Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
01/10/2020
Applicant:
B & F CONTRACTING
Description:
B&F Contracting Inc. will be performing an excavation Repair located 308-328 from MH# 8557-04. CIPP lining of 397 lf of 8'' sewer to follow. In order to perform these tasks B&F will set up a temporary bypass with 6'' discharge line (above ground) as shown on the site plan. Traffic control will consist ot a east bound right lane closure for Tanque Verde rd. Wrightstown access will be provided.a North bound mid shift for N Camino Pio Decimo to the intersection of Tanque Verde rd and left turns only allowed onto E Tanque Verde Rd. from Camino decimo north bound. Please see site Plan for more detail.
Contractors:
  • OLSEN PRECAST STRUCTURES
  • PROFESSIONAL PIPE SERVICES

Completed Inspections

Permit Status: Final
Permit Number: T20RW00145
Permit Description: B&F Contracting Inc. will be performing an excavation Repair located 308-328 from MH# 8557-04. CIPP lining of 397 lf of 8'' sewer to follow. In order to perform these tasks B&F will set up a temporary bypass with 6'' discharge line (above ground) as shown on the site plan. Traffic control will consist ot a east bound right lane closure for Tanque Verde rd. Wrightstown access will be provided.a North bound mid shift for N Camino Pio Decimo to the intersection of Tanque Verde rd and left turns only allowed onto E Tanque Verde Rd. from Camino decimo north bound. Please see site Plan for more detail.
Total Completed Inspections - 1
Date Description Inspector Results Comments
05/01/2020 TDOT-EXCAV GENERAL INSPECTION MVV Approved Striping completed. Closed.

Documents

File Name Document Type  
T20RW00145 R1.PDF ROW-RIGHT OF WAY VIEW
T20RW00145.PDF ROW-RIGHT OF WAY VIEW