE START OF WORK. (2) 5X5 BELLHOLES IN DIRT/BLKTOP/CONCRETE AND APPROX 65 FT TRENCH ACROSS STONE AV- TO REPAIR/REPLACE GAS LINE. FULL CLOSURE OF STONE AVE FROM 9:00 PM - 6:00 AM STARTING 4/20/20, MESSAGE BOARDS SET-UP 48-HRS IN ADVANCE TO STARTING WORK. OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED/TO GRADE WHEN NOT ON SITE WORKING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. NOTIFY IN WRITING AT LEAST 5 WORKING DAYS BEFORE WORK BEGINS, ANY BUSINESSES, ESIDENCES AND PUBLIC TRANSIT ROUTES AFFECTED BY YOUR TEMPORARY TRAFFIC CONTROL. NOTIFY SUN LINK (520) 792-9222 PRIOR TO WORK.
Contractors:
- MEARS GROUP INC
Completed Inspections
Permit Status: Final
Permit Number: T20RW01550
Permit Description: CONDITIONAL ISSUANCE: ISSUING PERMIT WITH CONDITION THAT TNE WILL BE OBTAINED BY CITY MANAGER'S OFFICE PRIOR TO THE START OF WORK.
(2) 5X5 BELLHOLES IN DIRT/BLKTOP/CONCRETE AND APPROX 65 FT TRENCH ACROSS STONE AV- TO REPAIR/REPLACE GAS LINE.
FULL CLOSURE OF STONE AVE FROM 9:00 PM - 6:00 AM STARTING 4/20/20,
MESSAGE BOARDS SET-UP 48-HRS IN ADVANCE TO STARTING WORK.
OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED/TO GRADE WHEN NOT ON SITE WORKING.
OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION.
NOTIFY IN WRITING AT LEAST 5 WORKING DAYS BEFORE WORK BEGINS, ANY BUSINESSES, ESIDENCES AND PUBLIC TRANSIT ROUTES AFFECTED BY YOUR TEMPORARY TRAFFIC CONTROL.
NOTIFY SUN LINK (520) 792-9222 PRIOR TO WORK.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2020 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | SWG work complete in roadway. Perm patch complete. No Issues. |