Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY ADDITION
Address:
2250 E 8TH ST
Address NEW:
2250 E 8TH ST
Apply Date:
07/10/2020
Applicant:
N/A
Description:
NEW ARIZONA ROOM, KITCHEN EXTENSION & WARDROBE ADDITION
Contractors:
  • MAC3 HOLDINGS, LLC

Permit Reviews

Permit Number - T20CM04361
Permit Status: Final
Permit Description: NEW ARIZONA ROOM, KITCHEN EXTENSION & WARDROBE ADDITION
Start Date Submittal Complete Date Status  
07/10/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/28/2020 COMPLETED Review Details
08/28/2020 RESUBMITTAL 09/18/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM04361
Permit Status: Final
Permit Description: NEW ARIZONA ROOM, KITCHEN EXTENSION & WARDROBE ADDITION
Total Outstanding Activity Conditions - 1
Date Name
07/10/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T20CM04361
Permit Description: NEW ARIZONA ROOM, KITCHEN EXTENSION & WARDROBE ADDITION
Total Completed Inspections - 14
Date Description Inspector Results Comments
10/29/2020 PLUMBING - ROUGH, SOIL ESTEVENS Approved Approved.
11/04/2020 BUILDING PRE-SLAB ESTEVENS Approved Both are approved.
11/04/2020 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved Both are approved.
12/23/2020 FRAMING ESTEVENS Approved Not ready.
12/23/2020 ROOF NAILING ESTEVENS Approved 1025, 1030. Both are approved.
12/23/2020 EXT METAL CLIPS/EXT SHEATHING ESTEVENS Approved 1025, 1030. Both are approved.
04/15/2021 GAS CLEARANCE DQUINN Approved CODE
04/15/2021 PLUMBING - GAS PRESSURE TEST DQUINN Approved
04/15/2021 RESIDENTIAL INTERMEDIATE DQUINN Approved
11/30/2021 BUILDING - FINAL TGAUSP Approved Approved
11/30/2021 ELECTRIC - FINAL TGAUSP Approved Approved
11/30/2021 OUTDOOR LIGHTING FINAL TGAUSP Approved Approved
11/30/2021 PLUMBING - FINAL TGAUSP Approved Approved
11/30/2021 MECHANICAL - FINAL TGAUSP Approved Approved

Documents

File Name Document Type  
APPLICATION (ADDITION) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION (GAS RECONNECT) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GAS DRAWING 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL (ADDITION) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL (GAS RECONNECT) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECHANICAL LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION (ADDITION).PDF DOCUMENTS VIEW
APPLICATION (GAS RECONNECT).PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
GAS DRAWING.PDF DOCUMENTS VIEW
GCL (ADDITION).PDF DOCUMENTS VIEW
GCL (GAS RECONNECT).PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MECHANICAL LOAD CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW