Permit: T20CM06846
Permit Details
Apply Date:
10/05/2020
Applicant:
Paolo DeLorenzo
Description:
SFR
Permit Reviews
Permit Number - T20CM06846
Permit Status: Complete
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/05/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/20/2020 | COMPLETED |
10/20/2020 | RESUBMITTAL | 12/07/2020 | COMPLETED |
10/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - T20CM06846
Permit Status: Complete
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/05/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T20CM06846
Permite Description: SFR
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T20CM06846
Permit Description: SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/26/2021 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/26/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
11/26/2021 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 11/26/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
11/26/2021 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 11/26/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - CODE ECO} | |
11/26/2021 | COT - RSEL - Construction Power | Passed | {Activity date: 11/26/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved Clear TEP ECO} | |
11/26/2021 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 11/26/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/14/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Retaining wall footing for South, East, North walls. Ok to place concrete in progress areas.} | |
01/12/2022 | COT - RSBU - Preslab | Passed | {Activity date: 01/12/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Interior slabs. Ensure progress areas are termite treated.} ; {Activity date: 01/07/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. Slab at GL: A-B/8-11; 4-6 - A-B, steps. Ok to place concrete in progress areas.} | |
02/03/2022 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 02/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved and complete to top course bond beam at main house and detached bedrooms. } ; {Activity date: 01/20/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VVERA1 - Partial. First lift at 0”-48” FFE on main building and garage. Ok to place grout in progress areas. } |
|
02/18/2022 | COT - RSPL - Sewer | Passed | {Activity date: 02/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved 4” AB connected into 8” clay main, okay to backfill and pave} | |
06/03/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to dry in roof system. } |
|
06/30/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/30/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Sewer connection to main line located in street (progress area in street covered and repaved. Ok to cover remainder of sewer line. } ; {Activity date: 01/04/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial approval for water and sewer within building pad} |
|
08/25/2022 | COT - LCBU - Framing | Passed | {Activity date: 08/25/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
08/25/2022 | RSME - Mechanical Progress | Passed | {Activity date: 08/25/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
08/30/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover walls} ; {Activity date: 08/26/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled} ; {Activity date: 08/25/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Electric intermediate only.} | |
08/30/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - CODE} | |
08/30/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 08/30/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved Clearance: Ok to set new gas meter. Called in to SW Gas at 1505 hours} ; {Activity date: 08/26/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled} ; {Activity date: 08/25/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Leak in gas line, will not hold test pressure.} ; {Activity date: 01/04/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR} |
|
01/31/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed | accomplished on the old system | |
01/31/2023 | COT - RSEL - Electrical Underground | Passed | ||
01/31/2023 | COT - LCPL - Plumbing Intermediate | Passed | accomplished on the old system | |
01/31/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
02/08/2023 | COT - RSME - Mechanical Final | Passed | ||
02/08/2023 | RSBU - Building Final | Passed | exterior grades and gates to be completed on permit T22BU00051 pool build. | |
02/08/2023 | COT - RSPL - Plumbing Final | Passed | ||
02/08/2023 | COT - RSEL - Electrical Final | Passed |