Permit: T20CM08819
Permit Details
Apply Date:
12/16/2020
Applicant:
Jim and Denise Baldwin
Description:
SFR
Architects:
- Residential and Renovation Engineering
Contractors:
- Jim and Denise Baldwin
Permit Reviews
Permit Number - T20CM08819
Permit Status: Final
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/02/2021 | RESUBMITTAL | 02/04/2021 | COMPLETED |
| 02/04/2021 | RESUBMITTAL | 02/23/2021 | COMPLETED |
| 12/16/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 02/02/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T20CM08819
Permit Description: SFR
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2021 | TEP CLEARANCE - AM | DQUINN | Approved | CODE TMPP |
| 03/16/2021 | ELECTRIC - CONSTRUCTION POWER | DQUINN | Approved | Ap Clear tmpp |
| 03/30/2021 | PLUMBING - ROUGH, SOIL | RELEFANTE | Approved | |
| 03/30/2021 | PLUMBING - ROUGH, SOIL | RELEFANTE | Approved | |
| 03/31/2021 | ELECTRIC - UNDERGROUND | DQUINN | Approved | |
| 04/01/2021 | PLUMBING - SEWER HCS CONNECT | DQUINN | Approved | |
| 04/05/2021 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | Ap |
| 04/05/2021 | BUILDING PRE-SLAB | DQUINN | Approved | Ap |
| 04/05/2021 | ELECTRIC - UFER | DQUINN | Approved | Ap |
| 05/03/2021 | EXT METAL CLIPS/EXT SHEATHING | RELEFANTE | Approved | |
| 05/05/2021 | FRAMING | RELEFANTE | Approved | |
| 05/05/2021 | ROOF NAILING | RELEFANTE | Approved | |
| 05/19/2021 | MECHANICAL - INTERMEDIATE | RELEFANTE | Approved | |
| 05/19/2021 | PLUMBING - GAS PRESSURE TEST | RELEFANTE | Approved | |
| 05/19/2021 | PLUMBING - YARD WTR LINE/TEST | RELEFANTE | Approved | |
| 05/19/2021 | PLUMBING - INTERMEDIATE | RELEFANTE | Approved | |
| 06/10/2021 | FIRE SPKLR - OH PIPING & HYDRO | MRoss | Approved | 60 psi on system *Water meter is required to be at least a 3/4"x3/4" meter. Currently installed is a 5/8"x3/4". Also need to confirm that there isn't a backflow on the water supply. |
| 06/16/2021 | RESIDENTIAL INTERMEDIATE | RELEFANTE | Approved | AP |
| 06/16/2021 | FIRE SPKLR - UG PIPING FLUSH | MRoss | Approved | Water supply is included with the domestic water line. |
| 06/16/2021 | FIRE SPKLR - UG, PIPING, HYDRO | MRoss | Approved | Water supply is included with the domestic water line. |
| 09/20/2021 | GAS CLEARANCE | RELEFANTE | Approved | CODE |
| 09/20/2021 | TEP CLEARANCE - PM | RELEFANTE | Approved | CODE ECO |
| 09/20/2021 | MECHANICAL - FINAL | RELEFANTE | Approved | AP |
| 09/20/2021 | PLUMBING - FINAL | RELEFANTE | Approved | AP Clear gas meter release |
| 09/20/2021 | ELECTRIC - FINAL | RELEFANTE | Approved | AP Clear ECO |
| 10/21/2021 | OUTDOOR LIGHTING FINAL | DQUINN | Approved | Ap Close permit |
| 10/21/2021 | BUILDING - FINAL | DQUINN | Approved | Ap |
| 10/21/2021 | FIRE SPKLR - FINAL | wmotto | Approved |