Permit: T20CM08647
Permit Details
Apply Date:
12/10/2020
Applicant:
Denny Hawkins
Description:
Existing meter is inside building. Move service outside. Upgrade service from 3 phase 200amp to 3 phase 400amp. Install TEP CT can with meter. Set 6x6 N3R gutter next to CT can. Feed (2) 200amp fused disconnects from CT can. One disconnect is for future use, no new load planned at this time. One disconnect is to refeed panel A that is existing. Install 2" conduit from panel A disconnect to panel A with 4-3/0 THHN Cu. wires and #6 ground. No new loads added.
Contractors:
- Hawkins Electric
Permit Reviews
Permit Number - T20CM08647
Permit Status: Final
Permit Description: Existing meter is inside building. Move service outside. Upgrade service from 3 phase 200amp to 3 phase 400amp. Install TEP CT can with meter. Set 6x6 N3R gutter next to CT can. Feed (2) 200amp fused disconnects from CT can. One disconnect is for future use, no new load planned at this time. One disconnect is to refeed panel A that is existing. Install 2" conduit from panel A disconnect to panel A with 4-3/0 THHN Cu. wires and #6 ground. No new loads added.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/02/2021 | RESUBMITTAL | 03/11/2021 | COMPLETED |
| 12/10/2020 | OTHER | 01/14/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T20CM08647
Permit Description: Existing meter is inside building. Move service outside. Upgrade service from 3 phase 200amp to 3 phase 400amp. Install TEP CT can with meter. Set 6x6 N3R gutter next to CT can. Feed (2) 200amp fused disconnects from CT can. One disconnect is for future use, no new load planned at this time. One disconnect is to refeed panel A that is existing. Install 2" conduit from panel A disconnect to panel A with 4-3/0 THHN Cu. wires and #6 ground. No new loads added.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2021 | TEP CLEARANCE - PM | DQUINN | Approved | CODE INCR |
| 05/25/2021 | ELECTRIC - SERVICE UPGRADE | DQUINN | Approved | APPROVED NEED CUTOVER FOR FINAL |
| 05/25/2021 | ELECTRIC - TEMPORARY SERVICE | DQUINN | Approved | APPROVED NEED CUTOVER FOR FINAL |
| 05/25/2021 | ELECTRIC - INTERMEDIATE | DQUINN | Approved | APPROVED NEED CUTOVER FOR FINAL |
| 06/23/2021 | ELECTRIC - FINAL | TGAUSP | Approved |