Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T20RW00850
Permit Details
Apply Date:
02/10/2020
Applicant:
MW MORRISEY CONTRACTING
Description:
DP19-0208 - DUTCH BROTHERS SPEEDWAY SPEEDWAY -70' OF PAVEMENT AND 75' OF SIDEWALK - DODGE -140' TOTAL OF SIDEWALK( 115') AND NEW CONCRETE APRON(25') ELECTRIC POWER TO POLE; 12' 6" LENGTH OF TRENCH; 3' WIDE; 46" DEEP (THIRD TELEPHONE POLE OFF DODGE) WATER; 6' LENGTH; 2'WIDE; 36" DEEP. WEEKENDS ONLY FEB 8 - MARCH 22 10AM -6PM
Completed Inspections
Permit Status: Final
Permit Number: T20RW00850
Permit Description: DP19-0208 - DUTCH BROTHERS SPEEDWAY
SPEEDWAY -70' OF PAVEMENT AND 75' OF SIDEWALK - DODGE -140' TOTAL OF SIDEWALK( 115') AND NEW CONCRETE APRON(25') ELECTRIC POWER TO POLE; 12' 6" LENGTH OF TRENCH; 3' WIDE; 46" DEEP (THIRD TELEPHONE POLE OFF DODGE) WATER; 6' LENGTH; 2'WIDE; 36" DEEP. WEEKENDS ONLY FEB 8 - MARCH 22 10AM -6PM
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/18/2020 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Final Inspection. No Further issues. |