Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
09/14/2020
Applicant:
les Martin
Description:
TI: WHITE BOX

Permit Reviews

Permit Number - T20CM06300
Permit Status: Inspections
Permit Description: TI: WHITE BOX
Start Date Submittal Complete Date Status  
02/07/2022 RESUBMITTAL 03/02/2022 COMPLETED Review Details
03/14/2022 RESUBMITTAL 03/22/2022 COMPLETED Review Details
03/29/2022 RESUBMITTAL 04/15/2022 COMPLETED Review Details
09/09/2020 COMMERCIAL - NEW 10/22/2020 COMPLETED Review Details
12/06/2021 RESUBMITTAL 01/04/2022 COMPLETED Review Details
11/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T20CM06300
Permit Status: Inspections
Permit Description: TI: WHITE BOX
Total Outstanding Activity Conditions - 5
Date Name
09/14/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/14/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
10/14/2020 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/14/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/14/2020 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Conditions

Permit Number - T20CM06300
Permit Status: Inspections
Permit Description: TI: WHITE BOX
Date Description Comments
10/14/2020 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
12/15/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: T20CM06300
Permite Description: TI: WHITE BOX
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
08/29/2023 COT - LCME - Mechanical Final N/A Canceled 8/29/23: cancel per Jose.
10/18/2023 ENGR Engineering Final N/A Partial Pass

Completed Inspections

Permit Status: Inspections
Permit Number: T20CM06300
Permit Description: TI: WHITE BOX
Total Completed Inspections - 23
Date Description Inspector Results Comments
07/22/2022 COT - LCPL - Rough Soil Passed {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/01/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/01/2022 COT - LCBU - Preslab Passed {Activity date: 08/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
02/07/2023 COT - LCEL - Electrical Intermediate Passed
02/07/2023 COT - LCME - Mechanical Intermediate Passed
02/07/2023 COT - LCPL - Plumbing Intermediate Passed
06/09/2023 COT - LCEL - Construction Power Passed TEP ECO
07/10/2023 BULD - Electrical Clearance Passed Building 7 - ECO Clearances to TEP are required for 2 meters (units 7137, 7177)
10/06/2023 COT - LCPL - Plumbing Final Passed
10/06/2023 COT - LCBU - Building Progress Passed
10/06/2023 COT - LCEL - Electrical Underground Passed
10/06/2023 COT - LCBU - Framing Passed
10/06/2023 COT - LCEL - Electrical Above Ceiling Passed
10/06/2023 COT - LCEL - Temporary Service Passed
10/06/2023 COT - LCEL - Electrical Final Passed
10/06/2023 COT - LCME - Mechanical Final Passed
10/06/2023 COT - LCBU - Building Above Ceiling Passed
10/06/2023 COT - LCBU - Sustainability Passed
10/06/2023 COT - LCEL - Outdoor Lighting Passed
10/16/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
10/16/2023 COT - FCON - Fire - Final Passed
02/26/2025 COT - LCBU - Building Final Passed 10/2/23: building is not ADA compliant.

11/2/23: OK to issue TCO level 4

2/26/25: OK For CofO. Pending conditions.
02/26/2025 ENGR Engineering Final Passed No issues found, DP has been cleared by Josh and Ben

Documents

File Name Document Type  
CONS-RITA 42 PLAN SET_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
1_AS-BUILT CERTIFICATION FOR DP19-0014 PHASE 2_V1.PDF DOCUMENTS VIEW
BLDG 7 HIGH STRENGHT BOLT_V1.PDF DOCUMENTS VIEW
BLDG 7 REINFORCING STEEL.ANCHOR BOLTSSI REPORT 5-2023-10-30_V1.PDF DOCUMENTS VIEW
CONS-RITA 42 PLAN SET_V1.PDF DOCUMENTS VIEW
REVISED FINAL SI BLDG 7_V1.PDF DOCUMENTS VIEW