Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
1990 N 7TH AV
Address NEW:
1990 N 7TH AV
Apply Date:
12/10/2020
Applicant:
Denny Hawkins
Description:
Existing meter is inside building. Move service outside. Upgrade service from 3 phase 200amp to 3 phase 400amp. Install TEP CT can with meter. Set 6x6 N3R gutter next to CT can. Feed (2) 200amp fused disconnects from CT can. One disconnect is for future use, no new load planned at this time. One disconnect is to refeed panel A that is existing. Install 2" conduit from panel A disconnect to panel A with 4-3/0 THHN Cu. wires and #6 ground. No new loads added.
Contractors:
  • Hawkins Electric

Permit Reviews

Permit Number - T20CM08647
Permit Status: Final
Permit Description: Existing meter is inside building. Move service outside. Upgrade service from 3 phase 200amp to 3 phase 400amp. Install TEP CT can with meter. Set 6x6 N3R gutter next to CT can. Feed (2) 200amp fused disconnects from CT can. One disconnect is for future use, no new load planned at this time. One disconnect is to refeed panel A that is existing. Install 2" conduit from panel A disconnect to panel A with 4-3/0 THHN Cu. wires and #6 ground. No new loads added.
Start Date Submittal Complete Date Status  
03/02/2021 RESUBMITTAL 03/11/2021 COMPLETED Review Details
12/10/2020 OTHER 01/14/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T20CM08647
Permit Description: Existing meter is inside building. Move service outside. Upgrade service from 3 phase 200amp to 3 phase 400amp. Install TEP CT can with meter. Set 6x6 N3R gutter next to CT can. Feed (2) 200amp fused disconnects from CT can. One disconnect is for future use, no new load planned at this time. One disconnect is to refeed panel A that is existing. Install 2" conduit from panel A disconnect to panel A with 4-3/0 THHN Cu. wires and #6 ground. No new loads added.
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/25/2021 TEP CLEARANCE - PM DQUINN Approved CODE INCR
05/25/2021 ELECTRIC - SERVICE UPGRADE DQUINN Approved APPROVED NEED CUTOVER FOR FINAL
05/25/2021 ELECTRIC - TEMPORARY SERVICE DQUINN Approved APPROVED NEED CUTOVER FOR FINAL
05/25/2021 ELECTRIC - INTERMEDIATE DQUINN Approved APPROVED NEED CUTOVER FOR FINAL
06/23/2021 ELECTRIC - FINAL TGAUSP Approved

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW