Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1235 S CAMINO ARRIBA
Apply Date:
11/05/2020
Applicant:
Inai Maldonado
Description:
Addition to the front of the house.

Permit Reviews

Permit Number - T20CM07680
Permit Status: Complete
Permit Description: Addition to the front of the house.
Start Date Submittal Complete Date Status  
11/05/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 12/14/2020 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM07680
Permite Description: Addition to the front of the house.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T20CM07680
Permit Description: Addition to the front of the house.
Total Completed Inspections - 18
Date Description Inspector Results Comments
10/11/2021 COT - RSPL - Yard Water Line Passed {Activity date: 10/11/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill} ; {Activity date: 10/08/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by VVERA1 - Cancelled}
10/11/2021 COT - RSPL - Rough Soil Passed {Activity date: 10/11/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/08/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by VVERA1 - Cancelled}
10/18/2021 COT - RSBU - Preslab Passed {Activity date: 10/18/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
10/18/2021 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 10/18/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
05/13/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/13/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE INCR}
05/13/2022 COT - RSEL - Construction Power Passed {Activity date: 05/13/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. The TEP clearance code is INCR.}
06/21/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/21/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
07/19/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 07/19/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/08/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
07/19/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 07/19/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
08/09/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 08/03/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready see previous notes.
} ; {Activity date: 07/19/2022; Status: Correction Required; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - corrections required secure all electrical cables and make up boxes
}
08/09/2022 COT - LCBU - Framing Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 08/03/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. See previous notes. Need access and someone on site.} ; {Activity date: 07/19/2022; Status: Correction Required; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - corrections required provide fire stop at all top plate penetrations} ; {Activity date: 03/29/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, pending intermediates}
08/09/2022 RSME - Mechanical Progress Passed {Activity date: 08/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 08/03/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready see previous notes.
} ; {Activity date: 07/19/2022; Status: Correction Required; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - corrections required, tie in all exhaust fans to electrical circuits.}
02/01/2023 COT - BULD - SWG Clearance Passed clearance for Southwest Gas
02/01/2023 COT - RSEL - Outdoor Lighting Passed
02/10/2023 COT - RSPL - Plumbing Final Passed
02/10/2023 RSBU - Building Final Passed building is complete.
02/10/2023 COT - RSEL - Electrical Final Passed All electrical outlets are installed and functional. Electrical panel is labeled
02/10/2023 COT - RSME - Mechanical Final Passed Mechanical equipment is installed and functional. Air registers are installed

Documents

File Name Document Type  
'PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
1_APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
1_APPLICATION.PDF DOCUMENTS VIEW
1_PLAN SET.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
T20CM07680 L OF C.PDF DOCUMENTS VIEW